Valid

GB/T 43209-2023Automation systems and integration - Virtual reconstruction technical requirements for smart production lines (English PDF)

自动化系统与集成 智能生产线虚拟重构技术要求

Open the GB/T 43209-2023 preview as PDF

Preview — first pages of GB/T 43209-2023 (full document: 18 pages)

This is a limited preview

Buy now to download the full PDF (18 pages)

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

September 7, 2023

Implementation date

April 1, 2024

Scope

GB/T 43209-2023 is the English-translated version of 自动化系统与集成 智能生产线虚拟重构技术要求.

GB/T 43209-2023 sets the technical requirements for the virtual reconstruction of smart production lines. Reconfiguring a line for a new product is normally done by trying it: the line stops, the cells are rearranged, and the problems are found on the floor. Virtual reconstruction moves that to a model built from the line's own data, which only works if the physical layer really can report its state and really is reconfigurable, which is why the standard puts requirements on the plant as well as on the software. It sets the overall architecture with its physical layer, virtual control layer and reconstruction function layer, the process definition, and the requirements on each layer - data acquisition capability, network, device reconfigurability and manufacturing cell division at the physical layer, and the corresponding requirements above it. It took effect on 1 April 2024.

Document preview — GB/T 43209-2023

National Standard of the People's Republic of China

ICS
25.040.40
Classification
J07

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope1
  • 2 Normative reference documents1
  • 3 Terms and Definitions1
  • 4 Abbreviations2
  • 5 Overall architecture3
  • 5.1 Overview3
  • 5.2 Physical layer3
  • 5.3 Virtual control layer3
  • 5.4 Reconstruct functional layer4
  • 6 Process Definition4
  • 7 Physical layer requirements6
  • 7.1 Data collection capability requirements6
  • 7.2 Network requirements6
  • 7.3 Device reconfigurability requirements6
  • 7.4 Manufacturing unit division requirements6
  • 8 Virtual control layer requirements7
  • 8.1 Data module requirements7
  • 8.2 Simulation module requirements8
  • 8.3 Monitoring module requirements10
  • 9 Refactoring functional layer requirements11
  • 9.1 Modeling requirements for process flow reconstruction module11
  • 9.2 Modeling requirements for production line layout reconstruction module11
  • 9.3 Modeling requirements for production scheduling reconstruction module12
  • 9.4 Logistics dispatch reconstruction module modeling requirements12
  • 9.5 Reconstruction algorithm performance requirements12
  • 13 Reference14

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part

1.Structure and Drafting Rules of Standardization Documents" Drafting. Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents. This document is proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Automation System and Integration Standardization Technical Committee (SAC/TC159). This document was drafted by: Tsinghua University, Beijing Institute of Machinery Industry Automation Co., Ltd., University of Hong Kong, Beijing University of Aeronautics and Astronautics, Beijing Institute of Electronic Engineering, Beijing Institute of Technology, Chongqing University, Lenovo (Beijing) Co., Ltd., Dongfeng Motor Group Co., Ltd. Department, Huazhong University of Science and Technology, Institute of Automation, Chinese Academy of Sciences, Zhejiang University, Aerospace Science and Industry Simulation Technology Co., Ltd., Beijing University of Technology Data Innovation Center Co., Ltd., China Electronics Technology Standardization Institute, Suzhou Haitong Robot System Co., Ltd., Beijing Jizhijia Technology Co., Ltd., Zhejiang Guozi Robot Technology Co., Ltd. The main drafters of this document. Shen Zuojun, Wang Haidan, Deng Tianhu, Ren Lei, Li Fei, Zhang Jinhui, Li Shuai, Li Xiaobin, Yu Chentao, Wang Zitao, Li Jincun, Yin Zuozhong, Ma Guocai, Zou Wei, Liu Sheng, Fu Genshen, Tian Ling, Lai Liyuanjun, Li Ming, Qin Hu, Sun Jiexiang, Wang Kai, Lu Rongsheng, Gao Jian, Tan Wenzhe, Liu Yuming, Tian Chunhua, Shao Lei, Zheng Hongbo, Tao Yikun, Hu Lin, Wei Xiguang. Automation systems and integration Technical requirements for virtual reconstruction of intelligent production lines

1 Scope

GB/T 43209-2023 sets the technical requirements for the virtual reconstruction of smart production lines. Reconfiguring a line for a new product is normally done by trying it: the line stops, the cells are rearranged, and the problems are found on the floor. Virtual reconstruction moves that to a model built from the line's own data, which only works if the physical layer really can report its state and really is reconfigurable, which is why the standard puts requirements on the plant as well as on the software. It sets the overall architecture with its physical layer, virtual control layer and reconstruction function layer, the process definition, and the requirements on each layer - data acquisition capability, network, device reconfigurability and manufacturing cell division at the physical layer, and the corresponding requirements above it. It took effect on 1 April 2024.

This document specifies the overall architecture, process definition, physical layer requirements, virtual control layer (data model) of intelligent production line virtual reconstruction technology. block, simulation module, monitoring module) technical requirements and reconstructed functional layer technical requirements. This document applies to the planning, design, implementation and application of intelligent production lines and related systems.

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.

GB/T 37973-2019 Information Security Technology Big Data Security Management Guide

GB/T 39334.2-2020 Digital simulation of mechanical product manufacturing process Part

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 production line A collection of equipment dedicated to the production of a specific quantity of product or product line. [Source: GB/T 20720.1-2019,3.1.33]

3.2 smart production line smart production line Apply instrumentation and automation technology, information technology, simulation technology, monitoring technology, and optimization technology to equipment, products, resources, and supporting facilities In the implementation unit, data, simulation models and algorithms are used to plan, implement, manage, monitor and optimize the production line.

3.3 The mapping of the physical production line in the virtual space can accurately reflect the events of the physical production line.

3.4 The process of reorganizing the manufacturing resources of the production line, redefining the process, layout, production scheduling, logistics, optimizing production, etc.

3.5 Use the data provided by the intelligent production line to simulate the production line equipment, processes, products, activities, status, etc., and analyze the production line process, Layout, production scheduling, logistics, etc. are optimized in real time.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 18 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Buy GB/T 43209-2023

  1. 1Add to cart. Click the "Buy GB/T 43209-2023" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
18 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 43209-2023

$310.00

$265.00for partners