GB/T 43201.2-2023Industrial automation systems and integration - Standardized procedures for production systems engineering - Part 2: Reference process for seamless production planning (English PDF)
工业自动化系统与集成 生产系统工程的标准化程序 第2部分:无缝衔接生产计划的参考过程
This is a limited preview
Buy now to download the full PDF (32 pages)
Need quotation for your management?
Get a formal quotation for GB/T 43201.2-2023 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 7, 2023
Implementation date
April 1, 2024
Scope
GB/T 43201.2-2023 is the English-translated version of 工业自动化系统与集成 生产系统工程的标准化程序 第2部分:无缝衔接生产计划的参考过程.
GB/T 43201.2-2023 is the Chinese standard "Industrial automation systems and integration - Standardized procedures for production systems engineering - Part 2: Reference process for seamless production planning".
Its scope clause reads: This document describes the reference planning process for seamless production planning. Note. In this document, "seamless" refers to considering multiple programs (related program areas) simultaneously during the product life cycle, as shown in Figure 1 and Figure B.1.
The scope of the reference processes discussed focuses on the planning of production systems, such as make-to-stock or assemble-to-order production. Live with the process Activity analysis is limited to activities within the production plan.
The scope of this document includes the following. ---Refer to the general overview of the planning process; ---Basic principles of process models; ---Description of each level determined during the reference planning process of production planning; ---The structure and relationships of activities within each program area; ---Relationships between cross-domain activities.
The scope of this document does not include the following. ---Material requirements planning/manufacturing resource planning; ---Production order control; ---production process; ---Early stages of product design; ---Order management, inventory management, procurement, transportation, warehousing; ---Production facility planning/manufacturing facility planning (physical plant and equipment), including any kind not directly related to the manufacturing process resource; ---Value chain (warehousing, operations management, outbound delivery, marketing and sales); ---Resource visualization; ---Process simulation.
Its clauses include normative reference documents; terms and definitions, abbreviations.
Found what you need?
Document preview — GB/T 43201.2-2023
National Standard of the People's Republic of China
- ICS
- 25.040.40
- Classification
- N10
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- Introduction
- 1 Scope
- 2 Normative reference documents
- 3 Terms and definitions, abbreviations
- 3.1 Terms and definitions
- 3.2 Abbreviations
- 4 Reference Model for Production Planning Process
- 4.1 Process A0 Summary
- 4.2 Process A2 Summary
- 4.3 Related program functions
- Appendix A (informative) Summary of relevant program functions
- Appendix B (informative) Production planning area
- Appendix C (Informative) Object Process Relationship Diagram
1 Scope
This document describes the reference planning process for seamless production planning.
Note. In this document, "seamless" refers to considering multiple programs (related program areas) simultaneously during the product life cycle, as shown in Figure 1 and Figure B.1.
The scope of the reference processes discussed focuses on the planning of production systems, such as make-to-stock or assemble-to-order production. Live with the process
Activity analysis is limited to activities within the production plan. The scope of this document includes the following.
---Refer to the general overview of the planning process;
---Basic principles of process models;
---Description of each level determined during the reference planning process of production planning;
---The structure and relationships of activities within each program area;
---Relationships between cross-domain activities.
The scope of this document does not include the following.
---Material requirements planning/manufacturing resource planning;
---Production order control;
---production process;
---Early stages of product design;
---Order management, inventory management, procurement, transportation, warehousing;
---Production facility planning/manufacturing facility planning (physical plant and equipment), including any kind not directly related to the manufacturing process resource;
---Value chain (warehousing, operations management, outbound delivery, marketing and sales);
---Resource visualization;
---Process simulation.
2 Normative reference documents
This document has no normative references.
3 Terms and definitions, abbreviations
3.1 Terms and definitions
The following terms and definitions apply to this document.
3.1.1 container
Choose shipping containers clearly, such as blister packs, lattice workpiece boxes or small parts containers.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 32 pages — is available in the English PDF.
Referenced standards
Similar standards
GB 38031-2025|GB/T43201.2-2023|GB/T 1.1-2020|GB/T 43201|GB/T 16656.238|GB/T 16656.1|GB/T 17645.1|GB/T 19114.1
How to Download GB/T 43201.2-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 43201.3-2023 — Industrial automation systems and integration - Standardized procedures for production systems engineering - Part 3: Information flows in production planning processes
GB/T 43201.4-2023 — Industrial automation systems and integration - Standardized procedures for production systems engineering - Part 4: Key performance indicators (KPIs) in production planning processes
GB/T 43201.5-2023 — Industrial automation systems and integration - Standardized procedures for production systems engineering - Part 5: Manufacture change management
Secure payment via Stripe
Payments accepted
GB/T 43201.2-2023
$500.00