GB/T 5623-2008Guide for the electricity consumption quota determination and regulation of product (English PDF)

产品电耗定额制定和管理导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 5623-2008 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 18, 2008

Implementation date

May 1, 2009

Scope

GB/T 5623-2008 is the English-translated version of 产品电耗定额制定和管理导则.

GB/T 5623-2008 is the Chinese standard "Guide for the electricity consumption quota determination and regulation of product".

Its scope clause reads: This standard specifies the basic requirements for the product power consumption quotas (hereinafter referred to as quotas) to develop, electricity consumption calculation, production calculation, quota and develop Quota management.

This standard applies to the use of energy in production, and a styling product or a fixed workload power units, but also for agriculture power row Irrigation, agricultural processing and other production of electricity.

Its clauses include terms and definitions; basic requirements; calculates the power consumption.

Found what you need?

Document preview — GB/T 5623-2008

National Standard of the People's Republic of China

ICS
27.010
Classification
F 01
Replacing
GB/T 5623-1985

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 Basic requirements
  • 5 calculates the power consumption

1 Scope

This standard specifies the basic requirements for the product power consumption quotas (hereinafter referred to as quotas) to develop, electricity consumption calculation, production calculation, quota and develop

Quota management.

This standard applies to the use of energy in production, and a styling product or a fixed workload power units, but also for agriculture power row

Irrigation, agricultural processing and other production of electricity.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent

Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research

Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.

GB/T 12723 energy consumption per unit of product preparation General

3 Terms and Definitions

The following terms and definitions apply to this standard.

3.1

Under the given conditions, the production unit or product unit completed the workload standard value of power consumption.

4 Basic requirements

Quota of 4.1 shall comply with the requirements of GB/T 12723 of.

4.2

units of electricity per unit of product produced in accordance with fixed assessment or complete unit workload electricity technology. Quota is to assess the efficiency of energy use

A comprehensive technical and economic indicators of the rate and level of power management.

4.3

integrated into the fixed quotas and quotas for individual categories.

4.3.1

Comprehensive Norm divided into full-scale integrated plant (whole plant scale) integrated fixed and workshop (workshop quotas).

4.3.2

Individual quotas into quotas and process technology quotas.

5 calculates the power consumption

5.1

Calculation of integrated fixed electricity production is to determine the direct and indirect production of electricity consumed within the scope of the sum. Calculation of individual quotas

Direct production of electricity is to determine the range of the amount of electricity. Individual quotas are comparable, including its scope should be based on electricity production

Process to determine the calculated range unified regulations by the competent authority.

5.2

direct production of electricity is a product (or semi-finished products) consumed in the production of physical and chemical processes in power, as well as in the production process,

The direct loss of power equipment, such as mechanical, thermal, electromagnetic, chemical and other losses caused by electricity.

5.3

Indirect electricity production is directly related to the production process of other electricity consumption, including.

a) repair, tools, preparation, transportation, testing and other auxiliary production sector electricity consumption;

b) water, gas, gas, heating, cooling and other electricity consumption;

c) the maintenance of production equipment, accident repair and maintenance after commissioning of electricity;

d) electricity production safety;

e) waste treatment and electricity consumption;

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

Editions of GB/T 5623

EditionTitleRevisionStatus
GB/T 5623-2008Guide for the electricity consumption quota determination and regulation of productcurrent editionCurrent
GB/T 5623-1985Guide for the electricity consumption quota determination and regulation of productprevious editionSuperseded

This page sells the current edition, GB/T 5623-2008. Earlier editions are listed for reference only.

How to Download GB/T 5623-2008

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 5623-2008

$85.00