GB/T 44659.2-2024Short-circuit current calculation for renewable energy power stations and connection systems - Part 2: Photovoltaic power generation (English PDF)
新能源场站及接入系统短路电流计算 第2部分:光伏发电
This is a limited preview
Buy now to download the full PDF (27 pages)
Need quotation for your management?
Get a formal quotation for GB/T 44659.2-2024 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
October 26, 2024
Implementation date
May 1, 2025
Scope
GB/T 44659.2-2024 is the English-translated version of 新能源场站及接入系统短路电流计算 第2部分:光伏发电.
GB/T 44659.2-2024, Part 2 of the GB/T 44659 series, specifies the models and methods for calculating the short-circuit currents of photovoltaic power stations and their connection systems.
It applies to photovoltaic power stations with current-source characteristics connected at power frequency to AC grids of 10 (6) kV and above.
The calculation must include both AC and DC components and both balanced and unbalanced faults; the station may be represented by a simplified equivalent model, except for faults inside it, where every PV unit, static var generator and other renewable device is modelled individually, and the grid contribution is calculated by the equivalent voltage source method of GB/T 15544.1.
The document gives the model of the photovoltaic generation unit as a controlled current source, the station equivalent model, the treatment of systems with several PV stations, calculation methods for balanced and unbalanced faults, an informative iterative solution procedure and worked examples.
It is a first edition, issued on 26 October 2024 by SAMR and SAC and in force since 1 May 2025. Classification: ICS 29.240.20, CCS F 20. The document runs to 27 pages, delivered complete in English translation.
Found what you need?
Document preview — GB/T 44659.2-2024
National Standard of the People's Republic of China
- ICS
- 29.240.20
- Classification
- F 20
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and symbols
- 4 Overall requirements
- 5 Calculation model
- 6 Calculation method
- Annex A (informative) Iterative solution procedure of the controlled current source model
- Annex B (informative) Calculation example
3 Terms, definitions and symbols
4 Overall requirements
5 Calculation model
6 Calculation method
Foreword
This document was issued on 26 October 2024 by the State Administration for Market Regulation and the Standardization Administration of China, and took effect on 1 May 2025.
This document is drafted in accordance with the rules given in GB/T 1.1-2020, Directives for standardization - Part 1: Rules for the structure and drafting of standardizing documents.
This document is Part 2 of GB/T 44659, Short-circuit current calculation of renewable energy power generation stations and connection systems. The following parts of GB/T 44659 have been published:
- Part 1: Wind power generation;
- Part 2: Photovoltaic power generation;
- Part 3: Energy storage stations.
Attention is drawn to the possibility that some elements of this document may be the subject of patent rights. The issuing body of this document shall not be held responsible for identifying any or all such patent rights.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Technical Committee for Standardization of Short-circuit Current Calculation (SAC/TC 424).
Drafting organisations of this document: China Electric Power Research Institute Co., Ltd., State Grid Corporation of China, North China Electric Power University, Guangdong Power Grid Co., Ltd., State Grid Fujian Electric Power Co., Ltd., State Grid Xinjiang Electric Power Co., Ltd., Economic and Technological Research Institute of State Grid Hebei Electric Power Co., Ltd., East China Branch of State Grid Corporation of China, Electric Power Research Institute of State Grid Jibei Electric Power Co., Ltd., China Southern Power Grid Digital Grid Research Institute Co., Ltd., Guangdong National New-type Energy Storage Research Institute Co., Ltd.
Main drafters of this document: Yi Jun, Lin Weifang, Wei Chunxia, Zhang Yantao, Li Yalou, Jia Ke, Bi Tianshu, Zhang Yuhong, Zhou Peipeng, Huo Qidi, Wang Hongfu, Wang Meng, Xie Pingping, Li Jianhua, Han Zhongkuan, Guo Tao, Zeng Zhensong, Yang Yinguo, Zhou Zhuan, Li Xiujun, Shi Wei, Que Dingfei, Zhang Bin, Xu Wenjia, Li Changyu, Ma Xiyuan, Yi Yang, Chen Deyang, He Chunguang, Guo Wei, Wang Chao, Duan Xiangying, Jiang Bingwei, Li Ying, Liu He, An Jiakun, Xie Xiaodi, Mou Jianan, Pan Bingru, Xue Hengyu, Fan Yiwen, Wang Shen, Sun Haoran, Han Ninghui, Ren Xuan, Cui Yanyan, Ren Xiaoyu, Lyu Chen, Liu Qian.
Classification: ICS 29.240.20, CCS F 20.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 27 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 15544.1Short-circuit current calculation in three-phase a. c. systems - Part 1: Calculation of currents
- GB/T 19964Technical requirements for connecting photovoltaic power station to power system
- GB/T 32826Guide for modelling photovoltaic power systems
- GB 38755Code on security and stability for power system
- GB/T 44659.1Short-circuit current calculation for renewable energy power stations and connection systems - Part 1
- GB/T 44659.3Short-circuit current calculation for renewable energy power stations and connection systems - Part 3
How to Download GB/T 44659.2-2024
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 38755-2019 — Code on security and stability for power system
GB/T 15544.1-2023 — Short-circuit current calculation in three-phase a. c. systems - Part 1: Calculation of currents
GB/T 19964-2024 — Technical requirements for connecting photovoltaic power station to power system
Secure payment via Stripe
Payments accepted
GB/T 44659.2-2024
$375.00