NB/T 10129-2019Specification for Preparation of Special Geological Report on Impoundment-Affected Area for Hydropower Projects (English PDF)
水电工程水库影响区地质专题报告编制规程
This is a limited preview
Buy now to download the full PDF (25 pages)
Need quotation for your management?
Get a formal quotation for NB/T 10129-2019 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
June 4, 2019
Implementation date
October 1, 2019
Scope
NB/T 10129-2019 is the English-translated version of 水电工程水库影响区地质专题报告编制规程.
NB/T 10129-2019 is the recommended Chinese energy industry standard for preparing the special geological report on the area affected by impoundment at a hydropower project.
It is applied to the compilation of that report for reservoirs whose surroundings are altered by such projects. The report it governs is one of the specialised geological documents produced during the survey and design of a hydropower scheme.
The standard belongs with hydraulic engineering work, carrying the Chinese classification P59 and the international classification 27.140. GB 50287, NB/T 10131, DL/T 5353 and DL/T 5376 are quoted in it. Issued on 4 June 2019, it has applied since 1 October 2019.
Found what you need?
Document preview — NB/T 10129-2019
National Standard of the People's Republic of China
- ICS
- 27.140
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 10129-2019 cites the following standards, which apply in full or in part through the references made to them in its clauses.
GB 50287
NB/T 10131
DL/T 5353
DL/T 5376
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 25 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download NB/T 10129-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 50287-2016 — Code for hydropower engineering geological investigation
NB/T 10131-2019 — Specification for reservoir area engineering geological investigation of hydropower projects
NB/T 10086-2025 — Regulations for Compiling Energy Conservation Reports for Wind Farm Projects
Secure payment via Stripe
Payments accepted
NB/T 10129-2019
$700.00