Scope

GB/T 44241-2024 is the English-translated version of 虚拟电厂管理规范.

GB/T 44241-2024 is the Chinese national standard covering virtual power plant management specification. Issued on 24 July 2024, it has been in force since 1 February 2025.

Document preview — GB/T 44241-2024

National Standard of the People's Republic of China

ICS
29.020
Classification
F 20

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceIII
  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and Definitions1
  • 4 General Requirements2
  • 5 Planning, Design and Management2
  • 6 Construction Implementation Management2
  • 7 Access Detection Management3
  • 8 Registration and grid management4
  • 9 Operation Management4
  • 10 Operation Management6
  • 11 Exit Management6
  • 12 File Management7
  • 13 Verification Method7

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting.

Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document was proposed by the China Electricity Council.

This document is under the jurisdiction of the National Electricity Demand Side Management Standardization Technical Committee (SAC/TC575).

This document was drafted by: State Grid Zhejiang Electric Power Co., Ltd., State Electric Power Dispatching and Communication Center, China Southern Power Grid Research Institute Co., Ltd.

China Southern Power Grid Co., Ltd., China Electricity Council Technology Service Center Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd.

Lishui Power Supply Company, China Electric Power Research Institute Co., Ltd., Zhejiang Zheda Energy Technology Co., Ltd., Zhejiang Power Trading Co., Ltd.

Center Co., Ltd., Power Dispatching and Control Center of Guangdong Power Grid Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd., State Grid Shanghai Electric Power Co., Ltd.

The company's Economic and Technological Research Institute, State Grid Fujian Electric Power Co., Ltd., State Grid Anhui Electric Power Co., Ltd., Southeast University, State Grid Shandong Electric Power The company's Economic and Technological Research Institute, Suzhou Zhidian Energy Saving Technology Co., Ltd., Tianjin Anjie IoT Technology Co., Ltd., Zhejiang Huayun Information Technology Co., Ltd.

Technology Co., Ltd. and Beijing Haibosichuang Technology Co., Ltd.

The main drafters of this document are: Xiang Zhongming, Dong Shimeng, Luo Hongxuan, Zhang Feng, Liang Zhifeng, Guo Tao, He Sheng, Wang Yi, Qiu Yutao, Wang Xinyi, Wu Xiaogang, Deng Weiss, Zhang Yao, Jiang Xuedong, Liu Qiang, Liu Zhuguang, Meng Zijie, Li Gang, Wang Xiaohui, Chen Hourong, Ma Jinhui, Gao Ciwei, Zhao Xin, Qian Yanan, Qin Ling, Huang Bin and Guo Kai.

Virtual Power Plant Management Specifications

1 Scope

This document provides the principles for the management of the entire life cycle of virtual power plants, and stipulates the planning and design, construction and implementation, access testing, and registration of virtual power plants.

The requirements for grid connection, operation, management, withdrawal and archive management are described, and the corresponding verification methods are described.

This document applies to the planning, construction, access, testing, operation and decommissioning of virtual power plants that are connected to the grid management or participate in electricity market transactions.

Other virtual power plants shall follow suit.

2 Normative references

GB/T 22239

GB/T 25058

GB/T 28448

GB/T 32672

GB/T 36572

GB 38755

GB/T 38969

GB/T 39786

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Virtual power plant virtual power plant; VPP

Through advanced information and communication technology, intelligent metering and optimized control technology, distributed power supply, distributed energy storage, adjustable load, etc.

Distributed resources are integrated to form a system that can respond to grid demand, participate in power market operations or accept grid dispatch.

3.2 Virtual Power Plant Resources VPPresources

Distributed equipment or systems that can output electrical energy or provide electrical power regulation capabilities.

Note. Including but not limited to distributed power sources, distributed energy storage, adjustable loads and their combinations.

3.3 Virtual Power Plant Operator VPPoperator

The distributed resources and virtual machines with adjustable potential or power generation capacity are gathered together to participate in the power market or grid operation as a whole.

An institution that handles and represents related matters.

3.4 Virtual Power Plant Technical Support System VPPtechnicalsupportsystem

Operated by the virtual power plant operator, it provides technical support for its implementation of control strategies through two-way interactive communication of information, realizing information processing

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 44241

EditionTitleRevisionStatus
GB/T 44241-2024Virtual power plant management specificationcurrent editionCurrent

This page sells the current edition, GB/T 44241-2024. Earlier editions are listed for reference only.

How to Buy GB/T 44241-2024

  1. 1Add to cart. Click the "Buy GB/T 44241-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 44241-2024

$260.00

$220.00for partners