GB/T 46150.1-2025Boilers and pressure vessels - Part 1: Performance requirements (English PDF)
锅炉和压力容器 第1部分:性能要求
This is a limited preview
Buy now to download the full PDF (37 pages)
Need quotation for your management?
Get a formal quotation for GB/T 46150.1-2025 in 30 minutes.
Issued by
State Administration for Market Regulation
Level / Type
National · Recommended
Issue date
August 29, 2025
Implementation date
August 29, 2025
Scope
GB/T 46150.1-2025 is the English-translated version of 锅炉和压力容器 第1部分:性能要求.
GB/T 46150.1-2025 is the Chinese standard "Boilers and pressure vessels - Part 1: Performance requirements". Its scope clause reads: This document specifies performance requirements for the construction of boilers and pressure vessels.
This document is applicable to construction requirements for boilers and pressure vessels; it does not cover requirements for operation, maintenance, or the inspection of equipment in service.
The scope of pressure vessels is defined as follows. a) The pressure vessel body, comprising the bevel face of the first circumferential joint connecting the pressure vessel to external piping or devices via welding (or bonding), the end face of the first threaded joint in a threaded connection, the first flange sealing face in a flange connection, and the first sealing face in a special connector or pipe fitting connection; the pressure-bearing covers and fasteners for pressure vessel openings; and the welds connecting non-pressure-bearing components to pressure- bearing components; b) Safety accessories and instruments directly connected to the pressure vessel; c) Non-pressure-bearing components directly connected to the pressure vessel, such as supports, skirts, etc. The scope of boilers is defined as follows. a) The boiler body, comprising the boiler drum (shell), start-up (steam-water) separator and water storage tank, heating surfaces, headers and their connecting piping, furnace, combustion equipment, air preheater, furnace walls, flue gas (air) ducts, and structural framework (including platforms and escalators). b) Piping within the boiler boundary, including.
1) For power station boilers. main feedwater piping, main steam piping, reheat steam piping, etc., as well as branch piping up to the first valve (excluding the valve itself; the same applies hereinafter); 2) For boilers other than power station boilers. where a steam (water/oil) distribution header (hereinafter collectively referred to as the “steam distribution header”) is installed, this includes pressure-bearing piping extending from the feedwater (oil) pump outlet to the first circumferential weld connecting the steam distribution header outlet to external piping; where no steam distribution header is installed, this includes pressure-bearing piping extending from the feedwater (oil) pump outlet to the main steam (water/oil) outlet valve.
NOTE.
Main feedwater piping refers to the piping extending from the feedwater pump outlet check valve to the economizer inlet header; main steam piping refers to the piping extending from the final-stage superheater outlet header to the turbine high-pressure main steam valve (or to the first valve upstream of the header for boilers operating in a header system); cold reheat steam piping refers to the piping extending from the turbine exhaust check valve to the reheater inlet header; hot reheat steam piping refers to the piping extending from the final-stage reheater outlet header to the turbine intermediate-pressure main steam valve. c) Safety accessories and instruments. d) Auxiliary equipment and systems.
This document does not apply to nuclear components, railway and marine boilers, marine pressure vessels, gas cylinders, hyperbaric oxygen chambers, piping systems, or mechanical equipment such as turbines and machinery casings.
Its clauses include terms and definitions; units of measurement; classification of boilers and pressure vessels; obligations and responsibilities. It was issued by the State Administration for Market Regulation on 2025-08-29 and took effect on 2025-08-29.
Found what you need?
Document preview — GB/T 46150.1-2025
National Standard of the People's Republic of China
- ICS
- 23.020.30; 27.060.30
Issued by: State Administration for Market Regulation
Contents
- Foreword...3
- Introduction...5
- 1 Scope...6
- 2 Normative References...7
- 3 Terms and Definitions...7
- 4 Units of Measurement...9
- 5 Classification of Boilers and Pressure Vessels...9
- 6 Obligations and Responsibilities...9
- 7 Failure Modes...12
- 8 Technical Requirements...14
- 9 Conformity Assessment...25
- Appendix A (Informative) Common Failure Modes and Limit States...26
- Appendix B (Informative) Selection of Standards...32
- References...37
1 Scope
This document specifies performance requirements for the construction of boilers and pressure vessels.
