GB/T 47292.4-2026Lithium-ion battery good manufacturing practice - Part 4: Battery pack process control and finished product testing (English PDF)

锂离子电池生产质量管理 第4部分:电池组过程管控与成品测试

Open the GB/T 47292.4-2026 preview as PDF

Preview — first pages of GB/T 47292.4-2026 (full document: 23 pages)

This is a limited preview

Buy now to download the full PDF (23 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 31, 2026

Implementation date

April 1, 2027

Scope

GB/T 47292.4-2026 is the English-translated version of 锂离子电池生产质量管理 第4部分:电池组过程管控与成品测试.

GB/T 47292.4-2026 is the Chinese national standard covering assembling cells into a pack - the sorting and matching of cells, the welding of the interconnects and its inspection, the management system installation and the electrical, insulation and leak testing of the finished pack. Part 4 of the series, first edition, in force from 1 April 2027, completing the lithium battery GMP set. It was issued on 31 March 2026 and takes effect on 1 April 2027, as a first edition. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.

Document preview — GB/T 47292.4-2026

National Standard of the People's Republic of China

ICS
29.220.99
Classification
K 82

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 4 Introduction...6
  • 1 Scope...7
  • 2 Normative references...7
  • 3 Terms and definitions...7
  • 4 Abbreviated terms...9
  • 5 General requirements...9
  • 6 Qualification rate...10
  • 7 Overall equipment effectiveness...11
  • 8 Error-proofing and traceability...12
  • 8.1 General requirements...12
  • 8.2 Error-proofing...12
  • 8.3 Traceability...12
  • 9 Technical cleanliness...13
  • 10 Electrostatic discharge protection...13
  • 11 Cell pre-processing...14
  • 11.1 Printing...14
  • 11.2 Code spraying...15
  • 11.3 Performance test...15
  • 11.4 Tab forming and cutting...16
  • 11.5 Grouping...16
  • 12 Laser welding...17
  • 12.1 General requirements...17
  • 12.2 Process control...17
  • 12.3 Semi-finished product inspection...17
  • 13 Product attachment...18
  • 13.1 Process control...18
  • 13.2 Semi-finished product inspection...19
  • 14 Battery pack processing...19

1 Scope

GB/T 47292.4-2026 is the Chinese national standard covering assembling cells into a pack - the sorting and matching of cells, the welding of the interconnects and its inspection, the management system installation and the electrical, insulation and leak testing of the finished pack. Part 4 of the series, first edition, in force from 1 April 2027, completing the lithium battery GMP set. It was issued on 31 March 2026 and takes effect on 1 April 2027, as a first edition. This page is published from the official record of the 2026 edition; the clause text of a standard this recent is not yet in circulation, and the figures, limits and tables it contains are those of the document itself, delivered in full with the English translation.

This document specifies the general requirements, qualification rate, overall equipment effectiveness, error-proofing and traceability, technical cleanliness, electrostatic discharge protection, cell pre-processing, laser welding, product attachment, battery pack processing, cell grouping, module enclosure, structural connection, electrical connection, finished product testing and other requirements during the production process of lithium ion batteries. This document applies to the production process quality management of manufacturers of power, energy storage and consumer lithium ion batteries.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

GB/T 16895.1, Low-voltage electrical installations - Part

3 Terms and definitions

For the purposes of this document, the following terms and definitions apply.

3.1 lithium ion cell A rechargeable device that achieves the conversion between chemical energy and electrical energy through the movement of lithium ions between the positive electrode and the negative electrode. Note

1.It includes electrodes, separator, electrolyte, container and terminals, etc. Note

2.Lithium ion cell is also generally referred to as "cell".

3.2 Lithium ion battery An energy storage device consisting of one or more electrically connected cells or modules, capable of obtaining electrical energy from external sources and outputting electrical energy externally, and equipped with a battery management circuit. Note

1.The battery management circuit usually has the functions of management or protection against overcharge, overcurrent, over discharge and/or overtemperature, so as to ensure the safety, performance and/or service life of the battery. Note

2.The battery can be equipped with a protective enclosure and provided with terminals or other interconnection devices. Note

3.The battery is also generally referred to as "battery pack" or "battery system".

