Valid

GB/T 38179-2019Gas turbine applications - Requirements for power generation (English PDF)

燃气轮机应用 用于发电设备的要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (162 pages)

Need quotation for your management?

Get a formal quotation for GB/T 38179-2019 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

October 18, 2019

Implementation date

May 1, 2020

Scope

GB/T 38179-2019 is the English-translated version of 燃气轮机应用 用于发电设备的要求.

GB/T 38179-2019 sets the minimum technical and data requirements used to evaluate and purchase gas turbines for power generation.

It applies to land and marine simple-cycle, combined-cycle and cogeneration gas turbines and to the testing of gas turbine generator sets, but not to gas turbines for propulsion - aircraft, barges, floating vessels and ships - nor to micro gas turbines.

It covers performance under standard reference and site conditions, site utilities, emissions, contracted fuel and fuel systems, operating and quality requirements, reliability, availability and maintainability, safety, the gas turbine body, gearboxes and couplings, intake and exhaust systems, control and electrical systems, maintenance, auxiliary equipment and verification tests, while Annex A holds the data sheets buyer and seller fill in.

It adopts ISO 19859:2016 by translation, was issued on 18 October 2019 and has applied since 1 May 2020.

Found what you need?

Document preview — GB/T 38179-2019

National Standard of the People's Republic of China

ICS
27.040
Classification
K 56

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Foreword
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Performance comparison evaluation under standard reference conditions
  • 4.1 Overview
  • 4.2 Standard Reference Conditions
  • 4.2.1 Overview
  • 4.2.2 Ambient conditions
  • 4.2.3 Exhaust conditions
  • 4.2.4 Cooling water conditions (if used)
  • 4.2.5 Working Heater or Cooler
  • 4.2.6 Performance Evaluation Fuel
  • 5 Performance under field conditions
  • 5.1 Field performance parameters
  • 5.1.1 Site rated power
  • 5.1.2 Site minimum load
  • 5.1.3 On-site net heat consumption rate
  • 5.1.4 On-site peak load
  • 5.2 Site conditions
  • 5.3 Amendment
  • 6 Site conditions and utilities
  • 6.1 Air quality
  • 6.2 Water quality
  • 6.3 Steam quality
  • 6.4 Purge Media Quality
  • 6.5 Interfaces and common equipment connection points
  • 6.6 Gas turbine layout under field conditions
  • 7 Environmental emissions
  • 7.1 Overview
  • 7.2 Design principles to prevent accidental fluid leakage
  • 7.3 Noise
  • 7.3.1 Overview
  • 7.3.2 Noise measurement and prediction methods
  • 7.3.3 Noise level inside the gas turbine casing
  • 7.4 Flue gas emissions
  • 7.4.1 Overview
  • 7.4.2 Obligations
  • 7.4.3 Emission report
  • 7.4.4 Starting emissions
  • 7.5 Flue gas treatment
  • 7.6 Exhaust gas monitoring
  • 7.7 Water, steam and other emissions
  • 7.8 Visible smoke plume
  • 8 Contracted fuel
  • 8.1 Overview
  • 8.2 Types (gas, liquid and combined fuels)
  • 8.3 Fuel composition
  • 8.4 Fuel supply requirements
  • 8.5 Alternative Fuels
  • 9 Fuel systems and fuel handling
  • 9.1 General requirements
  • 9.2 Gas fuel supply
  • 9.3 Liquid Fuel Supply
  • 9.4 Fuel filter/separator
  • 9.4.1 Gaseous Fuel
  • 9.4.2 Liquid Fuels
  • 9.5 Preheating requirements for gaseous fuel dew point control
  • 9.6 Preheat Requirements for Liquid Fuel Pour Point Control
  • 9.7 Change Fuel-Multi-Fuel Operation Capability
