GB/T 42496-2023Guidelines for green exhibition operation (English PDF)
绿色展览运营指南
Open the GB/T 42496-2023 preview as PDF
This is a limited preview
Buy now to download the full PDF (15 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 17, 2023
Implementation date
March 17, 2023
Scope
GB/T 42496-2023 is the English-translated version of 绿色展览运营指南.
GB/T 42496-2023 covers how a trade exhibition is run so that less of it ends up in a skip, and it is arranged by who does the work rather than by subject. Clause 4 states the principles: environmental protection, built on the reduce, reuse and recycle rule the text names; a forward-looking principle; and a principle of synergy between the parties. Clauses 5 to 8 then take each group through the phases of the event. The organiser has preparatory, move-in, on-display, move-out and summary stages; exhibitors and venue operators have the same phases without the summary; and clause 8 splits the service providers into stand construction firms, transport and logistics companies, information service companies, caterers and waste disposal companies, with 8.1.1 asking that a booth be designed on the reduce, reuse and recycle principles and toward simpler decoration and standardised construction. That division is the point: a stand is built and demolished inside a week, and no single party can cut that waste alone when the organiser sets the rules, the exhibitor buys the stand and the contractor builds it. Terms follow GB/T 26165-2021. For organisers, venue operators, exhibitors and exhibition service contractors.
Document preview — GB/T 42496-2023
National Standard of the People's Republic of China
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative references4
- 3 Terms and definitions4
- 4 Basic principles5
- 4.1 Principles of environmental protection5
- 4.2 Forward-looking principle5
- 4.3 Principle of synergy6
- 5 Key points in operation of the organizer (co-organizer)7
- 5.1 Preparatory phase7
- 5.2 Move-in stage8
- 5.3 On-display stage8
- 5.4 Move-out stage9
- 5.5 Summary stage9
- 6 Key points in operation of exhibitors10
- 6.1 Preparatory phase10
- 6.2 Move-in stage10
- 6.3 On-display stage10
- 6.4 Move-out stage11
- 7 Key points in operation of exhibition venue operators11
- 7.1 Preparatory phase11
- 7.2 Move-in stage11
- 7.3 On-display stage11
- 7.4 Move-out stage12
- 8 Key points in operation of exhibition service providers12
- 8.1 Key points in operation of exhibition construction project enterprises12
- 8.2 Key points in operation of transportation and logistics enterprises13
- 8.3 Key points in operation of information service enterprises13
- 8.4 Key points in operation of catering service providers14
- 8.5 Key points in operation of waste disposal companies14
- References15
Foreword
This document was issued on 17 March 2023 by the State Administration for Market Regulation; Standardization Administration of the PRC and takes effect on 17 March 2023.
It is a GB/T standard: recommended rather than compulsory, but it is the text a Chinese reviewer applies when assessing a submission.
1 Scope
GB/T 42496-2023 covers how a trade exhibition is run so that less of it ends up in a skip, and it is arranged by who does the work rather than by subject. Clause 4 states the principles: environmental protection, built on the reduce, reuse and recycle rule the text names; a forward-looking principle; and a principle of synergy between the parties. Clauses 5 to 8 then take each group through the phases of the event. The organiser has preparatory, move-in, on-display, move-out and summary stages; exhibitors and venue operators have the same phases without the summary; and clause 8 splits the service providers into stand construction firms, transport and logistics companies, information service companies, caterers and waste disposal companies, with 8.1.1 asking that a booth be designed on the reduce, reuse and recycle principles and toward simpler decoration and standardised construction. That division is the point: a stand is built and demolished inside a week, and no single party can cut that waste alone when the organiser sets the rules, the exhibitor buys the stand and the contractor builds it. Terms follow GB/T 26165-2021. For organisers, venue operators, exhibitors and exhibition service contractors.
This document provides guidance on the entire process of green exhibition operations,
clarifies basic principles, and provides stakeholders of the exhibition with guidance and
measures for green operations at different stages of the entire exhibition process.
This document applies to the operation of green exhibitions.
2 Normative references
The following documents contain the provisions which, through normative reference in
this document, constitute the essential provisions of this document. For the dated
referenced documents, only the versions with the indicated dates are applicable to this
document; for the undated referenced documents, only the latest version (including all
the amendments) is applicable to this document.
GB 3095-2012 Ambient air quality standard
GB/T 24001 Environmental management systems - Requirements with guidance
for use
GB/T 26165-2021 Trade exhibition - Terminology
GB/T 41129-2021 Evaluation guidelines for green booth
3 Terms and definitions
Terms and definitions defined in GB/T 26165-2021 and the following apply to this
document.
3.1 stakeholders of the exhibition
Relevant individuals or organizations involved in the entire exhibition process of
preparation, move-in, on-display, move-out, summary, etc.
NOTE: Exhibition-related parties include but are not limited to the organizer (co-organizer), exhibitors,
exhibition venue operators, exhibition service providers, etc.
