NB/T 10137-2019Specification for Engineering Geological Investigation and Treatment of Dangerous Rock Mass in Hydropower Projects (English PDF)
水电工程危岩体工程地质勘察与防治规程
This is a limited preview
Buy now to download the full PDF (30 pages)
Need quotation for your management?
Get a formal quotation for NB/T 10137-2019 in 30 minutes.
Issued by
NEA
Level / Type
Industry · Recommended
Issue date
June 4, 2019
Implementation date
October 1, 2019
Scope
NB/T 10137-2019 is the English-translated version of 水电工程危岩体工程地质勘察与防治规程.
NB/T 10137-2019 is the Chinese energy industry standard for the engineering geological investigation and treatment of dangerous rock masses in hydropower projects.
It applies to the geological survey and the prevention work carried out on the slopes of hydropower project pivot areas, resettlement areas and construction camps.
Filed under the Chinese classification P59, it belongs with the survey and design codes of the hydropower series. It quotes GB 50026, NB/T 35039, NB/T 35115, NB/T 10074, DL/T 5010, DL/T 5050, DL/T 5353, SL 379, TB/T 3089 and JTG D70. Issued on 4 June 2019, it has applied since 1 October 2019.
Found what you need?
Document preview — NB/T 10137-2019
National Standard of the People's Republic of China
- ICS
- 27.140
Issued by: National Energy Administration of the People's Republic of China
Contents
- 2 Normative references
2 Normative references
NB/T 10137-2019 cites the following standards, which apply in full or in part through the references made to them in its clauses.
GB 50026
NB/T 35039
NB/T 35115
DL/T 5010
DL/T 5050
NB/T 10074
DL/T 5337
DL/T 5353
DL/T 5368
SL 379
TB/T 3089
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 30 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 50026Standard for engineering surveying
- NB/T 35039Regulations for geological observation of hydropower projects
- NB/T 35115Specification for Drilling Exploration of Hydropower Projects
- NB/T 10074Specification for Engineering Geological Mapping of Hydropower Projects
- DL/T 5368Rock mass testing procedures for hydropower projects
- SL 379Design specification for hydraulic retaining wall
DL/T 5010 · DL/T 5050 · DL/T 5337 · DL/T 5353 · TB/T 3089
Similar standards
How to Download NB/T 10137-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 5368-2024 — Rock mass testing procedures for hydropower projects
GB 50026-2020 — Standard for engineering surveying
NB/T 10074-2018 — Specification for Engineering Geological Mapping of Hydropower Projects
Secure payment via Stripe
Payments accepted
NB/T 10137-2019
$900.00