Scope
GB/T 8395-2026 is the English-translated version of 吊环.
GB/T 8395-2026 is the Chinese national standard covering the gymnastics rings - the ring itself and its material, the straps and cables, the frame and its height, and the strength of an assembly that has to hold a gymnast swinging through a full circle. It replaces GB/T 8395-2007 and takes effect on 1 May 2027. It was issued on 30 April 2026 and takes effect on 1 May 2027, replacing GB/T 8395-2007. The document is under the responsibility of the China National Light Industry Council. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.
Document preview — GB/T 8395-2026
National Standard of the People's Republic of China
- ICS
- 97.220.30
- Classification
- Y 55
- Replacing
- GB/T 8395-2007
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 5 Requirements
- 5.1 Appearance and Structure
- 5.3 Performance
- 6 Test Methods
- 6.3 Performance
- 6.3.1 Test Conditions
- 7 Inspection Rules
- 7.2 Factory Inspection
- 7.3 Type Testing
- 8 Marking, Packaging, Transport and Storage
5.1 Appearance and Structure
5.1.1 The ring material should be wood or non-metallic synthetic material, and the surface should not be treated in any other way except for sanding, so as to maintain the natural color of the material.
5.1.2 The surface of the ring should be flat, the stitching thread spacing should be uniform, and it should not scratch the skin.
5.1.3 The accessible surfaces of the lifting rings should not have sharp corners, sharp edges, or burrs. Edges and sharp corners should be rounded or protected.
5.1.4 The protective layer of metal parts shall be free from defects such as missed coating, paint cracks, blistering, pores, exposed substrate, and scratches.
5.1.5 The welded joints should be free from defects such as porosity, slag inclusions, and incomplete welds.
5.1.6 The height of the lifting ring frame should be adjustable, the lifting and lowering should be flexible, and the positioning and locking should be reliable.
5.1.7 The crossbeam shall have a suspension device that can suspend two rings, and the slings of the suspension device shall be wrapped with smooth synthetic material.
5.1.8 The base of the column should have an increased area.
5.2 Basic Dimensions The basic dimensional parameters shall conform to the specifications in Figure 1, Figure 2 and Table 1.
5.3 Performance
5.3.1 Suspension device The suspension device should be able to swing freely, and the connection between the top and the horizontal beam and the sling should be able to rotate freely when the loop is under stress.
5.3.2 Static Load After the test in 6.3.3, the maximum deformation of the inner diameter of the competition-type lifting ring should be <=5mm. After removing the external force, the ring should not deform. The sling and strap should not be damaged. After the external force is removed from a standard lifting ring, the ring should not deform, and the sling and strap should not be damaged.
5.3.3 Ultimate Load of the Cable System After the test in 6.3.4, the rope system should not come loose, detach from the weld, or break. The rope tensioner should operate flexibly, and there should be no visible residue after the external force is removed. Deformation.
5.3.4 Corrosion resistance of electroplated coating After the test in 6.3.5, the electroplated parts should not show signs of corrosion.
6 Test Methods
6.1 Appearance and structural inspection Sensory inspection under normal lighting conditions.
6.2 Basic Dimension Inspection The measurements were taken using a vernier caliper with a graduation of
0.02 mm and a steel tape measure with a graduation of
0.5 mm.
6.3.1 Test Conditions
6.3.1.1 The test ring should be placed in an environment with a relative humidity of 30%~70% and a temperature of 20°C±5°C for 24 hours, and then placed in the same environment. Conduct the test.
6.3.1.2 The lifting ring is installed securely, and the lowest point of the inner diameter of the ring is 2900mm ± 5mm above the ground.
6.3.2 Suspension device Visual inspection under normal lighting conditions.
6.3.3 Static Load A static load is applied to the ring using a rope with a width of 35mm ± 1mm, and then evenly applied to the racing ring for 1 to 2 minutes. Apply a static load of 4000N±40N rapidly, and then apply a static load of 3000N±40N uniformly over a standard lifting ring for 1-2 minutes. The load (F), see Figure 3, is measured. The maximum deformation is measured. After the load is removed, the condition of the rings, slings and belts is checked. They should meet the requirements of 5.3.2.
6.3.4 Ultimate Load of the Cable System Take a steel wire rope with a length of 500mm ± 30mm and rigging at both ends, a chain with a length of 600mm ± 50mm, and a length of... Three sets of specimens, including a tensioner and connector with a diameter of 380mm ± 30mm, were fixed on a tensile testing machine with an accuracy of
0.5 grade and tested at a speed of 10mm/min. The load is applied at a speed of 8000 N and held for 5 min. All three groups of samples should meet the requirements of 5.3.3.
6.3.5 Corrosion resistance of electroplated coating Take the part to be tested or a specimen of the same material as the part to be tested, and conduct a neutral salt spray test according to GB/T 10125.The test cycle is 144 hours. Observe the changes in the sample.
7 Inspection Rules
7.1 Inspection Classification Inspection is divided into factory inspection and type inspection.
7.2 Factory Inspection
7.2.1 Inspection Quantity Each lifting ring product should be inspected before leaving the factory.
7.2.2 Inspection Items The inspection shall be carried out in accordance with the factory inspection items, requirements and test methods specified in Table 2.
7.2.3 Judgment Rules All factory inspection items for the lifting rings meet the requirements; therefore, the lifting rings are deemed (qualified) upon leaving the factory. If any item fails to meet the requirements, the lifting rings are deemed (qualified) upon leaving the factory. The factory inspection was unsatisfactory.
7.3 Type Testing
7.3.1 Type testing shall be conducted under any of the following circumstances.
a) New product trial production and type approval or new product transfer to another factory for trial production and type approval;
b) Changes in design, manufacturing process, or materials may affect product quality;
c) During normal production, this should be carried out once every 2 years;
d) Production resumes after a shutdown of more than six months;
e) The factory inspection results differed significantly from the previous type inspection results.
7.3.2 For type testing, one pair of lifting rings shall be randomly selected from the batch that has passed factory inspection, and the type testing shall be conducted according to the type testing items specified in Table 2. The requirements, experimental methods, etc. are used for verification.
7.3.3 If all type test items meet the requirements, the type test is deemed qualified; if any item fails to meet the requirements, double the sampling is allowed. Then, all items are re-inspected. If the re-inspection meets the requirements, the type test is still deemed qualified; if there are still items that do not meet the requirements, then the type test is deemed qualified. The type test failed. Samples for type testing should not be delivered to the ordering party as qualified products.
8 Marking, Packaging, Transport and Storage
8.1 Marking The following should be clearly labeled on the instrument.
a) Product name, model, and category;
b) Name and trademark (if any) and address of the manufacturing company;
c) Manufacturing date and warranty period;
d) Implementation standards.
8.2 Packaging Product packaging should be sturdy, with clear markings, and graphic symbols should conform to the provisions of GB/T 191.
8.3 Transportation During transportation, the product should be protected from squeezing, impact, rain, moisture, and chemical corrosion.
8.4 Storage This product should be stored in a well-ventilated warehouse and should not come into contact with salt, alkali, or acidic substances.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 24 pages — is available in the English PDF.
Editions of GB/T 8395
| Edition | Title | Revision | Status |
|---|---|---|---|
| GB/T 8395-2026 | Rings | current edition | Current |
| GB/T 8395-2007 | Rings | previous edition | In force until 1 May 2027 |
This page sells the current edition, GB/T 8395-2026. Earlier editions are listed for reference only.
How to Buy GB/T 8395-2026
- 1Add to cart. Click the "Buy GB/T 8395-2026" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 8395-2026
$260.00