3.3 battery management system An electronic system associated with battery, which has current control functions under overcharge, overcurrent, overdischarge and overtemperature conditions, and can also monitor and/or manage the battery status, calculate secondary data, report such data and/or regulate the battery environment, so as to ensure the safety, performance and/or service life of the battery. Note

1.If otherwise agreed between the lithium ion cell manufacturer and the customer, the overdischarge cut-off function is not mandatory. Note

2.The functions of the battery management system can be either integrated into the lithium ion battery or distributed into the device using the battery. Note

3.The battery management system can be configured separately, with some functional modules located inside the lithium ion battery and the remaining parts deployed in the device using the battery. Note

4.The battery management system (BMS) is sometimes also referred to as the battery management unit (BMU). [Source: GB 38661-2020, 3.3, modified]

4 Abbreviated terms

For the purposes of this document, the following abbreviated terms apply. BMS. Battery Management System CMK. Machine Capability Index CPK. Capability Process Index DOE. Design of Experiments ESD. Electrostatic Discharge LWM. Laser Welding Monitor MSA. Measurement System Analysis OCT. Optical Coherence Tomography OCV. Open Circuit voltage WDD. Welding Defects Detection %P/T. Percentage of Tolerance %GRR. Percentage of Gage Repeatability and Reproducibility

5 General requirements

5.1 According to the qualification rate, overall equipment effectiveness, structural connection, electrical connection, finished product testing and other aspects of the lithium ion battery production process, the requirements are classified into specified value (Grade C), target value (Grade B) and advanced value (Grade A) based on the current industry level. Lithium ion battery manufacturers shall at least meet the requirements of Grade C.

5.2 Enterprises shall continuously control the production level of lithium ion batteries (including but not limited to the indicators specified in 5.1), and shall implement systematic error-proofing for key parameters and materials throughout the entire production process, so as to achieve traceability throughout the product life cycle.

5.3 Key inspection equipment shall be subject to MSA evaluation before being put into use.

5.4 The qualification rate, overall equipment effectiveness and process capability shall be statistically analyzed during the stable mass production period of products (daily production capacity >= 70% × the maximum designed daily production capacity, or after 60 d of production).

5.5 The applicable scope of key indicators for the production process of lithium ion batteries is shown in Table 1.

5.6 For other types of battery packs, the power/energy storage items or consumer items shall be selected according to the process. Table 1 - Applicable scope of key indicators for the production process of lithium ion batteries

6 Qualification rate

6.1 Enterprises shall monitor the qualification rate of each process. The qualification rate of key processes shall meet the requirements specified in Table 2.

a) The key processes of power battery products shall at least include. cell grouping, module enclosure, structural connection (bolt connection, adhesive bonding, laser welding), electrical connection (laser welding, electrical component connection), and airtightness testing and electrical performance testing in finished product testing;

b) The qualification rate should be collected in real time by an automated system, so as to reduce human errors. Table 2 - Qualification rate requirements for key processes

6.2 Defect types affecting product reliability and safety shall not be reworked. For example, cell damage (excluding appearance issues such as minor scratches or marks), cell weld penetration and other defects shall not be reworked.

Note. This chapter applies to power lithium ion cell enterprises. Energy storage and consumer lithium ion cell enterprises may refer to and implement this clause according to their actual conditions.

7 Overall equipment effectiveness

Overall equipment effectiveness = (equipment utilization rate × performance efficiency × total qualification rate) × 100%, which is a key indicator for measuring the comprehensive performance of equipment during the production process and is mainly used to evaluate the ratio of actual output of equipment to the theoretical maximum output. The calculation methods for equipment utilization rate and performance efficiency are as follows:

a) Equipment utilization rate = actual operating time / planned operating time. The statistics shall define the planned operating time and actual operating time, and the causes of downtime shall be accurately recorded;

b) Performance efficiency = actual output / theoretical maximum output. The theoretical maximum output shall be clearly specified in documents; the overall equipment effectiveness shall meet the requirements specified in Table 3. Table 3 - Requirements for overall equipment effectiveness Note

1.The total qualification rate is the ratio of the number of qualified products to the total input quantity. The total qualification rate = number of qualified products / total input quantity × 100%, or the product of the qualification rates of each individual process. The total input quantity is the theoretical output quantity when the qualification rate is 100%. Note

2.This Chapter applies to power lithium ion cell enterprises. Energy storage and consumer lithium ion cell enterprises may refer to and implement this Chapter according to their actual conditions.

