GB/Z 25320.1003-2023Power systems management and associated information exchange - Data and communication security - Part 100-3: Conformance test cases for IEC 62351-3, the secure communication extension for profiles including TCP/IP (English PDF)
电力系统管理及其信息交换 数据和通信安全 第100-3部分:IEC 62351-3的一致性测试用例和包括TCP/IP协议集的安全通信扩展
This is a limited preview
Buy now to download the full PDF (21 pages)
Need quotation for your management?
Get a formal quotation for GB/Z 25320.1003-2023 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 28, 2023
Implementation date
December 28, 2023
Scope
GB/Z 25320.1003-2023 is the English-translated version of 电力系统管理及其信息交换 数据和通信安全 第100-3部分:IEC 62351-3的一致性测试用例和包括TCP/IP协议集的安全通信扩展.
GB/Z 25320.1003-2023 is Part 100-3 of the Chinese series on data and communication security for power systems management, a modified adoption of IEC TS 62351-100-3:2020.
It supplies conformance test cases for IEC 62351-3, which protects TCP/IP-based communication with TLS in telecontrol equipment, substation automation systems and SCADA front-end computers.
The content covers the conformance test structure and requirements, verification of configuration parameters, normal-process and robustness test cases, and tables for recording results.
It checks that TLS is integrated consistently but does not test the TLS protocol itself, nor safety or EMC requirements. Passing these tests reduces, without removing, the risk that devices from different suppliers fail to interoperate. It was issued on 28 December 2023.
Found what you need?
Document preview — GB/Z 25320.1003-2023
National Standard of the People's Republic of China
- ICS
- 29.240.01
- Classification
- F 21
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- PrefaceI
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations
- 3.1 Terms and definitions
- 3.2 Abbreviations
- 4 Overview
- 4.1 Standards covered by this document
- 4.2 Conformance test structure
- 4.3 Conformance testing requirements
- 5 Verification of configuration parameters
- 5.1 Overview
- 5.2 Configuration parameters
- 6 Verification of IEC 62351-3
- 6.1 Overview
- 6.2 Normal process test case
- 6.3 Flexible test cases
- 7 Test results table
- 7.1 Verification of configuration parameters
- 7.2 Verification required by IEC 62351-315 Reference
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1. Structure and Drafting Rules of Standardization Documents" Drafting.
This document is Part 100-3 of GB/T (Z) 25320 "Power System Management and Information Exchange Data and Communication Security". GB/T (Z)25320 has released the following parts.
---Part 1. Introduction to communication network and system security issues;
---Part 2. Terminology;
---Part 3. Communication network and system security including TCP/IP protocol set;
---Part 4. Protocol set including MMS;
---Part 5. Safety of GB/T 18657 and other standards and their derivatives;
---Part 6. Safety of IEC 61850;
---Part 7. Data Object Model for Network and System Management (NSM);
---Part 11. Security of XML files;
---Part 100-1. Conformance test cases for IEC TS62351-5 and IEC TS60870-5-7;
---Part 100-3. Conformance test cases for IEC 62351-3 and secure communication extensions including the TCP/IP protocol set.
This document is modified to adopt IEC TS62351-100-3:2020 "Power system management and its information exchange data and communication security" Part 100-3. Conformance test cases for IEC 62351-3 and secure communication extensions including the TCP/IP protocol suite. File type by IEC The technical specifications were adjusted into my country's national standardization guiding technical documents.
The technical differences and reasons between this document and IEC TS62351-100-3:2020 are as follows:
---Deleted the content of "Reference Standard Requirements". The "reference standard requirements" have been deleted from the new version of the standard, and the corresponding content has been deleted from this document.
Introduction
GB/T (Z) 25320 "Power System Management and Information Exchange Data and Communication Security", which aims to reduce communication and computing as much as possible In order to avoid the harm caused by malicious attacks in the computer network to the data and communication security of the power system, it is necessary to improve the communication protocols at all levels used in the power system. discuss security vulnerabilities and improve the security management of power system information infrastructure. It is planned to consist of the following parts.
---Part 1. Introduction to communication network and system security security issues. The purpose is to introduce other parts of GB/T (Z)25320 It mainly introduces readers to all aspects of information security applied to power system operation.
---Part 2. Terminology. The purpose is to introduce the key terms used in GB/T (Z) 25320.
---Part 3. Communication Network and System Security includes the TCP/IP protocol set. The purpose is to specify how transmission is limited to specifications of the messages, processes and algorithms of layer security protocols, and provide security protection for TCP/IP-based protocols so that these protocols can Suitable for IEC TC57 telecontrol environment.
---Part 4. Contains the protocol set of MMS. The purpose is to describe the use of GB/T 16720 (ISO /IEC 9506) to create messages Some mandatory and optional security specifications that should be implemented when standardizing MMS.
---Part 5. Security of GB/T 18657 and other standards and their derivatives. The purpose is to define the application configuration file (a-profile) Secure communication mechanism that specifies the secure operation of all protocols based on or derived from IEC 60870-5 Protected messages, processes and algorithms.
