GB/T 42936-2023Facility management - Guidance on process management (English PDF)
设施管理 过程管理指南
Open the GB/T 42936-2023 preview as PDF
This is a limited preview
Buy now to download the full PDF (38 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 6, 2023
Implementation date
August 6, 2023
Scope
GB/T 42936-2023 is the English-translated version of 设施管理 过程管理指南.
GB/T 42936-2023 gives guidance on process management within facility management. Facility management is the discipline that keeps buildings and their services working for the organisation that occupies them, and it is characteristically run as a collection of separate contracts - cleaning, security, maintenance, catering - each managed on its own terms, so that nobody owns the outcome the occupier actually experiences. Treating it as a set of connected processes is what the standard is arguing for. It sets the general and systematic provisions, the requirements background, the role of leadership, the organisation and personnel and the financial budget, then the facility management planning and management and the operation and maintenance management, followed by the evaluation and the improvement of the processes. It took effect on 6 August 2023.
Document preview — GB/T 42936-2023
National Standard of the People's Republic of China
- ICS
- 03.080.01
- Classification
- J04
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope1
- 2 Normative reference documents1
- 3 Terms and Definitions1
- 4 General2
- 4.1 Systematic2
- 4.3 Continuous adaptability3 5 planning3
- 5.1 Requirement background3
- 5.2 Leadership role3
- 5.3 Organization and personnel3
- 5.4 Financial Budget3
- 6.1 Overview3
- 6.2 FM Planning and Management5
- 6.4 Construction project management22
- 6.5 Operation and maintenance management 29 7 ratings 34 8 improvements34
- 62 Customer Satisfaction Evaluation34
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part
1.Structure and Drafting Rules of Standardization Documents" Drafting. Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents. This document is proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Facilities Management Standardization Technical Committee (SAC/TC581). This document was drafted by: China Machinery Productivity Promotion Center Co., Ltd., Shenzhen Facility Home Technology Co., Ltd., Beijing Bolvxin Telecom Shi Management Co., Ltd., Volvo (China) Investment Co., Ltd., Microsoft (China) Co., Ltd., Tencent Technology (Shenzhen) Co., Ltd., Newmark Real Estate Brokerage Shanghai Co., Ltd., Shanghai Fosun Health Technology (Group) Co., Ltd., Suzhou Soochow Property Management Co., Ltd., Huachenbao Ma Automobile Co., Ltd., Jiangsu Provincial Institute of Quality and Standardization, Shenyang Futel Technology Service Co., Ltd., Beijing CLP Kyle Facilities Management Co., Ltd., British Standard Certification Technical Training (Beijing) Co., Ltd., Shandong Guoshun Construction Group Co., Ltd., China Southern Power Grid Peak Regulation and Frequency Modulation Power Generation Co., Ltd. Ltd. The main drafters of this document. Zhang Limin, Wu Jiao, Fan Xuesong, Huang Gang, Chen Kaijun, Chen Yuansheng, Huang Chengyu, Xu Yanqi, Zhang Jing, Xu Lei, Zhu Chunhua, Ma Hongyu, Wang Jing, Zhang Li, Li Xuerong, Feng Weizhong, Zhao Lianhe, Jiang Yuan, Lu Yang, Li Yulin.
0.1 Purpose A series of FM processes established, integrated and continuously improved by the facilities management (FM) organization according to needs are the basis for realizing the facility management function. This element, clearly and accurately defining these processes is an important basis for facilities management to carry out activities efficiently and effectively promote core business. implement The purpose of these processes is to create and manage a productive work environment that supports and facilitates the organization's core business objectives. These processes have clear activities and descriptions, monitorable inputs and outputs, interrelated relationships between processes, and applicable processes. methods to achieve continuous improvement.
