GB/Z 34044.10-2020Automation System and Integration Key Performance Indicators of Manufacturing Operation Management - Part 10: Description of Data Acquisition Operation Sequence (English PDF)
Also coversGBZ34044.10-2020
Open the GB/Z 34044.10-2020 preview as PDF
This is a limited preview
Buy now to download the full PDF
Issued by
State Administration for Market Regulation, China National Standardization Administration
Level / Type
National · Recommended
Issue date
November 19, 2020
Implementation date
June 1, 2021
Scope
GB/Z 34044.10-2020 (Automation System and Integration Key Performance Indicators of Manufacturing Operation Management - Part 10: Description of Data Acquisition Operation Sequence) is available as an English-translated PDF.
GB/Z 34044.10-2020 — This guiding technical document describes the application of the key performance index formula specified in GB/T 34044.2 to production control and monitoring the real function. This guiding technical document shall be applied in conjunction with the content of GB/T 34044.2.
Document preview — GB/Z 34044.10-2020
National Standard of the People's Republic of China
- Classification
- N 10
Issued by: State Administration for Market Regulation, China National Standardization Administration
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 KPI calculation example
- 4.1 Example setup
Foreword
The "Key Performance Indicators of Automation System and Integrated Manufacturing Operation Management" is divided into the following parts.
---Part 1.General description, concepts and terminology;
---Part 2.Definition and description;
---Part 3.Interaction and use;
---Part 4.Contact and Subordination;
---Part 10.Description of data acquisition operation sequence.
This guiding technical document is part 10 of "Key Performance Indicators for Automation System and Integrated Manufacturing Operation Management".
The use of translation method in this guiding technical document is equivalent to ISO /T R22400-10.2018 "Automation System and Integrated Manufacturing Operation Management"
Key Performance Indicators of Management Part 10.Description of Data Acquisition Operation Sequence.
This guiding technical document was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This guiding technical document was proposed by China Machinery Industry Federation.
This guiding technical document is under the jurisdiction of the National Automation System and Integration Technical Committee (SAC/TC159).
Drafting units of this guiding technical document. Beijing Machinery Industry Automation Research Institute Co., Ltd., Zhejiang University, Jiangsu Changjiang Intelligent Manufacturing
Research Institute Co., Ltd.
Introduction
This technical guidance document describes the procedures for determining key performance indicators (KPIs) through examples. The KPI used is
Given in GB/T 34044.2.
Automation system and integration
Key performance indicators for manufacturing operations management
Part 10.Description of Data Acquisition Operation Sequence
1 Scope
This guiding technical document describes the application of the key performance index formula specified in GB/T 34044.2 to production control and monitoring
the real function. This guiding technical document shall be applied in conjunction with the content of GB/T 34044.2.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 34044.2-2017 Key performance indicators for automation systems and integrated manufacturing operations management Part 2.Definition and description
Description (ISO 22400-2.2014, IDT)
3 Terms and definitions
The following terms and definitions defined in GB/T 34044.2-2017 apply to this document.
ISO and IEC maintain a terminology database for standardization at the following website.
3.1
Planned downtime
The time the unit of work is not scheduled to run.
3.2
Planned downtime
Contains the time during which the unit of work is planned not to run during the scheduled run time.
Note. Figure 3 in GB/T 34044.2-2017 gives a detailed description of the use timeline of working units in the GB/T 34044 series of standards.
3.3
Unit of work log
Data records of unit of work events and their time stamps.
4 KPI calculation example
4.1 Example setup
Calculate KPIs for different scopes (including work units and production orders). The KPI is determined by the unit of work log.
This example includes two work units (W1 and W2) in a natural day, as shown in Table 1 and Table 2.Here naturally
Within days, execute two production orders (PO1 and PO2) in this production area. Generate a unit of work log for each unit of work.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.
Referenced standards
How to Buy GB/Z 34044.10-2020
- 1Add to cart. Click the "Buy GB/Z 34044.10-2020" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 34044.2-2017 — [Including 2021XG1] Automation systems and integration -- Key performance indicators (KPIs) for manufacturing operations management -- Part 2: Definitions and descriptions
GB/Z 120.305-2026 — Microgrids - Part 3-5: Testing for microgrid monitoring, control, and energy management systems
GB/Z 121-2026 — Evaluation index system for sustainable rural development
Secure payment via Stripe
Payments accepted
GB/Z 34044.10-2020
$485.00