Valid

NB/T 10141-2019Specification for Investigation of Reservoir Special Items for Hydropower Projects (English PDF)

水电工程水库专项工程勘察规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for NB/T 10141-2019 in 30 minutes.

Issued by

NEA

Level / Type

Industry · Recommended

Issue date

June 4, 2019

Implementation date

October 1, 2019

Scope

NB/T 10141-2019 is the English-translated version of 水电工程水库专项工程勘察规程.

NB/T 10141-2019 is a recommended Chinese energy industry standard on the investigation of special items in the reservoir area of a hydropower project. It applies to the surveys carried out on those special engineering items within the project and its reservoir.

The document is classified under CCS P59 and ICS 27.140, among the hydropower engineering standards of the series. The documents it quotes come from several fields, among them GB 50287, GB 50487, GB 50548, NB/T 10129, NB/T 10131, NB/T 10138, DL/T 5049, DL/T 5122, DL/T 5337, TB 10012, JTG C20, JTS 133 and SL 55. Issued on 4 June 2019, it has applied since 1 October 2019.

Found what you need?

Document preview — NB/T 10141-2019

National Standard of the People's Republic of China

ICS
27.140

Issued by: National Energy Administration of the People's Republic of China

Contents

  • 2 Normative references

2 Normative references

NB/T 10141-2019 cites the following standards, which apply in full or in part through the references made to them in its clauses.

GB 50287

GB 50487

GB 50548

NB/T 10129

NB/T 10131

NB/T 10138

DL/T 5049

DL/T 5076

DL/T 5122

DL/T 5170

DL/T 5337

DL/T 5379

TB 10012

JTS 133

SL 55

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download NB/T 10141-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

NB/T 10141-2019

$500.00