0.2 Effect ISO 41001.2018 "Facility Management Management System Requirements and Guidelines for Use" is based on the high-level structure of ISO management system standards Established to guide the unified certification of the global facility management industry. In practice, organizations often face difficulties when introducing ISO 41001 management systems. Disaster. On the one hand, the unified high-level structure of ISO brings the advantage of being easy to learn. At the same time, it also makes it easier for people to combine other aspects such as quality management systems. The content is copied into the facility management system, so that it cannot play the important role that ISO 41001 should have; on the other hand, facility management includes It covers many functions at the strategic, tactical and operational levels. For most organizations, these functions and management systems are effectively connected. Coming is not easy. This document uses a process approach to sort out the functions of facility management and can be used as a supporting document for ISO 41001 to solve The above problems can also provide guidance on the structure design and function allocation of facility management organizations.
0.3 Process approach A process can consist of an activity or a set of activities that transform input into output through the use of certain resources. Within a system, through Often the output of one process directly forms the input of the next process, and a series of interrelated processes constitute the organization's process workflow. Facilities management organizations should implement effective monitoring and control of processes through a recognized Plan-Do-Check-Act (PDCA) approach. Improved,PDCA can be briefly described as follows:
---Planning (P). Establishing necessary goals and processes in accordance with customer requirements and organizational policies to achieve the purpose of delivering results;
---Implementation (D). execution process;
---Inspection (C). Monitor, measure processes and products against policies, goals and product requirements and report results;
---Disposition (A). Take measures to continuously improve process performance. Facilities Management Process Management Guide
1 Scope
GB/T 42936-2023 gives guidance on process management within facility management. Facility management is the discipline that keeps buildings and their services working for the organisation that occupies them, and it is characteristically run as a collection of separate contracts - cleaning, security, maintenance, catering - each managed on its own terms, so that nobody owns the outcome the occupier actually experiences. Treating it as a set of connected processes is what the standard is arguing for. It sets the general and systematic provisions, the requirements background, the role of leadership, the organisation and personnel and the financial budget, then the facility management planning and management and the operation and maintenance management, followed by the evaluation and the improvement of the processes. It took effect on 6 August 2023.
This document establishes the general principles of process management in facilities management and provides guidance for planning, defining, evaluating and improving facilities management processes. This document applies to facilities management activities in all types of organizations.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document.
GB/T 19000 Quality Management System Fundamentals and Terminology
GB/T 36688 Facility Management Terminology
3 Terms and definitions
The terms and definitions defined in GB/T 19000 and GB/T 36688 and the following apply to this document.
3.1 organization A person or a group of people whose functions are composed of responsibilities, authorities and relationships to achieve a goal.
Note. The concept of organization includes but is not limited to agents, companies, groups, firms, enterprises, administrative agencies, partnerships, charities or research institutions, or Part or combination of the above-mentioned organizations, whether incorporated or not, public or private. [Source: GB/T 36688-2018,3.3.1]
3.2 activity activity One or more tasks that contribute to the completion of a deliverable. [Source: GB/T 36688-2018,3.5.2]
3.3 process process A set of interrelated or interacting activities that convert inputs into outputs. [Source: GB/T 36688-2018,3.5.1]
3.4 customercustomer A person or organization that can or actually accepts products or services provided to it or provided at its request. Examples. consumers, principals, end users, retailers, recipients of products or services of internal processes, beneficiaries and purchasers.
Note. Customers can be internal or external to the organization. [Source: GB/T 19000-2016,3.2.4]
3.5 An organizational function that integrates people, places, and processes within the built environment with the purpose of improving people's quality of life and increasing core business productivity. [Source: GB/T 36688-2018,3.1.1]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 38 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 19000 · GB/T 36688
Similar standards
GB 38031-2025|GB/T42936-2023|GB/T 1.1-2020|GB/T 19000|GB/T 36688|GB/T 36688-2018|GB/T 19000-2016|GB/T 42869
How to Buy GB/T 42936-2023
- 1Add to cart. Click the "Buy GB/T 42936-2023" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 42936-2023
$605.00