Valid

GB/T 46899.1-2025Electrical energy meters - Test equipment, techniques and procedures - Part 1: Stationary meter test units (MTUs) (English PDF)

电能表 试验设备、技术和程序 第1部分:固定式电能表试验装置(MTUs)

Preview PDF

This is a limited preview

Buy now to download the full PDF (58 pages)

Need quotation for your management?

Get a formal quotation for GB/T 46899.1-2025 in 30 minutes.

Issued by

State Administration for Market Regulation

Level / Type

National · Recommended

Issue date

December 31, 2025

Implementation date

July 1, 2026

Scope

GB/T 46899.1-2025 is the English-translated version of 电能表 试验设备、技术和程序 第1部分:固定式电能表试验装置(MTUs).

GB/T 46899.1-2025 — This document applies to fixed energy meter testing equipment permanently installed in a laboratory for the testing and calibration of energy meters.

(MTU), particularly for type testing, acceptance testing, and verification testing of equipment. This document covers automation for indoor laboratories.

MTU requirements, applicable to newly manufactured MTUs, for use with AC voltage not exceeding 600V (line to neutral) and frequency of Testing of electricity meters in 50Hz or 60Hz electrical networks.

If the electricity meter is used for a system voltage not specified in this document, the special requirements for the MTU shall be negotiated between the manufacturer and the purchaser.

This document also defines the types of tests for the MTU, including type tests, routine tests, acceptance tests, and commissioning tests.

This document does not apply to. ---Portable reference energy meters and portable power sources; ---Electricity meter; ---Data interface of the electricity meter and test procedures for the data interface; ---Instrument connected to the MTU; ---Personal computers provided with MTU.

Found what you need?

Document preview — GB/T 46899.1-2025

National Standard of the People's Republic of China

ICS
17.220.20
Classification
N 22

Issued by: State Administration for Market Regulation

Contents

  • Preface
  • Introduction
  • 1 Scope
  • 2 Normative References
  • 3 Terms and Definitions
  • 3.1 Definitions related to the MTU element
  • 3.2 Definitions of active power, reactive power, and apparent power
  • 3.3 Definitions related to the magnitude of influence
  • 3.4 Definitions related to accuracy
  • 3.5 Definitions related to testing
  • 4 Testing apparatus for electricity meters and testing apparatus for automated electricity meters 9.
  • 5 Test methods for the accuracy of electricity meters 9.
  • 5.1 General Rules
  • 5.2 Electrical Energy Comparison Method
  • 5.3 Power-Time Measurement Method (Watt-Second Method Based on Register Readings)
  • 5.4 Pulse Comparison Method
  • 6 Nominal capacity value
  • 6.1 Grid power supply
  • 6.2 Output values and output range of the test circuit
  • 6.3 Standard Table
  • Magnetic field of 6.4 MTU
  • 6.5 Scanning head electrical and mechanical values
  • 6.6 Error Calculation System
  • 7 MTU structural requirements
  • 7.1 General Requirements
  • 7.2 Sources and Standards Table
  • 7.3 Instrument Installation System
  • 8 Information and Labeling Requirements
  • 8.1 General Requirements
  • 8.2 Labels, Symbols and Signs
  • 8.3 Information used for selection
  • 8.4 Information for Installation and Commissioning
  • 8.5 Usage Information
  • 8.6 Maintenance Information
  • 9 Climate conditions
  • 9.1 Normal Environmental Conditions
  • 9.2 Extreme Environmental Conditions
  • 9.3 Temperature limits and heat resistance
  • Electrical requirements for 10 MTU
  • 10.1 Impact of Grid Power Supply
  • 10.2 Insulation
  • 11 Electromagnetic compatibility
  • 11.1 General Requirements and Performance Criteria
  • 11.2 General Test Conditions
  • 12 Standard Table
  • 12.1 General Requirements
  • 12.2 Accuracy Requirements under Reference Conditions
  • 12.3 Error Limits Caused by Influencing Quantities
  • 12.4 Accuracy Test with Harmonics Present
  • 13 Software Requirements
  • 13.1 Application
  • 13.2 Identity Authentication
  • 13.3 Protection
  • 13.4 Functional Requirements
  • 13.5 Controlling and monitoring MTU via software
  • 13.6 Creation, Protection, and Storage of Test Procedures
  • 13.7 Protection and Storage of Test Results and Test Protocols
  • 13.8 Software Documentation
  • 13.9 Software Log
  • 14 Accuracy Requirements and Tests
  • 14.1 General Requirements
  • 14.2 Test methods for determining MTU accuracy
  • 14.3 Test Point - Selection of Voltage and Current Ranges
  • 14.4 Accuracy requirement
  • 14.5 Check the MTU measurement results
  • 14.6 Tests and Test Procedures
  • Appendix A (Informative) Symbols shall conform to GB/T 5465.2-2023.38
  • Appendix B (Normative) Reference Conditions
  • Appendix C (Informative) Test Circuits and Test Signals for Harmonic Testing
  • C.1 Overview
  • C.2 Phase-triggered control (odd harmonics)
  • C.3 Pulse Train Trigger Control (Interharmonics)
  • Appendix D (Informative) Calculation of Errors and Related Expanded Measurement Uncertainties
  • D.1 Overview
  • D.2 Degrees of freedom and sensitivity coefficients
  • D.3 Methods for determining standard measurement uncertainty

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents".

