GB/T 47292.2-2026Lithium-ion battery good manufacturing practice - Part 2: Battery material control (English PDF)
锂离子电池生产质量管理 第2部分:电池材料管控
This is a limited preview
Buy now to download the full PDF (34 pages)
Need quotation for your management?
Get a formal quotation for GB/T 47292.2-2026 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 31, 2026
Implementation date
April 1, 2027
Scope
GB/T 47292.2-2026 is the English-translated version of 锂离子电池生产质量管理 第2部分:电池材料管控.
GB/T 47292.2-2026 is Part 2 of the Chinese national standard on good manufacturing practice for lithium-ion batteries and deals with the control of battery materials.
It sets requirements for supplier management, incoming material receipt, incoming material inspection, incoming material storage and traceability.
Supplier management covers admission evaluation, quarterly performance monitoring, re-evaluation, classification and exit, and the development of a new material through project planning, design approval, special characteristic control and production process approval.
Receipt covers outer packaging and label checks, validity period, quantity and the supplier documents that travel with the goods, while two normative appendices list the inspection items for power and energy storage cell materials and for consumer cell materials.
It applies to manufacturers of power, energy storage and consumer lithium-ion cells and batteries. It was issued on 31 March 2026 and applies from 1 April 2027.
Found what you need?
Document preview — GB/T 47292.2-2026
National Standard of the People's Republic of China
- ICS
- 29.220.99
- Classification
- K 82
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- Introduction5
- 1 Scope6
- 2 Normative references6
- 3 Terms and definitions6
- 4 Abbreviated terms7
- 5 Supplier management8
- 5.1 Supplier resource pool management8
- 5.2 Supplier battery material development management9
- 6 Incoming material receipt10
- 6.1 Process specification10
- 6.2 Outer packaging inspection10
- 6.3 Validity period inspection11
- 6.4 Receipt quantity inspection11
- 6.5 Receipt documentation confirmation11
- 7 Incoming material inspection11
- 7.1 Inspection process11
- 7.2 Inspection requirements13
- 8 Incoming material storage14
- 8.1 Warehouse layout14
- 8.2 Storage environment14
- 8.3 Warehouse system15
- 8.4 Inventory management15
- 9 Traceability requirements15
- 9.1 General requirements15
- 9.2 Traceability capability16
- Appendix A (Normative) Inspection items for power and energy storage lithium ion cell materials17
- Appendix B (Normative) Inspection items for consumer lithium ion cell materials28
- Bibliography34
1 Scope
This document specifies the requirements for supplier management, incoming material receipt, incoming material inspection, incoming material storage, and traceability of battery materials involved in the production process of lithium ion cells and batteries.
This document applies to the battery material control of manufacturers of power, energy storage, and consumer lithium ion cells and batteries.
2 Normative references
The following referenced documents are indispensable for the application of this document. For dated references, only the version corresponding to that date is applicable to this document; for undated references, the latest version (including all amendments) is applicable to this document.
GB/T 47292.1-2026, Lithium ion battery good manufacturing practice - Part 1: General requirements
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
3.1 Lithium ion cell
A rechargeable device that achieves the conversion between chemical energy and electrical energy through the movement of lithium ions between the positive electrode and the negative electrode.
Note 1: It includes electrodes, separator, electrolyte, container and terminals, etc.
Note 2: Lithium ion cell is also generally referred to as "cell". [Source: GB/T 47292.1-2026, 3.1]
3.2 Lithium ion battery
An energy storage device consisting of one or more electrically connected cells or modules, capable of obtaining electrical energy from external sources and outputting electrical energy externally, and equipped with a battery management circuit.
Note 1: The battery management circuit usually has the functions of management or protection against overcharge, overcurrent, over discharge and/or overtemperature, so as to ensure the safety, performance and/or service life of the battery.
Note 2: The battery can be equipped with a protective enclosure and provided with terminals or other interconnection devices.
Note 3: The battery is also generally referred to as "battery pack" or "battery system". [Source: GB/T 47292.1-2026, 3.2]
3.3 Gravimetric capacity
Electrochemical capacity of a unit mass of active material under specified conditions for charging or discharging.
Note: The unit is milliampere-hours per gram (mAh/g). [Source: GB/T 20252-2014, 3.1, modified]
4 Abbreviated terms
For the purposes of this document, the following abbreviated terms apply.
APQP. Advanced Product Quality Planning
CPK. Complex Process Capability Index
IPD. Integrated Product Development
SDS. Safety Data Sheet
SPC. Statistical Process Control
5 Supplier management
5.1 Supplier resource pool management
5.1.1 Supplier selection
The requirements for the enterprise's supplier selection are as follows:
a) The enterprise shall define the required level of the supplier quality management system for each category of materials;
b) The enterprise shall establish a supplier admission evaluation mechanism. The evaluation shall at least cover financial status, technical capability, quality system capability, project management capability, traceability management, change management, etc.;
c) The enterprise shall establish admission evaluation criteria and conduct evaluations in accordance with the criteria. Only suppliers meeting the admission evaluation criteria may be admitted into the enterprise's system.
5.1.2 Supplier performance monitoring
The enterprise shall establish a supplier performance monitoring mechanism based on the following requirements.
a) The enterprise shall establish a periodic supplier performance evaluation mechanism, with the evaluation frequency being not less than once per quarter;
b) The performance evaluation dimensions shall include the supplier's product quality performance, delivery, cost, service capability, etc.;
c) The enterprise shall establish an improvement mechanism for suppliers failing the performance evaluation to ensure that suppliers have the capability to deliver qualified products.
