GB/Z 36046-2018Evaluation specifications of electricity regulatory (English PDF)
Also coversGBZ36046-2018
Open the GB/Z 36046-2018 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Level / Type
National · Recommended
Issue date
March 15, 2018
Implementation date
October 1, 2018
Scope
GB/Z 36046-2018 (Evaluation specifications of electricity regulatory) is available as an English-translated PDF.
GB/Z 36046-2018 — This guidance technical document specifies the terms and principles of power regulatory evaluation, the evaluation index system, the evaluation indicator description and the evaluation method. This guidance technical document is applicable to different enterprises or institutions such as power generation, transmission, power supply enterprises, dispatching agencies, and contractors (repairs, trials). Evaluation.
Document preview — GB/Z 36046-2018
National Standard of the People's Republic of China
- ICS
- 03.120.99
- Classification
- A 00
Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
Foreword
This guidance technical document was drafted in accordance with the rules given in GB/T 1.1-2009.
This guidance document is submitted by the National Energy Administration.
This guidance document is under the jurisdiction of the National Electricity Regulatory Standardization Technical Committee (SAC/TC296).
This guiding technical document drafting unit. Southern Regulatory Bureau of the National Energy Administration, China National Institute of Standardization.
Introduction
The rapid development of the economy and society puts forward higher requirements for the quality, efficiency, safety risk prevention and control and environmental impact of power supply.
begging. In order to improve the systematic, forward-looking, targeted and effective power supervision, this guidance technical document summarizes the practical experience of power regulation.
On the basis of this, according to the power regulatory regulations, the evaluation norms applied to the supervision of power companies were formulated.
This guidance document is from safety, access and compliance, market and equity, service and quality, environment and energy efficiency, risk prevention and development, and development.
This paper starts with seven aspects, such as efficiency and efficiency, and evaluates different types of supervision. It is expected to become a reference for comprehensive evaluation and supervision of power companies.
in accordance with.
All evaluation indicators of this guidance technical document are based on national laws, administrative regulations, departmental rules and regulations issued by relevant state departments.
Normative document development. The target value of the indicator is set to be. it is conducive to the implementation of the party and state policies and policies, and is conducive to serving the economy and society.
The exhibition is conducive to the scientific development of the power industry and is conducive to maintaining the fundamental interests of power users.
This guidance technical document is a general specification, and relevant organizations can set more specific evaluations based on their own situation and actual needs of supervision.
Indicators, or make necessary adjustments.
Electricity regulatory indicator evaluation specification
1 Scope
This guidance technical document specifies the terms and principles of power regulatory evaluation, the evaluation index system, the evaluation indicator description and the evaluation method.
This guidance technical document is applicable to different enterprises or institutions such as power generation, transmission, power supply enterprises, dispatching agencies, and contractors (repairs, trials).
Evaluation.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 12325-2008 Power quality supply voltage deviation
GB/T 28583-2012 Power Supply Service Specification
3 Terms and definitions
The following terms and definitions as defined in GB/T 12325-2008 and GB/T 28583-2012 apply to this document.
3.1
Target value targetvalue
The optimal or ideal value of an indicator.
3.2
Loss rate
The proportion of individual indicators lost in total loss.
3.3
Trigger value triggeringthreshold
The lower or upper limit of the corresponding regulatory action needs to be activated.
3.4
Deviation deviation
Reflects the individual (class) indicator score or the dispersion of the company's total score relative to the average score.
Note. The greater the degree of deviation, the greater the gap between the companies in the corresponding areas.
3.5
Power generation industry concentration industryconcentrationofpowergeneration
The total installed capacity of the dispatching power plants above the provincial level of the regional (or province) power generation group accounts for the provincial or higher dispatching power plant within the region (or province)
The concentration of all installed capacity.
3.6
Unit cost deviates from the advanced level value costperunitdeviationfromvalueoftheadvancedlevel
The degree of dispersion of enterprise electricity supply costs relative to the industry's advanced level.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Buy GB/Z 36046-2018
- 1Add to cart. Click the "Buy GB/Z 36046-2018" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 12325-2008 — Power quality - Deviation of supply voltage
GB/Z 120.305-2026 — Microgrids - Part 3-5: Testing for microgrid monitoring, control, and energy management systems
GB/Z 121-2026 — Evaluation index system for sustainable rural development
Secure payment via Stripe
Payments accepted
GB/Z 36046-2018
$540.00