Drafting.

This document is Part 1 of GB/T 46899 "Test Equipment, Techniques and Procedures for Electricity Meters". GB/T 46899 has been published as...

Part 2.

---Part 1: Test apparatus for stationary energy meters (MTUs).

This document is equivalent to IEC 62057-1:2023 "Test equipment, techniques and procedures for electricity meters - Part 1: Test equipment for stationary electricity meters".

MTUs (Measuring Units) are used for testing.

The following minimal editorial changes have been made to this document.

---Note a has been added to Table 1;

---Corrected the table numbering in Table A.1 and corrected the redundant entries for "Xi" in Table D.9;

---The format of Table 16 has been adjusted;

---Corrected "10000/kW·h" in D.4.4 to "10000×1/(kW·h)";

---Corrected the unit of instrument constant in D.4.3 from "imp/kW·h" to "1/(kW·h)";

---Corrected the working voltage range "(-10%~15%)" in Table F.1 to "(-10%~15%)Un", and the frequency working range.

"fn±2%" is "(1±2%)fn";

---Corrected the frequency "50Hz±1%/60Hz±1%" in Table E.1 to "(1±1%)50Hz/(1±1%)60Hz", Table F.2 the voltage range "230V±10%" is "(1±10%)230V".

Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.

This document was proposed by the China Machinery Industry Federation.

This document is under the jurisdiction of the National Technical Committee on Standardization of Electrical Instruments and Meters (SAC/TC104).

Introduction

GB/T 46899 aims to specify the relevant technical requirements for test equipment, test techniques, and test procedures for electricity meters. GB/T 46899 is proposed...

It consists of the following two parts.

---Part 1: Test Apparatus for Fixed Energy Meters (MTUs). The purpose is to specify the testing apparatus for energy meters permanently installed in a laboratory.

Type testing, acceptance testing, and verification testing of stationary energy meter test units (MTUs) for testing and calibration.

---Part 2: Portable Instrument Test Unit (PMTU). The purpose is to specify newly manufactured portable test units for field use.

Technical requirements for instrument testing equipment (PMTU).

Electricity meter testing equipment, technology and procedures Part 1: Test Apparatus for Fixed Energy Meters (MTUs)

1 Scope

This document applies to fixed energy meter testing equipment permanently installed in a laboratory for the testing and calibration of energy meters.

(MTU), particularly for type testing, acceptance testing, and verification testing of equipment. This document covers automation for indoor laboratories.

MTU requirements, applicable to newly manufactured MTUs, for use with AC voltage not exceeding 600V (line to neutral) and frequency of Testing of electricity meters in 50Hz or 60Hz electrical networks.

If the electricity meter is used for a system voltage not specified in this document, the special requirements for the MTU shall be negotiated between the manufacturer and the purchaser.

This document also defines the types of tests for the MTU, including type tests, routine tests, acceptance tests, and commissioning tests.

This document does not apply to.

---Portable reference energy meters and portable power sources;

---Electricity meter;

---Data interface of the electricity meter and test procedures for the data interface;

---Instrument connected to the MTU;

---Personal computers provided with MTU.

2 Normative references

The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.

For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.

This document.

GB/T 2893.1-2013 Graphical symbols, safety colors, and safety signs—Part 1: Design principles of safety signs and markings Then (ISO 3864-1:2011, MOD) GB/T 4798.2-2021 Classification of Environmental Conditions - Classification of Environmental Parameter Groups and Grading of Severity - Part 2: Transport and Loading Unloading (IEC 60721-3-2:2018, IDT) GB 4824-2019 Limits and methods of measurement for radio frequency interference characteristics of industrial, scientific and medical devices (CISPR 11.2015) IDT) GB/T 5465.2-2023 Graphical symbols for electrical equipment – Part 2: Graphical symbols (IEC 60417 Database.

2023-03, IDT)

GB/T 16273 (all parts) Graphical symbols for equipment [ISO 7000 (all parts)] GB/T 16935.1-2023 Insulation Coordination of Equipment in Low-Voltage Power Supply Systems - Part 1: Principles, Requirements and Tests (IEC 60664-1:2020, IDT) GB/T 17045-2020 General Part of Protective Devices and Equipment for Electric Shock (IEC 61140:2016, IDT) GB/T 17215.231-2021, Electrical measuring equipment (AC) - General requirements, tests and test conditions - Part 31: Product safety requirements Summation test (IEC 62052-31:2015, IDT) GB/T 18268.1-2025 Electromagnetic compatibility requirements for electrical equipment for measuring, control and laboratory use – Part 1: General requirements (IEC 61326-1:2020, IDT) GB/T 42125.1-2024 Safety requirements for electrical equipment for measuring, control and laboratory use – Part 1: General requirements (IEC 61010-1:2016, IDT)

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 58 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 46899.1-2025

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
58 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 46899.1-2025

$920.00