5.1.3 Supplier re-evaluation mechanism
The enterprise shall establish a re-evaluation mechanism according to the importance of the battery materials supplied by the supplier.
a) For key suppliers, an audit covering all manufacturing processes shall be conducted annually;
b) For non-key suppliers, an audit covering all manufacturing processes shall be conducted at least once every three years;
c) On-site audits should be given priority as the re-evaluation method, or online audits may be conducted in combination with supplier performance.
5.1.4 Supplier classification and exit management
The enterprise's supplier classification and exit management shall satisfy the following requirements.
a) The enterprise shall classify suppliers based on quantitative indicators such as supplier performance evaluation results and re-evaluation results;
b) According to the classification results, the enterprise shall implement differentiated control strategies (development or exit) for suppliers at different levels.
5.2 Supplier battery material development management
5.2.1 Process specification
The enterprise shall establish a battery material development management process and establish a digital management system to monitor the battery material development process.
a) For power lithium ion cells, battery material development shall be planned and implemented in accordance with the APQP requirements;
b) For energy storage or consumer lithium ion cells, the IPD development process or an equivalent development process may be adopted for battery material development management.
5.2.2 Project plan management
The enterprise shall develop a battery material development plan in conjunction with the project plan, complete the battery material design freeze before project design freeze, and complete production part and production process approval for battery materials before project mass production and delivery.
5.2.3 Design approval
The enterprise shall require suppliers to conduct testing on battery materials. The test items shall cover material drawings, technical documentation, and applicable laws and regulations.
5.2.4 Special characteristic management
The enterprise shall require suppliers to control special characteristics as follows.
a) Suppliers shall give priority to controlling special characteristics by design or error-proofing of tooling;
b) Where control by design or error-proofing of tooling cannot be adopted as the preferred solution, SPC monitoring shall be implemented to ensure that the special characteristics remain stable within the tolerance range and to reduce the risk of variation.
Note: Process capability control of power lithium ion cell materials shall refer to the requirements of IATF 16949. The corresponding requirements for process capability control of other types of battery materials shall be determined by the enterprise.
5.2.5 Production process approval
Before mass production of battery materials, the enterprise shall approve and release the production process of the battery materials. The release conditions shall satisfy the following requirements.
a) The molds, tooling, fixtures, and production lines for mass production at the supplier's site shall pass acceptance, and the control plan, work instructions, inspection instructions, etc. shall be prepared;
b) The yield rate, average daily peak production capacity, and CPK index of the battery materials shall satisfy the enterprise's control requirements for battery materials.
6 Incoming material receipt
6.1 Process specification
The enterprise shall establish an incoming battery material acceptance process. The process shall at least specify the procedures for outer packaging inspection, quantity verification, validity period confirmation, and verification of supplier accompanying documents (such as factory inspection report and SDS).
6.2 Outer packaging inspection
6.2.1 The packaging of incoming battery materials shall satisfy the enterprise's packaging specification requirements to ensure that the battery materials are not easily affected by moisture, impact, or contamination during transportation and storage.
6.2.2 Material labels shall satisfy the following requirements.
a) The label information shall be accurate and complete, and shall at least include the supplier name or code, material name or code, batch number, production date, validity period, quantity, etc.;
b) The labels shall be affixed at consistent locations to facilitate incoming material inspection, retrieval, and management. The specific location may be determined according to the actual material packaging form;
c) The label information shall be clear, without missing information, and without damage.
6.3 Validity period inspection
The production date and validity period of the materials shall be confirmed.
6.4 Receipt quantity inspection
6.4.1 The enterprise shall establish a battery material receipt quantity inspection process, clearly defining the sampling inspection ratio for each type of material to prevent shortages in the quantity of incoming materials in a batch and avoid affecting the normal operation of the production line.
6.4.2 After the quantity inspection has been passed, the material information (including the production date, batch number, quantity, etc.) shall be entered into the system, and the information entered into the system shall be ensured to be consistent with the actual materials.
Note: For materials measured by weight, the receipt quantity shall be the net weight after deducting the weight of the packaging materials.
6.5 Receipt documentation confirmation
Incoming materials shall be accompanied by the supplier's certificate of inspection in accordance with the requirements of the drawings and the incoming inspection plan. Chemicals shall be accompanied by an SDS.
7 Incoming material inspection
7.1 Inspection process
7.1.1 In addition to supplier ex-factory inspection, the enterprise shall establish an incoming inspection process for battery materials, inspection items and methods for various types of battery materials, and disposition plans for nonconforming battery materials, to ensure that the incoming material quality meets the requirements of the production process and finished product quality.
7.1.2 The requirements for environment and personnel are as follows:
a) The temperature, humidity, cleanliness, illuminance, etc. of the inspection environment shall satisfy the most stringent environmental requirements of the measuring instruments involved, materials to be measured, and test items in the environment; […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.
Referenced standards
Normative references
How to Download GB/T 47292.2-2026
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47292.1-2026 — Lithium-ion battery good manufacturing practice - Part 1: General requirements
GB/T 47292.3-2026 — Lithium-ion battery good manufacturing practice - Part 3: Cell process control and finished product testing
GB/T 47292.4-2026 — Lithium-ion battery good manufacturing practice - Part 4: Battery pack process control and finished product testing
Secure payment via Stripe
Payments accepted
GB/T 47292.2-2026
$420.00