  • 9.8 Blended Fuels
  • 9.9 Ignition Fuel
  • 9.10 Starting Fuel, Main Fuel, and Fuel Switching
  • 9.11 Water and steam injection systems
  • 9.12 Purge, release, and blowdown of fuels
  • 9.13 Fuel metering
  • 9.14 Fuel System Piping and Vessel Design
  • 9.14.1 Overview
  • 9.14.2 Fuel pipes, fittings and flanges
  • 9.14.3 Hose
  • 10 Regulations, codes and standards
  • 10.1 General requirements
  • 10.2 Design specifications and standards
  • 10.3 Verification
  • 11 Operating requirements
  • 11.1 General requirements
  • 11.2 Operating range and limits
  • 11.3 Start (start time, number of starts, start limit)
  • 11.4 Load/Unload
  • 11.5 Grid Operation Requirements
  • 11.6 Frequency Response
  • 11.7 Arrangement of Control System Human Machine Interface (HMI)
  • 11.8 Running Files
  • 11.9 Crysis and Black Start
  • 11.10 Black Start and Black Grid Recovery
  • 12 Quality
  • 12.1 Quality Management System
  • 12.1.1 Overview
  • 12.1.2 Project Quality Manager
  • 12.1.3 Project Quality Plan
  • 12.1.4 Quality Control Plan
  • 12.1.5 Inspection and test plan
  • 12.2 Quality monitoring and approval
  • 12.2.1 Quality Monitoring of Secondary Suppliers and Supply Chains
  • 12.2.2 Buyer Quality Supervision
  • 12.2.3 Equipment Compliance Approval
  • 12.2.4 Quality Control Records
  • 12.2.5 Control of Nonconforming Products and Services
  • 12.2.6 Concession Acceptance
  • 12.2.7 Project Design Review
  • 13 Reliability, availability, and maintainability (RAM)
  • 13.1 Basic Assessments
  • 13.1.1 Overview
  • 13.1.2 Reliability
  • 13.1.3 Starting reliability
  • 13.1.4 Availability
  • 13.1.5 Serviceability
  • 13.1.6 Spare parts
  • 13.1.7 Running Logs
  • 13.2 Additional reliability, availability, and maintainability requirements
  • 13.2.1 General requirements
  • 13.2.2 Forced outage coefficient and equivalent forced outage coefficient
  • 13.2.3 Equivalent Available Coefficients
  • 13.2.4 Equivalent operating hours
  • 14 Safety requirements
  • 14.1 Overview
  • 14.2 Risk Assessment
  • 14.3 Fire Protection
  • 14.3.1 Overview
  • 14.3.2 Enclosure fire protection
  • 14.3.3 Fire Protection in Gas Turbine Buildings
  • 14.4 Classification of hazardous areas and explosion protection
  • 14.5 Combustible Gas Detection
  • 14.6 Temperature Detectors
  • 14.7 Smoke Detectors
  • 14.8 Entry into Confined Spaces
  • 14.9 Inclusion
  • 14.10 Hydraulic Safety Equipment
  • 14.11 Fuel System Pressure Tests
  • 14.12 Clutch
  • 14.13 Functional Safety
  • 14.14 Hazardous Substances
  • 14.15 Overspeed Protection System Test
  • 14.16 Manual Isolation Function
  • 14.17 Hazard Identification and Operability Studies
  • 15 Measurement, language, identification and standardization
  • 15.1 Units of measurement
  • 15.2 Language
  • 15.2.1 Overview
  • 15.2.2 Communication Language
  • 15.2.3 File Languages
  • 15.2.4 Language of the Human Machine Interface (HMI) Display Screen
  • 15.2.5 Language of signs and symbols
  • 15.3 Equipment identification systems, nameplates and labels
  • 15.4 Standardization and Interchangeability
  • 16 Anti-corrosion, spraying and finishing
  • 16.1 General requirements
  • 16.2 Paint and Coatings
  • 16.2.1 Overview
  • 16.2.2 Types of Exposure
  • 16.2.3 Visual Evaluation of Surface Processes
  • 16.2.4 Surface treatment
  • 16.2.5 Workflow
  • 16.2.6 Coatings
  • 16.2.7 Galvanized Coating
  • 16.2.8 Inspections and Tests
  • 16.3 Electrochemical Effects