8 Error-proofing and traceability

8.1 General requirements Enterprises shall establish an error-proofing and traceability system to identify all materials (including cells, semi-finished products and finished products) and their status. From the receipt of materials constituting the battery pack to the entire production and manufacturing process, the system shall prevent material confusion and misuse, and achieve traceability throughout the product life cycle through data storage. To ensure the reliability of error-proofing and traceability, material identification codes shall meet the following requirements.

a) The coding rules for identification codes of materials constituting the battery pack and semi-finished product materials shall be clearly defined according to enterprise requirements, and the identification code of each material shall be unique;

b) The coding rules for finished product identification codes shall meet the coding requirements of standards such as GB/T 34014 or GB/T 45565.

8.2 Error-proofing Key production processes affecting the safety and functions of lithium ion batteries shall have the functions of identifying and intercepting nonconforming items, so as to prevent nonconforming items from being accepted and released. The error-proofing system shall meet the following requirements.

a) Before production in each key process, the system shall automatically verify the material status by scanning the material identification code and intercept nonconforming materials, including cells and semi-finished product materials;

b) During production in each key process, the system shall detect and determine the key process control parameters and process inspection results of the process, and assign a nonconformity code to products that fail the determination and intercept such products.

8.3 Traceability The production process of lithium ion batteries shall have the function of traceability throughout the product life cycle. The traceability system shall meet the following requirements.

a) Traceability information shall at least include the production factory, production line, production time of key processes, operator information, equipment number, material information, specifications and actual values (including units) of process control parameters, process inspection results, etc.

b) Traceability of information at each material level, including cells, semi- finished products and finished products (at least including safety-critical materials).

c) The retention period of visual inspection defect image data of key processes shall be not less than 3 months. The retention period of digital data shall meet the following requirements. 1) The retention period of consumer lithium ion batteries shall be not less than 3 years; 2) The retention period of power and energy storage lithium ion batteries shall be not less than the product warranty period or the period required by customers.

9 Technical cleanliness

Power and energy storage lithium ion battery enterprises shall comprehensively identify and control the risk of foreign particle contamination through corresponding standard systems, from product design, process development, equipment development, mass production release, to the supply of lithium ion battery materials. The following requirements shall be met.

a) Reasonable specifications for foreign particles shall be established according to the requirements for product safety and quality;

b) Foreign particles in products and the environment shall be regularly monitored through dust fall adhesive paper or particle extraction instruments. Microscopes, energy dispersive X-ray spectroscopy and other methods should be used for analyzing their size and composition;

c) For processes that may generate foreign particles (such as welding), cleanliness control measures shall be provided and verification may be carried out by methods such as attenuation testing.

10 Electrostatic discharge protection

Note 1. 2. **Search (Optional).** Enter the keyword '**GB/T 47292.4-2026**' in the search bar, if it is not already shown. 3.

Note 2. 9.

Note 3. 10. **Verification (USD

Notes and Explanations

Note 1:**[GB/T 47292.4-2026](https://

Note 3:** If you are unable to redirect back to our Return Page, do not worry. **Additionally and independently**, our automated system will still deliver your PDF and Invoice via email **(the second mechanism to ensure the delivery)**, typically within 3 minutes. Once your payment is complete, you have two instant ways to access your PDF and invoice: you may stay on the Return Page for download in 3 minutes typically, or simply check your email inbox where a copy is automatically delivered in 3 minutes typically.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 23 pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 47292.4-2026

  1. 1Add to cart. Click the "Buy GB/T 47292.4-2026" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
23 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 47292.4-2026

$425.00

$360.00for partners