GB/T 45119-2024Technical requirements for insulation monitoring of low voltage power supply systems in power plants and substations (English PDF)
电力厂站低压用电系统的绝缘监测技术要求
Open the GB/T 45119-2024 preview as PDF
This is a limited preview
Buy now to download the full PDF (27 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 31, 2024
Implementation date
July 1, 2025
Scope
GB/T 45119-2024 is the English-translated version of 电力厂站低压用电系统的绝缘监测技术要求.
GB/T 45119-2024 sets the technical requirements for insulation monitoring in the low voltage systems of power plants and substations. Those systems are unearthed on purpose: an IT system keeps running through a first earth fault instead of tripping, which is exactly what is wanted for the auxiliaries and the DC supplies a station depends on. The price of that choice is that the first fault is invisible unless something watches for it, and a second fault on another phase is a short circuit. This document specifies what that watching device has to do: the requirements on the insulation monitoring device and on the fault location system, the measurement principle and the accuracy, the response time, the alarm thresholds and the behaviour on alarm, the requirements on the coupling to the system and the effect of system capacitance, the immunity and environmental requirements, the interfaces to the station monitoring system, and the test methods. For a station designer, an operator or a supplier of insulation monitoring equipment in China, this is the specification.
Document preview — GB/T 45119-2024
National Standard of the People's Republic of China
- ICS
- 29.080
- Classification
- K 80
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and Definitions1
- 4 Basic Requirements2
- 4.1 Working Environment2
- 4.2 Electrical performance3
- 4.3 Communications and others4
- 5 Monitoring requirements4
- 5.1 Classification4
- 5.2 Functional indicators4
- 5.3 Main methods7
- 6 Installation Acceptance8
- 6.1 Inspection8
- 6.2 Layout10
- 6.3 Acceptance10
- 7 Operation and Maintenance12
- 7.1 Run12
- 19 Reference23
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part
1.Structure and drafting rules for standardization documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Power System Plant Low Voltage Electricity Standardization Working Group (SAC/SWG21). This document was drafted by: State Grid Sichuan Electric Power Company Electric Power Research Institute, Guangdong Qianshun Technology Co., Ltd., Zhejiang Kechang Electronics Co., Ltd. Co., Ltd., State Grid Jibei Electric Power Co., Ltd. Electric Power Research Institute, Shenzhen Aotexun Electric Power Equipment Co., Ltd., State Grid Sichuan Province Power Company, State Grid Chongqing Power Company, Shourui (Tianjin) Electrical Equipment Co., Ltd., Zhiyang Innovation Technology Co., Ltd., State Grid Sichuan Integrated Energy Services Co., Ltd., Hebei Chuangke Electronic Technology Co., Ltd., China Datang Corporation Science and Technology Research Institute Co., Ltd., East China Electric Power Testing Institute, State Grid Hebei Electric Power Co., Ltd. Electric Power Science Research Institute, Dalian Lushun Power Electronic Equipment Co., Ltd., State Grid Tian Tianjin Electric Power Company, State Power Investment Corporation Science and Technology Research Institute Co., Ltd., China Southern Power Grid Research Institute Co., Ltd., Shenzhen Power Supply State Grid Corporation of China, State Grid Jibei Electric Power Co., Ltd., State Grid Liaoning Electric Power Co., Ltd. Electric Power Research Institute, Shenzhen Taiang Energy Technology Co., Ltd., Guangzhou Youwei Electronic Technology Co., Ltd., and Xuji Power Supply Co., Ltd. The main drafters of this document are. Luo Yang, Li Jing, Dong Hanbin, Fang Yuan, Xu Yufeng, Wang Fengren, Tian Jinhu, Zhang Chao, Fan Songhai, Li Shuqi, Yang Jing, Chen Shuxin, Chen Ying, Wu Chi, Ma Xiaomin, Ma Xinsheng, Nan Yin, Wang Jiayi, Nie Shugang, Li Yongxiang, Ma Yanqiang, Zhou Guangyuan, Wang Xuenan, Zhao Miao, Li Bingyu, Miao Shuguo, Zhao Jun, Liu Qin, Luo Wenke, Li Lijun, Wu Feifei, Xu Guangda, Yang Zhongliang, Wang Hong, Wang Yingming, Zhang Wanzheng, Liu Zhongxiang, Zhao Yinglong, Bao Chunfei, Luo Zhijun, Zheng Guoyong. Insulation monitoring of low voltage power systems in power plants Technical requirements
1 Scope
GB/T 45119-2024 sets the technical requirements for insulation monitoring in the low voltage systems of power plants and substations. Those systems are unearthed on purpose: an IT system keeps running through a first earth fault instead of tripping, which is exactly what is wanted for the auxiliaries and the DC supplies a station depends on. The price of that choice is that the first fault is invisible unless something watches for it, and a second fault on another phase is a short circuit. This document specifies what that watching device has to do: the requirements on the insulation monitoring device and on the fault location system, the measurement principle and the accuracy, the response time, the alarm thresholds and the behaviour on alarm, the requirements on the coupling to the system and the effect of system capacitance, the immunity and environmental requirements, the interfaces to the station monitoring system, and the test methods. For a station designer, an operator or a supplier of insulation monitoring equipment in China, this is the specification.
This document specifies the basic requirements, monitoring requirements, installation acceptance and operation and maintenance of low-voltage power systems in power plants and stations. Require. This document is applicable to the design, selection and installation of insulation monitoring of low voltage AC and DC power systems in power projects such as power plants, substations and converter stations. and use.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document.
GB/T 2423.1-2008 Environmental testing for electric and electronic products Part
3 Terms and definitions
The terms and definitions defined in GB/T 2900.1, GB/T 2900.33, GB/T 4365 and the following apply to this document.
3.1 Insulation monitoring insulationmonitoring Monitor and measure the insulation condition of busbars and branches to ground in low voltage AC and DC power supply systems.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 2423.1-2008 · GB/T 2423.2-2008 · GB/T 2423.5-2019 · GB/T 2423.10-2019 · GB/T 2900.33 · GB/T 4365 · GB/T 17626.2 · GB/T 17626.3
How to Buy GB/T 45119-2024
- 1Add to cart. Click the "Buy GB/T 45119-2024" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 17626.39-2023 — Electromagnetic compatibility - Testing and measurement techniques - Part 39: Radiated fields in close proximity - Immunity test
GB/T 2900.1-2008 — Electrotechnical terminology - Fundamental terms
GB/T 2900.12-2008 — Electrotechnical terminology - surge arresters,low-voltage surge protective devices and components
Secure payment via Stripe
Payments accepted
GB/T 45119-2024