  • 17 Packaging and Transportation
  • 17.1 Preparation
  • 17.2 Packaging
  • 17.3 Transport
  • 18 Gas turbine body
  • 18.1 Design Requirements
  • 18.1.1 Lifetime (operating hours and weighted operating hours, start, cycle)
  • 18.1.2 Torque Limiting Device
  • 18.1.3 Radial and Axial Clearance Control
  • 18.1.4 Compressors
  • 18.1.5 Turbines
  • 18.1.6 Combustion chambers
  • 18.1.7 Cylinders
  • 18.1.8 Rotor
  • 18.1.9 Corrosion protection of the rotor at rest
  • 18.1.10 Rotor overspeed capability
  • 18.1.11 Rotor Dynamics
  • 18.2 Allowable Vibration Limits
  • 18.2.1 Overview
  • 18.2.2 Measurement of rotating parts
  • 18.2.3 Measurement of non-rotating parts
  • 18.3 Dynamic Balance
  • 18.3.1 Balance Surfaces
  • 18.3.2 Overview
  • 18.3.3 Low Speed Dynamic Balance
  • 18.3.4 High-speed dynamic balance
  • 18.4 Bearings and housings
  • 18.5 Thermal Cycle Optimization
  • 18.5.1 Overview
  • 18.5.2 External air coolers and direct steam cooling systems
  • 19 Gearboxes and couplings
  • 19.1 Load Gearbox
  • 19.2 Auxiliary Gear Box
  • 19.3 Balance and Vibration
  • 19.4 Main Drive Couplings
  • 19.4.1 Overview
  • 19.4.2 Main drive flexible coupling (speed does not exceed 4000r/min)
  • 19.4.3 Main drive flexible coupling (speed over 4000r/min)
  • 19.4.4 Sleeve Shaft Main Drive Flexible Coupling
  • 19.4.5 Rigid Couplings
  • 19.4.6 Over-torque protection
  • 19.4.7 Coupling Guards
  • 20 Air intake system
  • 20.1 Overview
  • 20.2 Air Filters
  • 20.3 Intake filter chambers
  • 20.4 Water removal systems
  • 20.5 Air Intake Cooling System
  • 20.6 Intake and Silencers
  • 20.7 Intake, muffler or baffle resonance
  • 20.8 Materials (Fasteners and Seals)
  • 20.9 Isolation Baffles and Rollers
  • 20.10 Anti-Icing System
  • 20.10.1 Overview
  • 20.10.2 Compressor Extraction Anti-Icing Heating (Static Filter)
  • 20.10.3 Infrared heating (static filter)
  • 20.10.4 Coiled steam or hot water heating
  • 20.10.5 Resistance heating
  • 20.10.6 Pulse Self-Cleaning Filter
  • 20.10.7 Intake heating fire protection and access restrictions
  • 21 Exhaust system
  • 21.1 Overview
  • 21.2 Interfaces between gas turbines and exhaust systems
  • 21.3 Design Requirements
  • 21.4 Mechanical Requirements
  • 21.5 Insulation
  • 21.6 Noise and Silencers
  • 21.7 Safety Requirements
  • 21.8 Bypass Baffle
  • 21.9 Exhaust Chimneys
  • 22 Civil Engineering and Foundation
  • 22.1 Overview
  • 22.2 Design Basis
  • 22.2.1 Overview
  • 22.2.2 Allowable bearing capacity of foundations
  • 22.2.3 Foundations, settlements and slopes
  • 22.2.4 Baseline Leveling
  • 23 Generator design interface requirements
  • 23.1 Electrical Torque Torque
  • 23.2 Matching generators and gas turbines
  • 23.3 Generator Overspeed
  • 23.4 Starting Devices
  • 24 Waste heat boiler interface
  • 25 Combined Cycle Applications
  • 25.1 Overview
  • 25.2 Gas Turbines for Combined Cycles
  • 25.3 Restrictions on Single-Cycle Arrangement Combined Cycle Start
  • 25.3.1 Overview
  • 25.3.2 Single shaft unit --- with clutch
  • 25.3.3 Single shaft unit --- without clutch
  • 26 I & C system requirements
  • 26.1 Controls
  • 26.1.1 General requirements
  • 26.1.2 Architecture
  • 26.1.3 Human Machine Interface (HMI)
  • 26.1.4 Alarms and Notifications
  • 26.1.5 Start
  • 26.1.6 Sequence Control
  • 26.1.7 Speed and Limits
  • 26.1.8 Load Reduction and Shutdown
  • 26.1.9 Automation
  • 26.2 Instruments and related equipment
  • 26.2.1 Overview
