Valid

GB/T 41717-2022Terminology of ageing management and life management for nuclear power plants (English PDF)

核电厂老化管理与寿命管理术语

Preview PDF

This is a limited preview

Buy now to download the full PDF (20 pages)

Need quotation for your management?

Get a formal quotation for GB/T 41717-2022 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 14, 2022

Implementation date

May 1, 2023

Scope

GB/T 41717-2022 is the English-translated version of 核电厂老化管理与寿命管理术语.

GB/T 41717-2022 is the Chinese national vocabulary for the ageing management and life management of nuclear power plants. It defines the terms commonly used in that work, and is written for the ageing and life management of nuclear power plants, other nuclear facilities being able to use it as a reference.

The terms are grouped into basic terms, the terms of ageing mechanisms and ageing effects, the terms of ageing management and the terms of life management, and the document closes with a bibliography and an index.

Among the basic terms are structures, systems and components, active and passive components, and the pre-service and service conditions they undergo. It has no normative references. Issued on 14 October 2022, it has applied since 1 May 2023.

Found what you need?

Document preview — GB/T 41717-2022

National Standard of the People's Republic of China

ICS
27.120
Classification
F 04

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Basic terms
  • 4 Aging mechanisms and terminology of aging effects
  • 5 Aging Management Terminology
  • 6 Life Management Terminology
  • Reference
  • Index

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting.

1 Scope

This document defines commonly used terms related to aging management and life management of nuclear power plants.

This document is applicable to the aging management and life management of nuclear power plants, and can be used as a reference for other nuclear facilities.

2 Normative references

This document has no normative references.

3 Basic terms

3.1 Structures, systems and components; SSCs

A collective term for all elements (items) in a nuclear power plant facility or activity other than human factors.

3.2 Active component

It includes moving parts or components with structural and characteristic changes when performing predetermined functions (5.2).

3.3 Passive component

Components that do not contain moving parts and do not change in structure and characteristics when performing their intended function (5.2).

3.4 Conditions

objective conditions and/or influencing factors that may have an effect on structures, systems and components (3.1)

3.5 Pre-service conditions

Before the initial operation (such as manufacturing, storage, transportation, installation, commissioning and trial operation stage) structures, systems and components (3.1) suffered or experienced actual conditions (3.4).

3.6 Service conditions

actual conditions (3.4) to which structures, systems and components (3.1) are subjected or experienced during their service life (6.1.4)

Note: Service conditions include operating states (normal operation and expected operating events), accident conditions (design basis accidents and design extension conditions) and post-accident conditions.

Service conditions can be divided into environmental conditions (3.7) and functional conditions (3.8).

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 41717-2022

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
20 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 41717-2022

$360.00