GB/T 42556-2023Specification of supervision and administration for electricity meter (English PDF)
电能表监督管理规范
This is a limited preview
Buy now to download the full PDF (20 pages)
Need quotation for your management?
Get a formal quotation for GB/T 42556-2023 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
May 23, 2023
Implementation date
December 1, 2023
Scope
GB/T 42556-2023 is the English-translated version of 电能表监督管理规范.
This document specifies what the supervision and administration of electricity meters covers over the whole life of the meter, the methods it uses and the basic requirements it has to meet.
The document applies to the supervision and administration of installed electricity meters through production, acceptance supervision, testing, transport, installation, operation, removal and scrapping.
Found what you need?
Document preview — GB/T 42556-2023
National Standard of the People's Republic of China
- ICS
- 17.220.99
- Classification
- N 22
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 General requirements
- 5 Supervision and management in the production process
- 5.1 The supervision and management work that electric energy meter manufacturers should carry out
- 5.2 Manufacturing supervision
- 6 Quality supervision and management before installation and use
- 6.1 Send samples for testing before bidding
- 6.2 Sampling inspection before delivery
- 6.3 Sampling and acceptance after arrival
- 6.4 The first inspection after arrival
- 6.5 Calibration quality check
- 6.6 Storage and transportation process management
- 7 Supervision and management during installation and operation
- 7.1 Energy meter installation
- 7.2 Running status management
- 7.3 On-site inspection
- 7.4 Abnormal (objection) handling
- 7.5 Energy meter replacement
- 7.6 Results and Judgment
- 8 Supervision and management of the dismantled electric energy meter
- 8.1 Sorting management of disassembled energy meters
- 8.2 Disposal of disassembled electric energy meter
- Appendix A (informative) Main production, process and testing equipment of electric energy meters
- Appendix B (Normative) Key Quality Control Points and Control Requirements
- Appendix C (Normative) Energy Meter Test Items
- Appendix D (informative) Sampling detection method of electric energy meter in operation D 3 Result determination
- Reference
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.
1 Scope
This document specifies the content, methods and basic requirements for the supervision and management of the entire life cycle of electric energy meters.
This document is applicable to the supervision and management during the production, supervision, testing, transportation, installation, operation, dismantling and scrapping of installed electric energy meters.
2 Normative references
The contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 2828.1 Counting sampling inspection procedure Part 1: Batch-by-batch inspection sampling plan retrieved by acceptance quality limit (AQL)
GB/T 17215.211-2021 Electrical Measuring Equipment (AC) General Requirements, Tests and Test Conditions Part 11: Measuring Equipment
GB/T 17215.301-2007 Special requirements for multi-function electric energy meters
GB/T 17215.321-2021 Electrical Measuring Equipment (AC) Particular Requirements Part 21: Static Active Energy Meters (Class A, B, C, D and E)
DL/T 825 Installation and Wiring Rules for Electric Energy Metering Devices
DL/T 1478 Field Inspection Rules for Electronic AC Energy Meters
JJG569-2014 Maximum demand electric energy meter
JJG596-2012 Electronic AC energy meter
JJG597-2005 AC Electric Energy Meter Calibration Device
JJG691-2014 Multi-rate AC energy meter JJG1085-2013 standard electric energy meter
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 State evaluation
Fault statistics and analysis, batch sampling by means of on-site inspection, daily inspection or information system online monitoring and data analysis Sample inspection, etc., and evaluate the state of the electric energy meter accordingly.
3.2 Components and materials
Components, structural parts, spare parts, auxiliary materials, etc. that make up the electric energy meter.
3.3 Supervision unit
An organization that has the qualifications of a legal person, has obtained equipment supervision qualifications, and is engaged in manufacturing supervision services.
3.4 Sample comparison
Use physical objects, photos, etc. to realize the data archiving of qualified samples. During the delivery period, compare the incoming electric energy meter with the archived data
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 2828.1Sampling procedures for inspection by attributes - Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection
- GB/T 17215.211-2021Electricity metering equipment(AC) - General requirements, tests and test conditions - Part 11: Metering equipment
- GB/T 17215.301-2007Electricity metering equipment (AC) - Particular requirements - Part 1: Multi-function electricity meters
- GB/T 17215.321-2021Electricity metering equipment (AC) - Particular requirements - Part 21: Static meters for active energy(classes A, B, C, D and E)
- DL/T 1478On-site Inspection Procedures for Electronic AC Watt-hour Meter
- JJG 569-2014Verification Regulation of Electricity Meters with Maximum Demand Measurement Functions
DL/T 825 · JJG 596-2012 · JJG 597-2005
Similar standards
How to Download GB/T 42556-2023
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
DL/T 1478-2015 — On-site Inspection Procedures for Electronic AC Watt-hour Meter
GB/T 17215.211-2021 — Electricity metering equipment(AC) - General requirements, tests and test conditions - Part 11: Metering equipment
GB/T 17215.321-2021 — Electricity metering equipment (AC) - Particular requirements - Part 21: Static meters for active energy(classes A, B, C, D and E)
Secure payment via Stripe
Payments accepted
GB/T 42556-2023
$330.00