GB/Z 31478-2015Process management for avionics - Preparation of an electronic components management plan (English PDF)
航空电子过程管理 电子元器件管理计划的制定
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/Z 31478-2015 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 15, 2015
Implementation date
May 15, 2015
Scope
GB/Z 31478-2015 is the English-translated version of 航空电子过程管理 电子元器件管理计划的制定.
GB/Z 31478-2015, identical to IEC/TS 62239:2008, explains how avionics manufacturers should prepare an electronic components management plan (ECMP).
The plan has to assure users and oversight bodies that every electronic component selected and used in the equipment under the plan's responsibility is controlled and meets the equipment's end-use requirements.
The document lists the technical requirements the plan must address, drawing on references for electrostatic protection, integrated circuit emissions, obsolescence management, use of semiconductor devices outside the manufacturer's temperature range and atmospheric radiation effects, and then sets out requirements for putting the plan into practice.
It serves manufacturers, distributors, maintenance organizations and other avionics users drafting their own plans. It was issued on 15 May 2015.
Found what you need?
Document preview — GB/Z 31478-2015
National Standard of the People's Republic of China
- ICS
- 49.020
- Classification
- V 04
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations
- 4 technical requirements
- 5 Plan Implementation Requirements
- References
Foreword
This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009.
This guidance document uses the translation method identical with IEC /T S62239.2008 "Avionics Process Management Avionics Piece management plan formulation. "
The drafting of the guidance of technical documents. China Aviation Institute of Integrated Technology, Xi'an Aircraft Industry Institute of Aviation Computing Technology.
Introduction
Electronic equipment is often used in harsh environments, and the aerospace industry requires more stringent requirements on components. Therefore, the avionics industry needs Manage electronic components to ensure the quality and reliability of the electronic components used by the aerospace industry.
IEC /T S62239 is designed to help aerospace equipment manufacturers, distributors, maintenance equipment and other avionics users develop their Your own Electronic Component Management Plan (ECMPs) that performs its process does not require special tasks, does not require additional data collection, and does not require To publish the report. In order to meet the needs of the development of China's avionics process management standards for the provision of effective avionics users The highest rate of avionics process management process, it is necessary to develop appropriate national conditions of China's electronic components management plan. Avionics Process Management Electronic components management plan
1 Scope
This Guidance Document specifies the requirements for the preparation of an avionics management plan (ECMP), which ECMP shall provide to users and management The agency assures that the selection and use of all electronic components used in the equipment responsible for the program are controllable and meet the end-use requirements of the equipment Seek and complete the specific technical requirements in Chapter 4. This guidance applies to avionics manufacturers.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document.
IEC 61340-5-1-2007 Electrostatics - Part 5-1. Electrostatic protection of electronic (equipment) components electronicdevicesfromelectrostaticphenomena-Generalrequirements)
IEC 61340-5-2-2007 Electrostatics - Part 5-2. Electronic (equipment) components Electrostatic protection User's guide (Protectionof electronicdevicesfromelectrostaticphenomena-Userguide)
IEC 61967-1:2002 integrated circuit electromagnetic radiation measurement (Integratedcircuits-Measurementofelectromag-neticemissions)
IEC 62402.:2007 Obsolescence management-Application guide IEC /T R62240 avionics process management requirements for use of semiconductor devices outside rated temperature range (Process managementforavionics-Useof semiconductordevicesoutsidemanufacturers'specifiedtemperature range IEC /T S62396 (all parts) Avionics Process Management Atmospheric Radiation Effects (Processmanagementfor avionics-Atmospheric radiation effects)
3 Terms, definitions and abbreviations
3.1 Terms and definitions
The following terms and definitions apply to this document.
Note Planners may use terms in their plans that are consistent with their organization's internal agreements.
3.1.1 Avionics equipment environment
In the equipment production cycle and maintenance life (maintenance life length by the equipment manufacturers and users to negotiate the decision), the equipment performance is not loss Or degraded conditions, the equipment must withstand the environmental conditions (see equipment manual).
3.1.2 Inherent ability
Components under normal conditions can be used under normal conditions.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
IEC 61340-5-1-2007 · IEC 61340-5-2-2007 · IEC 61967-1:2002 · IEC 62402
Similar standards
How to Download GB/Z 31478-2015
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/Z 102.17-2026 — Semiconductor devices - Discrete devices - Part 17: Magnetic and capacitive coupler for basic and reinforced insulation
GB/Z 103-2026 — Health informatics - The architecture of internet healthcare service network
GB/Z 108-2026 — Health informatics - Internet healthcare service pattern
GB/Z 31478-2015
$235.00