3.2 operation of green exhibition
Relevant parties in the exhibition collaborate with each other to implement the principle
of Reduce, Reuse, and Recycle throughout the entire exhibition process, giving priority
to elements such as environmentally friendly design, technology, processes, equipment,
facilities, materials, and venues to achieve sustainable development of the exhibition.
4 Basic principles
4.1 Principles of environmental protection
It is crucial that the entire exhibition implementation process follows the 3R principle
of Reduce, Reuse, and Recycle:
a) Reduce: Use fewer resources to achieve exhibition functions;
b) Reuse: The materials used can be used repeatedly in their original form or after
repair and renovation;
c) Recycle: The resources used can be recycled and reused economically.
4.2 Forward-looking principle
Stakeholders of the exhibition should assess the situation, pay attention to
developments and changes, and plan scientifically and systematically. The following
measures are crucial:
a) Stakeholders should assume social responsibility, pay attention to, implement,
and jointly promote the concept of green development of exhibitions and
national requirements for sustainable development, such as carbon emissions,
plastic ban, etc.;
b) It is advisable to pay attention to the development of science and technology,
and promote the green development of exhibitions through the introduction of
scientific and technological means, environmental protection and energy-
saving measures, online and offline technical means, etc.;
c) Incentive measures can be taken appropriately to encourage the
implementation of measures for the operation of green exhibitions. It is
advisable to carry out green exhibition stand evaluation in accordance with
GB/T 41129-2021 and explore the implementation path of carbon peaking and
carbon neutrality for exhibitions;
d) It is advisable to cooperate, pay attention to and control the friendliness of the
working environment, provide protective devices and equipment, and ensure
including but not limited to domestic waste, solid waste, hazardous waste, etc.
5.3.4 It is appropriate to promote the green concept of exhibitions and demonstrate the
results of green exhibition operations during the exhibition through some channels or
forms.
5.3.5 Green-themed exhibition selection and exchange activities can be held during the
exhibition, with themes including but not limited to green exhibitions, green materials,
green transportation, etc.
5.4 Move-out stage
5.4.1 It is appropriate to standardize and supervise the operating procedures of
exhibitors, exhibition construction project enterprises, waste disposal companies, and
other stakeholders of the exhibition involved in the move-out of the exhibition, so that
they comply with green environmental protection requirements.
5.4.2 It is advisable to implement green booth evaluation in accordance with GB/T
41129-2021, focusing on monitoring the recycling of professional exhibition equipment
and the recycling and disposal of solid waste.
5.5 Summary stage
5.5.1 It is appropriate to evaluate and summarize the experience and shortcomings of
the green implementation of the exhibition according to the PDCA principle (referring
to Plan, Do, Check, and Action), formulate improvement measures, and form a report.
Improvement measures should be included in the green exhibition operation plan for
the next cycle of exhibitions.
5.5.2 It is appropriate to analyze the green operation of this exhibition based on the data
of the entire exhibition process and the evaluation indicators determined in the plan.
The indicators such as green booth popularizing rate, air environment data, and waste
disposal volume shall be analyzed emphatically with reference to GB/T 41129-2021.
5.5.3 Post-exhibition reports should be sent in an information-based manner.
5.5.4 Customer relationship maintenance should be carried out through video
conferencing.
and reduce the collection of paper business cards.
6.3.5 It is advisable to give priority to green travel, such as public transportation, and
choose accommodation that has obtained green-related certifications and is close to the
public transportation system.
6.4 Move-out stage
6.4.1 Green and low-carbon methods should be used to return exhibits.
6.4.2 It is appropriate to recycle booth decorations, promotional materials, etc.
6.4.3 Unnecessary but fully functional exhibits and other materials can be donated to
local schools or social welfare groups.
Remaining clauses in the full document
- 5 Key points in operation of the organizer (co-organizer)
- 6 Key points in operation of exhibitors
- 7 Key points in operation of exhibition venue operators
- 8 Key points in operation of exhibition service providers
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Normative references
- GB 3095-2012 Ambient air quality standardAmbient air quality standards
- GB/T 26165-2021 Trade exhibition - TerminologyTrade exhibition - Terminology
- GB/T 41129-2021 Evaluation guidelines for green boothEvaluation guidelines for green booth
GB/T 24001 Environmental management systems - Requirements with guidance
Similar standards
GB 38031-2025|GB 3095-2012|GB/T 24001|GB/T 26165-2021|GB/T 41129-2021|GB/T 41129-2021|GB/T 42504|GB/T 42500
How to Buy GB/T 42496-2023
- 1Add to cart. Click the "Buy GB/T 42496-2023" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 47310-2026 — Determination of total silicon, aluminium, iron, potassium, sodium, calcium, magnesium, manganese, phosphorus, titanium and sulfur in soil - Monochromatic excitation energy dispersive X-ray fluorescence spectrometry
GB/T 47321-2026 — Specification for the warning data exchange of the national emergency early warning dissemination system
GB/T 47293-2026 — Determination of available mercury in soil
Secure payment via Stripe
Payments accepted
GB/T 42496-2023
$170.00