Valid

HY/T 147.6-2013Code of practice for marine monitoring technology. Part 6: Marine hydrology, meteorology and sea ice (English PDF)

Preview PDF

This is a limited preview

Buy now to download the full PDF (67 pages)

Need quotation for your management?

Get a formal quotation for HY/T 147.6-2013 in 30 minutes.

Issued by

State Oceanic Administration

Level / Type

National · Recommended

Issue date

April 25, 2013

Implementation date

May 1, 2013

Scope

HY/T 147.6-2013 (Code of practice for marine monitoring technology. Part 6: Marine hydrology, meteorology and sea ice) is available as an English-translated PDF.

HY/T 147.6-2013 — This part of HY/T 147 specifies the main content and methods of marine hydrology, meteorology and sea ice monitoring projects. The scope of application, technical requirements, monitoring procedures and data processing put forward specific requirements.

This part is applicable to the monitoring of marine hydrology, meteorology and sea ice elements in coastal, offshore, open sea and ocean waters.

Found what you need?

Document preview — HY/T 147.6-2013

National Standard of the People's Republic of China

ICS
07.060
Classification
A 45

Issued by: State Oceanic Administration

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 General provisions
  • 4 Water temperature monitoring
  • 5 Seawater salinity monitoring---thermo-salt depth profiler method
  • 6 Ocean current monitoring
  • 7 Wave monitoring
  • 8 Water level monitoring
  • 9 Monitoring of Marine Meteorological Elements-Automatic Weather Station Method
  • 10 Sea ice element monitoring
  • Appendix A (Normative Appendix) Record Sheet

Foreword

HY/T 147 "Marine Monitoring Technical Regulations" is divided into seven parts.

---Part 1: Sea water;

---Part 2: Sediment;

---Part 3: Organisms;

---Part 4: Ocean atmosphere;

---Part 5: Marine ecology;

---Part 6: Marine Hydrology, Meteorology and Sea Ice;

---Part 7: Satellite remote sensing technology methods.

This part is part 6 of HY/T 147.

This section was drafted in accordance with the rules given in GB/T 1.1-2009.

This part was proposed by the National Marine Environmental Monitoring Center.

This part is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283).

Drafting organizations of this section. National Marine Environmental Monitoring Center, North Sea Environmental Monitoring Center of State Oceanic Administration, East China Sea Environmental Monitoring Center of State Oceanic Administration Monitoring Center, South China Sea Environmental Monitoring Center of State Oceanic Administration.

1 Scope

This part of HY/T 147 specifies the main content and methods of marine hydrology, meteorology and sea ice monitoring projects.

The scope of application, technical requirements, monitoring procedures and data processing put forward specific requirements.

This part is applicable to the monitoring of marine hydrology, meteorology and sea ice elements in coastal, offshore, open sea and ocean waters.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 12763.2-2007 Ocean Survey Specification Part 2: Ocean Hydrological Observation GB/T 12763.3-2007 Marine Survey Specification Part 3: Marine Meteorological Observation GB/T 14914-2006 Seashore Observation Specification GB/T 24558 Acoustic Doppler Velocity Profiler

3 General rules

3.1 Monitoring items

Marine hydrology, meteorology and sea ice monitoring projects include the following.

a) Marine hydrology. water temperature, salinity, ocean currents, waves and water levels;

b) Marine meteorology. sea surface wind, air pressure, sea surface air temperature, relative humidity, precipitation, solar radiation, effective sea visibility, clouds, sky Qi phenomenon;

c) Sea ice. ice volume, concentration, temperature, uniaxial compressive strength, maximum horizontal scale of floating ice, drifting speed and direction of floating ice, fixed ice Width and edge line of ice zone;

d) The specific monitoring elements each time should be determined according to the requirements of the monitoring task.

3.2 Matters needing attention

The following points should be paid attention to during the monitoring of marine hydrology, meteorology and sea ice projects.

a) Fully inspect the vessels and equipment used before monitoring to ensure normal operation;

b) Test the voltage of the instrument before monitoring to ensure that the power supply requirements during the monitoring period are met;

c) Calibrate the internal time of the instrument before monitoring;

d) The instruments and equipment used for monitoring shall meet the technical requirements for monitoring of various elements and shall be within the validity period of the verification;

e) When monitoring the same elements at multiple stations simultaneously, the same type of instrument should be used; if different types of instruments are selected, different types of instruments should be used.

The resolution of the detector and the consistency of the measurement results are compared;

f) Before and after each measurement, the instrument should be verified or used for on-site comparison with other instruments of the same accuracy level;

g) The monitoring data should be downloaded immediately after each measurement is completed, and the original data should be stored and analyzed. If the data is found to be abnormal, it should be retested immediately;

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 67 pages — is available in the English PDF.

Referenced standards

How to Download HY/T 147.6-2013

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
67 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

HY/T 147.6-2013

$710.00