This document is applicable to construction requirements for boilers and pressure vessels; it does not cover requirements for operation, maintenance, or the inspection of equipment in service.
The scope of pressure vessels is defined as follows.
a) The pressure vessel body, comprising the bevel face of the first circumferential joint connecting the pressure vessel to external piping or devices via welding (or bonding), the end face of the first threaded joint in a threaded connection, the first flange sealing face in a flange connection, and the first sealing face in a special connector or pipe fitting connection; the pressure-bearing covers and fasteners for pressure vessel openings; and the welds connecting non-pressure-bearing components to pressure- bearing components;
b) Safety accessories and instruments directly connected to the pressure vessel;
c) Non-pressure-bearing components directly connected to the pressure vessel, such as supports, skirts, etc.
The scope of boilers is defined as follows.
a) The boiler body, comprising the boiler drum (shell), start-up (steam-water) separator and water storage tank, heating surfaces, headers and their connecting piping, furnace, combustion equipment, air preheater, furnace walls, flue gas (air) ducts, and structural framework (including platforms and escalators).
b) Piping within the boiler boundary, including.
1) For power station boilers. main feedwater piping, main steam piping, reheat steam piping, etc., as well as branch piping up to the first valve (excluding the valve itself; the same applies hereinafter);
2) For boilers other than power station boilers. where a steam (water/oil) distribution header (hereinafter collectively referred to as the “steam distribution header”) is installed, this includes pressure-bearing piping extending from the feedwater (oil) pump outlet to the first circumferential weld connecting the steam distribution header outlet to external piping; where no steam distribution header is installed, this includes pressure-bearing piping extending from the feedwater (oil) pump outlet to the main steam (water/oil) outlet valve.
NOTE. Main feedwater piping refers to the piping extending from the feedwater pump outlet check valve to the economizer inlet header; main steam piping refers to the piping extending from the final-stage superheater outlet header to the turbine high-pressure main steam valve (or to the first valve upstream of the header for boilers operating in a header system); cold reheat steam piping refers to the piping extending from the turbine exhaust check valve to the reheater inlet header; hot reheat steam piping refers to the piping extending from the final-stage reheater outlet header to the turbine intermediate-pressure main steam valve.
c) Safety accessories and instruments.
d) Auxiliary equipment and systems.
This document does not apply to nuclear components, railway and marine boilers, marine pressure vessels, gas cylinders, hyperbaric oxygen chambers, piping systems, or mechanical equipment such as turbines and machinery casings.
2 Normative References
The contents of the following documents constitute indispensable clauses of this document through normative references in the text. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document.
GB/T 2900.48 Electrotechnical terminology of boilers
GB/T 26929 Terminology for pressure vessels
3 Terms and Definitions
The terms and definitions defined in GB/T 26929 and GB/T 2900.48, as well as the following terms and definitions, are applicable to this document.
3.1 Certification
Third-party attestation related to the object of conformity assessment; accreditation is excluded.
[Source. ISO/IEC 17000.2020, 7.6]
3.2 Conformity
In compliance with specified requirements.
3.3 Contracting Party
The individual or organization that purchases the boiler or pressure vessel for the user.
3.4 Designer
An organization that designs boilers or pressure vessels in accordance with standards.
3.5 Examination
The activity in which qualified personnel assess—in accordance with standard procedures— whether a given product, process, or service complies with specified acceptance criteria.
3.6 Inspection
The activity of verifying whether the results of required examinations, checks, and testing comply with specified requirements.
3.7 Manufacturer
An independent legal entity that manufactures (including installation) boilers or pressure vessels in accordance with the following requirements.
--- Users Design Specification (UDS) provided by the contracting party or user;
--- Requirements of applicable construction standards for boilers and pressure vessels.
3.8 Qualification
The demonstration of the suitability of a specific person, method, procedure, or service in meeting specified requirements.