  • 26.2.2 Applicability and Diagnostics
  • 26.2.3 Control Equipment and Instruments
  • 26.2.4 Measuring Device
  • 26.2.5 Solenoid Valves
  • 26.2.6 Vibration and Axial Displacement Monitoring
  • 26.2.7 Actuators
  • 26.2.8 Heat tracing
  • 26.3 Wiring and Control Panel Installation
  • 26.3.1 Overview
  • 26.3.2 Cable Routing
  • 26.4 Electrical Instruments and Equipment
  • 26.4.1 Overview
  • 26.4.2 Power and other services
  • 26.4.3 Spare Terminal
  • 26.5 Power
  • 26.5.1 Overview
  • 26.5.2 Power Supply Capacity
  • 26.5.3 Intrinsically Safe Power Sources
  • 26.5.4 Battery System
  • 26.5.5 Uninterruptible Power Supply (UPS) System
  • 26.6 Protection of electrical/electronic equipment
  • 26.6.1 Discharge and Surge Protection
  • 26.6.2 Electrostatic Discharge (ESD)
  • 26.6.3 Electromagnetic Compatibility (EMC)
  • 26.6.4 Arc Welding
  • 26.6.5 Ground
  • 26.7 Equipment Protection
  • 26.7.1 Overview
  • 26.7.2 Protection System
  • 26.7.3 Lubrication System
  • 26.7.4 Fuel System
  • 26.8 Fire Protection Measures
  • 26.8.1 Overview
  • 26.8.2 Fire Detection
  • 26.8.3 Cover fire protection
  • 26.8.4 Combustible Gas Detection
  • 26.8.5 Smoke Detection
  • 26.9 Emissions
  • 26.9.1 Overview
  • 26.9.2 Emissions monitoring
  • 26.9.3 Periodic Sampling
  • 26.10 Hazardous Areas and Certified Equipment
  • 26.11 Instrumentation --- Maintenance and Spare Parts
  • 26.11.1 Overview
  • 26.11.2 Device Channels
  • 26.12 Data Communication
  • 26.12.1 Overview
  • 26.12.2 Data Acquisition and Storage Systems
  • 26.13 Instrument Control
  • 27 Electrical system
  • 27.1 General Requirements
  • 27.2 Design, Placement, and Redundancy
  • 27.3 Earth and lightning protection, equipotential bonding
  • 27.4 Low-Voltage Power Requirements
  • 27.5 Low-voltage switchgear and control equipment
  • 27.6 DC Power Distribution
  • 27.7 Batteries (including battery charging systems-AC-DC converters)
  • 27.8 Control System Power
  • 27.9 Wires, cables, and wiring methods
  • 27.10 Wires, Cables, and Connections Outside the Cabinet
  • 27.11 Cabinet Wiring
  • 27.12 Motor
  • 27.13 Terminal boxes and cabinets
  • 27.14 Protection against electric shock
  • 27.15 Heat tracing
  • 27.16 Grid Standards
  • 28 Maintenance requirements
  • 28.1 Overview
  • 28.2 Maintenance Concepts
  • 28.3 Maintenance plan (in-situ or factory)
  • 28.4 Maintenance Plan (Regular Maintenance, Periodic Inspection)
  • 28.5 Parts Repair and Replacement
  • 28.5.1 Repairs
  • 28.5.2 Life Components
  • 28.6 Tools
  • 28.7 Spare parts
  • 28.7.1 Overview
  • 28.7.2 Strategic Spare Parts
  • 28.8 Training
  • 28.9 Downtime Maintenance
  • 28.9.1 Scheduled Maintenance
  • 28.9.2 Performance degradation after maintenance
  • 28.9.3 Maintenance Scope and Planning
  • 28.10 Maintaining Files
  • 29 Housing
  • 29.1 Overview
  • 29.2 Structures
  • 29.2.1 Overview
  • 29.2.2 Shell Weatherability
  • 29.2.3 Sound insulation and insulation
  • 29.2.4 Ventilation explosion-proof
  • 29.2.5 Internal heating
  • 29.2.6 Lighting
  • 29.2.7 Housing Meter
  • 29.2.8 Floor
  • 29.2.9 Design of personnel entrance (including access door)
  • 29.3 Entrance and Exit
  • 29.3.1 Overview
  • 29.3.2 Hood Top Channel
  • 29.4 In-cabin Maintenance
  • 29.4.1 Overview
  • 29.4.2 Housing Removal and Maintenance
  • 29.5 Platforms and Channels
  • 29.6 Mechanical Handling and Lifting
  • 29.6.1 Overview
  • 29.6.2 Mobile Cranes
  • 29.6.3 Stationary Cranes
  • 29.7 Stacking and Storage