---Part 6. Safety of IEC 61850. The purpose is to specify the operation of all protocols based on or derived from IEC 61850. Messages, processes and algorithms for security protection.
---Part 7. Data Object Model for Network and System Management (NSM). The purpose is to define the characteristics unique to power system operation. A data object model for network and systems management.
---Part 8. Role-based access control for power system management. The purpose is to provide role-based access for power system management. Ask about control.
---Part 9. Network security key management of power system equipment. The purpose is to manage by specifying or restricting the keys to be used Options to define requirements and technologies for achieving key management interoperability.
---Part 10. Security Architecture Guidelines. The purpose is to describe guidelines for a power system security architecture based on basic security controls.
---Part 11. Security of XML files. The purpose is to standardize the configuration file (XML file) in the communication process of smart substations security.
---Part 12. Security recommendations for distributed energy resources (DER) cyber-physical systems and power systems. The aim is to improve the distribution security and reliability of renewable energy (DER) systems.
---Part 13. Guidelines on security topics covering standards and specifications. The purpose is to provide standards and specifications for use in the power industry What safety issues could or should be covered in (IEC or other).
---Part 90-1. Guidelines for handling role-based access control in power systems. The purpose is to develop customizations for defining and designing Roles and a standardized approach to role mapping.
---Part 90-2. Deep packet inspection for encrypted communications. The purpose is to describe the methods applied to communication channels protected by IEC 62351 DPI latest technology.
---Part 90-3. Network and system management guidelines. The purpose is to provide guidelines for handling IT and OT data.
---Part 100-1. Conformance test cases for IEC TS62351-5 and IEC TS60870-5-7. The purpose is to provide Test cases for conformance and/or interoperability testing of IEC 62351-5:2023 and IEC TS60870-5-7:2013.
---Part 100-3. Conformance test cases for IEC 62351-3 and secure communication extensions including the TCP/IP protocol set. Purpose It provides IEC 62351-3:2023 conformance test cases and verifies all aspects that affect security extensions and protocol behavior. Configuration of parameters.
---Part 100-6. Network security conformance testing of IEC 61850-8-1 and IEC 61850-9-2. The purpose is to provide changes Test cases for conformance testing of data and communication security interoperability of power plant automation systems and telecontrol systems.
GB/T (Z) 25320 "Power System Management and Information Exchange Data and Communication Security" defines power system-related communication protocols (IEC 60870-5, IEC 60870-6, IEC 61850, IEC 61970 and IEC 61968 series) data and communication security also defines the communication Security threats and security attacks that may be encountered during the communication process, as well as security countermeasures.
1 Scope
This document provides data and communication security testing of telecontrol equipment, substation automation systems (SAS) and SCADA front-end computers. case.
This document provides a standard test method for protocol implementations to achieve interoperability to verify that equipment meets the requirements of IEC 62351-3. symbol The consistency of standards does not guarantee interoperability between different devices, but it is expected that using this document to test will reduce the risk of non-interoperability to a minimum. lowest. The basic condition for interoperability is that both devices pass conformance testing.
This document specifies generally applicable procedures and definitions for conformance and/or interoperability testing of IEC 62351-3. This document defines The conformance test cases focus on verifying the consistent integration of the underlying authentication/encryption protocol (TLS) specified in IEC 62351-3 to protect Communication based on TCP/IP.
This document does not cover testing the underlying authentication/encryption protocols over TCP/IP (TLS) required by IEC 62351-3. based on Conformance testing of the TCP/IP authentication/encryption protocol is beyond the scope of this document.
This document deals with data and communications security conformance testing and does not cover other requirements such as security or EMC. These requests are made by other Standards (if applicable) are covered, and proof of compliance with this part follows other standards.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.
GB /Z 25320.2-2013 Power system management and information exchange data and communication security Part 2. Terminology (IEC TS62351-2:2008,IDT)
IEC 62351-3:2023 Power system management and information exchange data and communication security Part 3. Communication networks and systems includingTCP/IP)
Note: GB /Z 25320.3-2010 Power system management and information exchange data and communication security Part 3. Communication network and system security package Protocol set including TCPIP (IEC TS62351-3:2007, IDT)
3 Terms, definitions and abbreviations
3.1 Terms and definitions
The terms and definitions defined in GB /Z 25320.2-2013 and the following apply to this document.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.
Referenced standards
Normative references
IEC 62351-3:2023
Similar standards
How to Download GB/Z 25320.1003-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/Z 25320.2-2013 — Power systems management and associated information exchange - Data and communications security - Part 2: Glossary of terms
GB/Z 25320.1001-2023 — Power systems management and associated information exchange - Data and communication security - Part 100-1: Conformance test cases for IEC 62351-5 and IEC TS 60870-5-7
GB/Z 25320.7-2015 — Power systems management and associated information exchange - Data and communications security - Part 7: Network and system management (NSM) data object models
Secure payment via Stripe
Payments accepted
GB/Z 25320.1003-2023
$360.00