Valid

GB/T 40484-2021Fire safety management for urban rail transit (English PDF)

城市轨道交通消防安全管理

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 40484-2021 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 20, 2021

Implementation date

December 1, 2021

Scope

GB/T 40484-2021 is the English-translated version of 城市轨道交通消防安全管理.

GB/T 40484-2021 sets out how fire safety is managed in the operation of urban rail transit systems such as metros and light rail.

It covers the general requirements for the operating company, the fire safety organization and the responsibilities of units and staff, daily fire prevention, with fire inspections, rectification of hidden hazards and control of hazard sources, and the use, maintenance and inspection of fire-fighting facilities.

It also deals with fire-fighting and emergency evacuation plans, drills and emergency supplies, with fire safety publicity, education and special training, and with keeping the fire safety file.

The operating company is required to link its emergency arrangements with the relevant government departments. It was issued on 20 August 2021 and has applied since 1 December 2021.

Found what you need?

Document preview — GB/T 40484-2021

National Standard of the People's Republic of China

ICS
13.220.01
Classification
C 80

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 General requirements
  • 5 Fire safety organization and responsibilities
  • 5.1 General requirements
  • 5.2 Unit Responsibilities
  • 5.3 Personnel Responsibilities
  • 6 Daily fire prevention management
  • 6.1 General requirements
  • 6.2 Fire inspection and inspection
  • 6.3 Rectification of hidden dangers
  • 6.4 Control of Hazardous Sources
  • 7 Fire-fighting facility management
  • 7.1 Daily use operation
  • 7.2 Maintenance and inspection
  • 8 Fire fighting and emergency evacuation plans and drills
  • 8.1 General requirements
  • 8.2 Fire fighting and emergency evacuation plan
  • 8.3 Fire fighting and emergency evacuation drill
  • 8.4 Emergency supplies
  • 9 Fire propaganda, education and training
  • 9.1 General requirements
  • 9.2 Propaganda, education and training content
  • 9.3 Special training
  • 10 Fire File
  • 10.1 General requirements
  • 10.2 File content
  • 10.3 Safekeeping

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents" Drafting.

1 Scope

This document specifies the general requirements, fire safety organization and responsibilities, daily fire protection management, fire protection Facilities management, fire-fighting and emergency evacuation plans and drills, fire-fighting publicity, education and training, and fire-fighting file management.

This document is applicable to the fire safety management of urban rail transit operations such as subways and light rails.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document.

GB/T 5907.1 Fire Vocabulary Part 1: General Terminology

GB 50157 Metro Design Code

GB 50490 Technical Code for Urban Rail Transit

GB/T 50833 Standard Terminology Standard for Urban Rail Transit Engineering

GB 51298 Metro design fire protection standard

3 Terms and definitions

The terms and definitions defined in GB/T 5907.1, GB 50157, GB 50490, GB/T 50833 and GB 51298 and the following terms and definitions apply to this document.

3.1 Emergency response plan

Guiding documents formulated in advance for the actions required to respond to possible accidents or emergencies.

3.2 Operation department

The organization responsible for the operation and management of urban rail transit.

3.3 Station

A place for trains to stop, passengers to buy tickets, to wait for and to board and land with corresponding facilities.

4 General requirements

4.1 The operating unit shall implement the fire protection work policy of "prevention first, combining prevention and elimination", and implement the "unified government leadership, legal supervision by the department, and unit The principle of "full responsibility and active participation of citizens" in the fire protection work principle, comprehensive implementation of the "party and government with the same responsibility, one post with two responsibilities" system, and implementation of the fire safety responsibility system, Accept the government's unified leadership and departmental supervision in accordance with the law to ensure the safe operation of rail transit.

4.2 The operating unit shall, under the unified organization and coordination of the local government, establish linkage liaison and emergency rescue aircraft connected with relevant government departments. System, and incorporated into the urban emergency response plan system for public emergencies.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 40484-2021

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 40484-2021

$270.00