GB/T 43125-2023Specification for productivity evaluation of shale oil (English PDF)
页岩油产能评价技术规范
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 43125-2023 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
September 7, 2023
Implementation date
January 1, 2024
Scope
GB/T 43125-2023 is the English-translated version of 页岩油产能评价技术规范.
This document specifies the evaluation of shale oil productivity: the evaluation parameters, the methods, the process to follow and the main results to be submitted.
The document applies to the productivity evaluation of shale oil recovered by fracturing stimulation and of shale oil recovered by in-situ conversion.
Found what you need?
Document preview — GB/T 43125-2023
National Standard of the People's Republic of China
- ICS
- 75.010; 75.020
- Classification
- E 11;D28
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- PrefaceI
- 1 Scope
- 2 Normative reference documents
- 3 Terms and Definitions
- 4 Fracturing stimulation shale oil production capacity evaluation
- 4.1 Applicable conditions for evaluation methods
- 4.2 Analytical method
- 4.3 Decreasing method
- 4.4 Numerical simulation method
- 4.5 Analogy
- 5 Evaluation of in-situ conversion shale oil production capacity
- 5.1 Applicable conditions for evaluation methods
- 5.2 Dynamic reservoir numerical simulation method
- 5.3 Analogy
- 6 Main results submitted
- 6.1 Fracturing-stimulated shale oil
- 6.2 In-situ conversion shale oil
- Appendix A (Normative) Fracturing Stimulated Shale Oil Production Capacity Evaluation Model
- A.1 Data collection and processing
- A.2 Capacity Evaluation Model
- A.3 Residual evaluation and model optimization principles
- Appendix B (Normative) Productivity evaluation of in-situ conversion shale oil dynamic reservoir numerical simulation method
- B.1 Dynamic reservoir numerical model and parameters
- B.2 Dynamic reservoir numerical simulation method productivity evaluation
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.
1 Scope
This document stipulates the shale oil production capacity evaluation parameters, evaluation methods, evaluation process and main results to be submitted.
This document is applicable to the productivity evaluation of fracturing-stimulated shale oil and in-situ conversion shale oil.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.
GB/T 18602 Rock Pyrolysis Analysis
GB/T 19145 Determination of total organic carbon in sedimentary rocks
SY/T 5124 Method for determination of vitrinite reflectance in sedimentary rocks
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Productivity evaluation
The process of evaluating the oil and gas production capabilities of production wells or development well groups at different stages.
3.2 Economic production life
The corresponding production time from when a normal production well or development well group starts to produce oil and gas to when the produced oil equivalent reaches the lower economic limit.
4 Fracturing stimulation shale oil production capacity evaluation
4.1 Applicable conditions for evaluation methods
4.1.1 Depending on the richness of the data, different methods are used to evaluate the productivity of production wells.
4.1.2 When well test data are available, the analytical method should be used.
4.1.3 When the production well has oil and gas production data for more than 12 months, the decline method should be used.
4.1.4 When a numerical model can be established for the evaluated area, numerical simulation method should be used.
4.1.5 When there are no wells drilled or put into production in the evaluated area and the following conditions are met, the analogy method should be adopted.
---The wells to be drilled or not put into production have the same or similar geological conditions, fracturing stimulation technology and intensity as typical wells that have been developed;
---Typical wells that have been developed have oil and gas production data for no less than 12 months.
4.2 Analytical method
4.2.1 Determination of key parameters
4.2.1.1 The key parameters for the analytical productivity evaluation include the effective permeability of the reservoir and fractures, the effective half-length of the fractures, the conductivity of the fractures, and the fracture conductivity.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 18602Rock pyrolysis analysis
- GB/T 19145Determination for total organic carbon in sedimentary rock
SY/T 5124
Similar standards
How to Download GB/T 43125-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 18602-2012 — Rock pyrolysis analysis
GB/T 19145-2022 — Determination for total organic carbon in sedimentary rock
GB/T 7251.4-2026 — Low-voltage switchgear and controlgear assemblies - Part 4: Particular requirements for assemblies for construction sites (ACS)
Secure payment via Stripe
Payments accepted
GB/T 43125-2023
$240.00