GB/T 39334.2-2020Digital simulation of mechanical products manufacturing process—Part 2: Requirements of production line planning and layout simulation (English PDF)
机械产品制造过程数字化仿真 第2部分:生产线规划和布局仿真要求
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 39334.2-2020 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
November 19, 2020
Implementation date
March 1, 2021
Scope
GB/T 39334.2-2020 is the English-translated version of 机械产品制造过程数字化仿真 第2部分:生产线规划和布局仿真要求.
GB/T 39334.2-2020 is the Chinese standard "Digital simulation of mechanical products manufacturing process—Part 2: Requirements of production line planning and layout simulation".
Its scope clause reads: This part of GB/T 39334 specifies the general requirements and basic procedures for production line planning and layout simulation in the manufacturing process of mechanical products, and detailed requirements for simulation plan formulation, simulation model construction, simulation operation analysis, result evaluation and optimization.
This part is applicable to the application, development, service and research related to production line planning and layout simulation in the manufacturing process of mechanical products. Its clauses include terms and definitions; general requirements.
Found what you need?
Document preview — GB/T 39334.2-2020
National Standard of the People's Republic of China
- ICS
- 01.100.01
- Classification
- J 04
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative references1
- 3 Terms and definitions1
- 4 General requirements1
- 5 Basic process2
- 6 Detailed requirements3
- 6.1 Formulation of simulation plan3
- 6.2 Simulation model construction4
- 6.3 Simulation operation analysis7
- 6.4 Optimization and evaluation of results8
- Appendix A (informative appendix) Production line planning and layout simulation example11
1 Scope
This part of GB/T 39334 specifies the general requirements and basic procedures for production line planning and layout simulation in the manufacturing process of mechanical products.
And detailed requirements for simulation plan formulation, simulation model construction, simulation operation analysis, result evaluation and optimization.
This part is applicable to the application, development, service and research related to production line planning and layout simulation in the manufacturing process of mechanical products.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 24734.1-2009 Technical Product Documentation Digital Product Definition Data General Rules Part 1.Terms and Definitions
GB/T 26099.1-2010 General Rules for 3D Modeling of Mechanical Products Part 1.General Requirements
GB/T 26099.2-2010 General Rules for 3D Modeling of Mechanical Products Part 2.Part Modeling
GB/T 39334.1 Digital Simulation of Mechanical Product Manufacturing Process Part 1.General Requirements
3 Terms and definitions
GB/T 24734.1-2009, GB/T 26099.1-2010, GB/T 26099.2-2010 and GB/T 39334.1 defined and
The following terms and definitions apply to this document.
3.1 Production line planning
In the design or transformation stage of the production line, the station, equipment, material cache, storage, etc. in the production line are pre-determined according to the process route of the product
Activities such as the type, location, number, or capacity of facilities.
3.2 Production line layout
Under the conditions of meeting the given space or performance constraints, rationally and optimally arrange various facilities such as workstations, equipment, material storage, storage, etc.
Activities in a specific space.
3.3 Production line planning and layout simulation
Establish a system model to abstract and describe the production line, and use computer simulation technology to simulate the operation process of the actual production line, and then
In different working environments, the activities of verifying, analyzing and evaluating production line operation plans and strategies.
4 General requirements
Production line planning and layout simulation should meet the following requirements.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 39334.2-2020
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 39334.1-2020 — Digital simulation of mechanical products manufacturing process—Part 1: General requirements
GB/T 39334.3-2020 — Digital simulation of mechanical products manufacturing process—Part 3: Requirements of assembly workshop logistics simulation
GB/T 39334.4-2020 — Digital simulation of mechanical products manufacturing process—Part 4: Requirements of NC machining process simulation
Secure payment via Stripe
Payments accepted
GB/T 39334.2-2020
$240.00