  • 29.8 Enclosure Fire Protection
  • 30 Auxiliary equipment
  • 30.1 Turning gear
  • 30.1.1 Overview
  • 30.1.2 Gas Turbine Turning System
  • 30.1.3 Requirements for Safe Operation
  • 30.2 Starting Systems
  • 30.2.1 Type
  • 30.2.2 General Design Requirements
  • 30.2.3 Starting System Power
  • 30.2.4 Start Limits
  • 30.3 Lubricant Systems
  • 30.3.1 General requirements
  • 30.3.2 Design Requirements
  • 30.3.3 Fuel tanks and storage tanks
  • 30.3.4 Temperature Control and Heating
  • 30.3.5 Oil cooler
  • 30.3.6 Filters and Contaminants
  • 30.3.7 Lubricant Selection (Type and Quality)
  • 30.3.8 Synthetic Oil
  • 30.3.9 Minimum supervision requirements
  • 30.4 Compressor Washing System
  • 30.4.1 Overview
  • 30.4.2 Offline Washing System
  • 30.4.3 Online Washing System
  • 30.5 Cooler
  • 30.5.1 Interstage Cooling
  • 30.5.2 Coolers for cooling air
  • 30.5.3 Water Cooling Systems
  • 30.6 Pipe
  • 30.6.1 Piping Design Specifications
  • 30.6.2 General Requirements
  • 30.6.3 Testing and Certification
  • 30.6.4 Hydrostatic test
  • 30.6.5 Nondestructive Testing (NDE)
  • 30.6.6 Mechanical Requirements
  • 30.6.7 Connectors and Connections
  • 30.6.8 Corrugated metal hoses and hose assemblies
  • 30.6.9 Non-Metallic Hoses, Hose Assemblies, and Connections
  • 30.6.10 Flange connection
  • 30.6.11 Pipe Insulation
  • 30.6.12 Heat tracing
  • 30.6.13 Sewage
  • 30.6.14 Release
  • 30.6.15 Device Channel
  • 30.7 Pressure Equipment
  • 31 Condition monitoring
  • 31.1 Overview
  • 31.2 Vibration Monitoring Systems
  • 31.2.1 Introduction and Overview
  • 31.2.2 Online Vibration Analysis System
  • 31.2.3 Offline Vibration Analysis System
  • 31.3 Data Collection and Trend Monitoring
  • 31.3.1 Overview
  • 31.3.2 Scope
  • 31.3.3 Data Collection
  • 31.3.4 Trend Monitoring System
  • 32 Installation and commissioning
  • 32.1 Installation
  • 32.2 Commissioning
  • 33 Verification test
  • 33.1 Scope
  • 33.2 Reliability Tests
  • 33.3 Performance Tests
  • 33.3.1 Overview
  • 33.3.2 Test procedure
  • 33.3.3 Measurement Uncertainty
  • 33.3.4 Tolerance
  • 33.3.5 Correction Curves
  • 33.3.6 Performance Aging
  • 33.3.7 TITISO value
  • 33.4 Noise Test
  • 33.5 Emission Tests
  • 34 Design Life
  • 35 Technical information and documents
  • 35.1 Overview
  • 35.2 Instructions for use
  • 35.2.1 Overview
  • 35.2.2 File Formats
  • 35.3 File Submission Times and Responsibilities
  • 35.4 General Documents
  • Appendix A (Normative) Data Sheet Requirements and Options
  • A.1 Overview
  • A.2 Information Data Sheet
  • A.3 Option Data Sheet
  • A.4 Instrument data sheet
  • A.5 File Data Sheet
  • Appendix NA (informative appendix) Chinese documents with corresponding correspondence with the international documents referenced normatively in this standard
  • Appendix NB (Informative) Data Sheet
  • References

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard uses the translation method equivalent to ISO 19859:2016 "Requirements for Gas Turbine Applications for Power Generation Equipment".

Chinese documents that have a corresponding correspondence with the international documents referenced normatively in this standard are shown in Appendix NA.

For ease of use, the following editorial changes have been made to this standard.

--- Errata the English name of the original standard normative reference document IEC 60079-11;

--- Erratum to formula (1) in the original standard 13.1.2;

--- