NB/T 11123-2023Safety double prevention mechanism for coal mine - Specification (English PDF)
煤矿安全双重预防机制 规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for NB/T 11123-2023 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
February 6, 2023
Implementation date
August 6, 2023
Scope
NB/T 11123-2023 is the English-translated version of 煤矿安全双重预防机制 规范.
NB/T 11123-2023 is the Chinese energy industry specification for the dual prevention mechanism in coal mine safety, which pairs graded control of safety risks with the investigation and treatment of hidden hazards.
It covers basic requirements such as safety concept, objectives, leadership and management systems, then risk point division, risk identification, assessment and grading, control measures, control checklists and risk warning.
Hidden hazards are dealt with through classification, investigation methods, treatment, supervision, acceptance, the hazard ledger and management of unsafe behaviour.
The remaining clauses address public announcement of major risks and hazards, performance evaluation, information systems, training, continuous improvement through monthly and quarterly analysis, and record keeping. Issued on 6 February 2023, it has applied since 6 August 2023.
Found what you need?
Document preview — NB/T 11123-2023
National Standard of the People's Republic of China
- Classification
- A 00
Issued by: National Energy Administration of the People's Republic of China
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Basic Requirements
- 4.1 Safety Production Concept
- 4.2 Construction and operation objectives
- 4.3 Leadership roles and responsibilities
- 4.4 Relevant institutions and responsibilities
- 4.5 Practitioner consultation and participation
- 4.6 Management System
- 5 Hierarchical management and control of security risks
- 5.1 Risk identification organization
- 5.2 Risk point division and identification object identification
- 5.3 Security risk identification
- 5.4 Safety Risk Assessment and Grading
- 5.5 Formulation of Risk Control Measures
- 5.6 Control Responsibilities and Control Checklist
- 5.7 Security Risk Control
- 5.8 Risk Warning
- 6 Hidden danger investigation and treatment
- 6.1 Hazard classification
- 6.2 Hidden hazard types
- 6.3 Troubleshooting method
- 6.4 Hazard governance
- 6.5 Hidden danger management supervision
- 6.6 Hidden danger control acceptance
- 6.7 Hidden danger ledger
- 6.8 Unsafe Behavior Management
- 7 Announcements
- 7.1 Major Security Risk Announcement
- 7.2 Publicity of hidden dangers
- 8 Performance Evaluation
- 9 Information system construction and application
- 9.1 Basic requirements
- 9.2 System operation and maintenance
- 9.3 Security risk analysis and early warning
- 9.4 Information reporting
- 9.5 Use assessment
- 10 Education and training
- 11 Continuous Improvement
- 11.1 Dynamic Analysis Improvement
- 11.2 Monthly Analysis Summary
- 11.3 Quarterly Analysis Summary
- 11.4 Mechanism for continuous improvement
- 11.5 Dynamic Change Update
- 12 Document Management
- 12.1 Data filing
- 12.2 Shelf life
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1. Structure and Drafting Rules for Standardization Documents" drafting.
Introduction
This document is based on national safety production laws, regulations and standards, and draws on and absorbs international and domestic safety risk classification control and hidden danger elimination.
Relevant standard requirements for investigation and governance construction, as well as the construction and operation experience of dual prevention mechanisms for coal mines in recent years, combined with the safety production and management of the coal industry According to the actual situation of coal mine safety risks, the dual prevention mechanism (hereinafter referred to as the "dual prevention mechanism") has been clarified.
The complete idea and method of construction and operation. The construction and operation of the double prevention mechanism will help promote the "four transformations" of coal mine safety production. "Change", that is. from mainly treating the symptoms to treating both the symptoms and the root causes, and focusing on the root cause; from post-processing to pre-prevention and source treatment; from simple hidden dangers The transformation of investigation and governance to double prevention; the transformation from traditional safety management methods to information management methods, and effectively control safety risks in hidden dangers In the front, the investigation and treatment of hidden dangers should be put in front of the accident. This document aims to provide for coal mines to meet the connotation requirements of the dual prevention mechanism and cover different conditions. These elements together constitute a complete PDCA (Plan-Do-Check-Action) cycle.
The ring can support the effective implementation and continuous improvement of the dual prevention mechanism in coal mines, and continuously improve the company's safety governance capabilities. Coal Mine Safety Double Prevention Mechanism Specification
1 Scope
This document stipulates the basic requirements of the dual prevention mechanism for coal mine safety, hierarchical management and control of safety risks, hidden danger investigation and treatment, announcement publicity, performance Effectiveness evaluation, information system construction and application, education and training, continuous improvement and document management.
This document applies to the construction and operation of the double prevention mechanism for coal mine safety.
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 27921 Risk Management Risk Assessment Technology
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Risk
The combination of the possibility of occurrence of a production safety accident or health damage event and the severity of the consequences. [Source: GB/T 23694-2013, 2.1, modified]
3.2 Risk point
Risk point risksite The parts, places and areas accompanied by risks.
3.3 Identification object
Risky subject in the risk point.
3.4 Risk identification
The process of checking the identified objects in the risk point and identifying the existing or accompanying risks. [Source: GB/T 23694-2013, 4.5.1, modified]
3.5 Risk control measures
In order to reduce the risk to an acceptable level, the corresponding methods and means of elimination, isolation and control are adopted.
3.6 Interested party
Professional teams or individuals who provide products and services under the well (pit) and in key places on the ground.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
Similar standards
How to Download NB/T 11123-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 27921-2023 — Risk management - Risk assessment techniques
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
NB/T 10103-2025 — Technical Specifications for Micro-Site Selection in Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 11123-2023
$120.00