3.9 Regulation
Rules issued by government agencies in accordance with the law.
NOTE. Such as safety technical specifications.
3.10 Safety Accessory
A device used to protect a boiler or pressure vessel by preventing operating parameters from exceeding permissible limits.
NOTE. These devices may be used directly on boilers and pressure vessels, including. safety valves, bursting disc safety/buckling pins, and controlled safety pressure relief systems; limiting devices that can activate corrective measures or provide shutdown or lockout functions (e.g., pressure switches, temperature switches, or liquid level switches); and safety-related measuring, control, and regulating devices.
3.11 Standard/Code
A document established by a standardization body—through a process of drafting and approval—that prescribes common and repeated rules, guidelines, or characteristics for activities or their results.
3.12 Testing
The activity of verifying, through a specific procedure, whether one or more characteristics of a product, process, or service meet specified requirements.
3.13 Third-Party Inspection Body/Supervision Inspection Agency
An organization that conducts inspections of boilers or pressure vessels in accordance with regulations and standards, and which operates independently of the manufacturer, contracting party, or user.
3.14 User
The organization or individual that uses or operates a boiler or pressure vessel.
4 Units of Measurement
Units of measurement shall be in accordance with the International System of Units (SI). The use of other systems of measurement is permitted only when SI units are not available.
5 Classification of Boilers and Pressure Vessels
Given the wide range of applications for boilers and pressure vessels, this document does not provide detailed, application-specific technical methods or classifications; instead, it outlines fundamental failure modes and technical requirements to assist users of this document in determining appropriate approaches.
6 Obligations and Responsibilities
6.1 General Requirements
The obligations and responsibilities of the user, contracting party, designer, manufacturer, and supervision inspection agency (third-party inspection body) shall be clearly defined; general responsibilities for each party are outlined in 6.2 to 6.4.
6.2 User and Contracting Party
The user and the contracting party shall fulfill the following responsibilities.
a) The contracting party or user shall provide the Users Design Specification (UDS) for the boiler or pressure vessel to the designer in writing. The contracting party or user shall consider all factors related to usage when preparing the UDS. The UDS shall include, at a minimum, the following key information.
1) Standards and codes serving as the basis for construction;
2) The installation site and its natural conditions (including seismic design intensity, wind and snow loads, ambient temperature, etc.) for the boiler or pressure vessel;
3) The structure, key geometric parameters, and nozzle specifications of the boiler or pressure vessel;
4) Design parameters (design pressure, design temperature, etc.), operating parameters (operating pressure, operating temperature, cyclic loading conditions, liquid level height, nozzle loads, etc.), and environmental requirements;
5) Composition and characteristics of the medium;
6) Intended service life;
7) Overpressure risks and reasons during the operation of the boiler or pressure vessel, and the overpressure relief devices to be considered;
8) Other necessary conditions required for the design.
b) Before the initial operation of a boiler or pressure vessel, the user shall verify that the overpressure relief device (if applicable) has been correctly installed in the designated position.
6.3 Designer
The designer shall fulfill the following responsibilities.
a) Be responsible for the accuracy and completeness of the design documents;
b) Provide design documents to the contracting party;
c) Issue a risk assessment report to the user where necessary;
d) Retain all design documents for the duration of the boiler or pressure vessel’s design service life.
6.4 Manufacturer
The manufacturer shall fulfill the following responsibilities.
a) The manufacturer shall carry out manufacturing in accordance with the requirements of the design documents; if modifications to the design are necessary, the manufacturer shall obtain written consent to the modification from the original
......
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 37 pages — is available in the English PDF.
Referenced standards
How to Download GB/T 46150.1-2025
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 26929-2011 — Terminology for pressure vessels
GB/T 2900.48-2008 — Electrotechnical terminology of boilers
GB/T 46150.2-2025 — Boilers and pressure vessels - Part 2: Procedures for fulfilling the requirements of GB/T 46150.1
Secure payment via Stripe
Payments accepted
GB/T 46150.1-2025
$420.00