Valid

GB/T 44228.1-2024Smart photovoltaic power station—Part 1: General (English PDF)

智能光伏发电站 第1部分:总则

Open the GB/T 44228.1-2024 preview as PDF

Preview — first pages of GB/T 44228.1-2024 (full document: 15 pages)

This is a limited preview

Buy now to download the full PDF (15 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

July 24, 2024

Implementation date

July 24, 2024

Scope

GB/T 44228.1-2024 is the English-translated version of 智能光伏发电站 第1部分:总则.

GB/T 44228.1-2024 is the Chinese national standard covering smart photovoltaic power station, Part 1: General. Issued on 24 July 2024, it has been in force since 24 July 2024.

Document preview — GB/T 44228.1-2024

National Standard of the People's Republic of China

ICS
27.160
Classification
F 12

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface... Introduction...
  • 1 Scope...
  • 2 Normative referenced documents...
  • 3 Terms and Definitions...
  • 4 General Requirements...
  • 5 System Architecture...
  • 6 Intelligent Operation...
  • 7 Intelligent Inspection and Maintenance...
  • 8 Material Management...
  • 9 Marketing Management...
  • 10 Safety Management...
  • Appendix A (Informative) Classification of the degree of intelligence of smart photovoltaic power stations...
  • Appendix B (Informative) System Architecture of Smart Photovoltaic Power Station... References...

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting is required.

This document is part 1 of GB/T 44228 Intelligent Photovoltaic Power Station. GB/T 44228 has published the following parts. Part 1: General. - Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.

This document is proposed and coordinated by the China Electricity Council.

This document was drafted by: China Electric Power Research Institute Co., Ltd., Sungrow Power Supply Co., Ltd., Huawei Digital Energy Technology Co., Ltd.

Company, Nanjing NARI Water Conservancy and Hydropower Technology Co., Ltd., Zhejiang Chint Zhiwei Energy Service Co., Ltd., Nengjian Times (Shanghai) New Energy Storage TECHNOLOGY RESEARCH INSTITUTE LIMITED.

The main drafters of this document are: Wu Fubao, Chen Zhilei, Zhang Junjun, Liu Meiyin, Cao Xueyuan, Wan Song, Rui Jun, Qin Xiaodi, Li Jianzhou, Lin Xiaojin, Zhang Xiangwen, Du Ronghua, Chen Hongping, Zhang Xiaolin, Wu Beibei, Dong Wei, Yao Guangxiu, Ding Mingchang, Zhou Rongrong, Xu Lianghui, Yang Qingbin, Lu Yongqian, Jin Yangkun, Yuan Lixiang, Shi Zhiming, Ji Wanyu, Chen Xiaoxi.

Introduction

With the rapid development of information technology, the deep integration of technologies such as the Internet and artificial intelligence with the real economy has become a key factor in China's economic and technological development.

In order to actively respond to China's major strategic goals, the deep integration of new technologies such as artificial intelligence, big data, 5G and new energy power generation is the key to the development of China's optical fiber industry.

The development of photovoltaic technology is an inevitable trend. In the field of solar photovoltaic power generation, "smart photovoltaic" provides a new impetus for China to achieve its "dual carbon" goals.

Intelligent photovoltaic power station is based on automation, digitization and informatization, and uses cloud computing, big data, Internet of Things, mobile Internet, Artificial intelligence and other means have the ability of self-perception, self-learning, self-decision-making, self-execution and self-adaptation to achieve safety, stability, efficiency and autonomy At present, intelligent photovoltaic power stations have been widely used. GB/T 44228 "Intelligent Photovoltaic Power Station" aims to ensure Establish specifications that are generally applicable to the production, operation, inspection and maintenance of smart photovoltaic power stations, provide technical guidance for smart photovoltaic power generation, and help GB/T 44228 "Intelligent Photovoltaic Power Station" is planned to consist of 7 parts.

Part 1: General Principles. Aims to standardize the system architecture, intelligent operation, intelligent maintenance, and material management of smart photovoltaic power stations.

It sets the technical requirements for management, marketing management and safety management, and puts forward the overall program principles for the intelligentization of smart photovoltaic power stations.

Part 2: Intelligent working equipment. Aims to standardize the functions, performance and other technical requirements of intelligent working equipment. - Part 3: Intelligent integrated platform. Aims to standardize the architecture, functions, interface requirements and other technical requirements of the intelligent integrated platform.

Part 4: Intelligent Operation. Aims to standardize the relevant requirements for operation control of intelligent photovoltaic power stations. - Part 5: Intelligent maintenance and repair. Aims to standardize the relevant requirements for maintenance and repair of intelligent photovoltaic power stations. - Part 6: Intelligent unified information model. Aims to specify the technical requirements of the intelligent unified information model. - Part 7: Evaluation of the degree of intelligence. Aims to standardize the evaluation of the primary, intermediate and advanced intelligence levels of smart photovoltaic power stations Methods and other related requirements.

Smart Photovoltaic Power Plant Part 1: General

1 Scope

This document specifies the overall requirements for smart photovoltaic power stations, including system architecture, smart operation, smart maintenance, material management, market Technical requirements for marketing management and safety management.

This document applies to the design, construction, acceptance, operation, inspection and maintenance of smart photovoltaic power stations, cluster-controlled smart photovoltaic power generation The system can be executed as a reference.

2 Normative references

GB/T 36572

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Smart photovoltaic power station

Based on automation, digitization and informatization, using cloud computing, big data, the Internet of Things, mobile Internet, artificial intelligence and other means, With self-sensing, self-learning, self-decision-making, self-executing and self-adapting capabilities, it can realize safe, stable, efficient and autonomous photovoltaic power generation. stand.

[Source. GB/T 40222-2021, 3.1, modified]

3.2 Digital twin

Digital simulation for understanding, predicting, and optimizing the performance of physical objects.

[Source. GB/T 40222-2021, 3.5]

4 General requirements

4.1 The construction of smart photovoltaic power stations should be integrated with the overall planning of multi-type and multi-scenario photovoltaic power generation, with the functions of operation, maintenance, and materials.

Management, marketing management, safety management and other intelligent production and operation management capabilities.

4.2 Smart photovoltaic power stations should use intelligent devices and equipment to realize data collection and processing, and it is advisable to deploy an integrated management and control platform.

4.3 The network architecture of the smart photovoltaic power station should be planned as a whole, and the network security should comply with the requirements of GB/T 36572.

4.4 Smart photovoltaic power stations should establish a unified information model and coding system that is consistent with the actual physical layout.

4.5 Smart photovoltaic power generation should have the function of real-time linkage between information databases, and the function of automatically pushing information such as alarms and decisions in each link.

Intelligent photovoltaic power generation algorithms, models, and information databases should have the functions of autonomous learning, automatic optimization, and iterative evolution.

4.6 Smart photovoltaic power generation should support multi-source collection and cross-verification of information such as environment, equipment and facilities, production personnel and operation management, so as to achieve Interaction with relevant parties such as power grid dispatching and centralized control center.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Editions of GB/T 44228.1

EditionTitleRevisionStatus
GB/T 44228.1-2024Smart photovoltaic power station - Part 1: Generalcurrent editionCurrent

This page sells the current edition, GB/T 44228.1-2024. Earlier editions are listed for reference only.

How to Buy GB/T 44228.1-2024

  1. 1Add to cart. Click the "Buy GB/T 44228.1-2024" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 44228.1-2024

$185.00

$155.00for partners