Valid

GB/T 43219-2023Guidance to the inspection of mechanical sampling systems for moving stream of coal (English PDF)

移动煤流机械化采样系统检查导则

Preview PDF

This is a limited preview

Buy now to download the full PDF (19 pages)

Need quotation for your management?

Get a formal quotation for GB/T 43219-2023 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 7, 2023

Implementation date

April 1, 2024

Scope

GB/T 43219-2023 is the English-translated version of 移动煤流机械化采样系统检查导则.

This document specifies the general principles for inspecting a mechanical sampling system for a moving stream of coal: how the inspection procedure is established, the procedure itself, the quality control applied and the inspection records kept.

The document applies to mechanical sampling systems for moving streams of coal; stationary coal mechanical sampling systems may follow it as a reference.

Found what you need?

Document preview — GB/T 43219-2023

National Standard of the People's Republic of China

ICS
73.040
Classification
D 21

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • PrefaceI
  • Introduction
  • 1 Scope
  • 2 Normative reference documents
  • 3 Terms and Definitions
  • 4 General inspection rules
  • 4.1 General
  • 4.2 Precision check
  • 4.3 Bias check
  • 4.4 General requirements
  • 5 Establishment of inspection procedures
  • 5.1 General
  • 5.2 External verification
  • 5.3 Internal verification
  • 5.4 Run Check
  • 6 Inspection Procedure
  • 6.1 External verification
  • 6.2 Internal verification
  • 6.3 Run Check
  • 7 Quality Control
  • 7.1 General
  • 7.2 Sampling ratio
  • 7.3 Coefficient of variation
  • 7.4 Extraction ratio
  • 8 Inspection records
  • Appendix A (informative) Example 9 of inspection items for mechanized sampling system
  • Appendix B (informative) Operation check record example
  • Appendix C (Informative) Sample 15 of Sampling Inspection Records
  • Appendix D (Normative) Sampling Ratio Control Chart

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

Introduction

The coal mechanized sampling system mainly includes the moving coal flow mechanized sampling system and the stationary coal mechanized sampling system. However, in the coal machine There are also problems in the construction and use of mechanized sampling systems, such as improper selection, untimely and irregular performance testing, and failure to detect in time during operation and management.

Problems and other situations affect the normal use and standardized operation of the mechanized sampling system.

The external verification and internal verification specified in this document mainly focus on whether the mechanized sampling system meets the requirements of the corresponding standards and whether it meets the Inspection and evaluation based on specified operating conditions and design requirements. External verification can help evaluate the compliance, suitability of mechanized sampling systems Usability and effectiveness; internal verification can help evaluate the effectiveness of the continuous operation of the mechanized sampling system, identify possible problems and improve them; operation The inspection mainly focuses on the equipment, facilities and samples in all aspects of the entire process before each sampling operation of the mechanized sampling system, during the sampling process and after operation.

Inspection and evaluation of product quality can help discover problems existing in the daily use of mechanized sampling systems, infer the causes of problems and Improve. Inspection Guidelines for Mobile Coal Stream Mechanized Sampling System

1 Scope

This document specifies the general inspection principles, establishment of inspection procedures, inspection procedures, quality control and Inspection records.

This document is applicable to the mobile coal flow mechanized sampling system and the stationary coal mechanized sampling system for reference.

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.

GB/T 19494.1 Mechanized coal sampling Part 1: Sampling methods

GB/T 19494.2 Mechanized sampling of coal Part 2: Preparation of coal samples

GB/T 19494.3 Mechanized coal sampling Part 3: Precision determination and bias test

GB/T 30730 Technical conditions for coal mechanized sampling system

3 Terms and definitions

The terms and definitions defined in GB/T 19494.1 and the following apply to this document.

3.1 External audit

Personnel with corresponding professional capabilities and not directly related to the management and operation of the mechanized sampling system to be verified shall conduct inspections of the mechanized sampling system.

Inspection and assessment of compliance with the provisions of corresponding documents and system applicability.

Note: These documents mainly include GB/T 19494.1, GB/T 19494.2, GB/T 19494.3, GB/T 30730, etc.

3.2 Internal audit

Technical personnel with corresponding professional abilities who are not responsible for the daily operation of this mechanized sampling system (such as sampling technology managers, technical personnel in charge personnel, specialized workers, etc.) to inspect and evaluate whether the mechanized sampling system meets the operating specifications and operating conditions specified in the document.

Note: Operating specifications include performance test reports, procedures and work instructions formulated by the operating unit, operation and maintenance operation manuals and instructions provided by the manufacturer, etc.

3.3 Routine check

Before, during and after each operation of the mechanized sampling system, the operators evaluate the operating conditions of the equipment and facilities in all aspects of the entire process. and inspection of sampling conditions.

Note: Operators include those responsible for monitoring the operation of the sampling system, sample taking and collection.

3.4 Sampling ratio

The mechanized sampling system ultimately retains the ratio of the actual mass of the sample to the amount of coal represented by the sample.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 19 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 43219-2023

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
19 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 43219-2023

$385.00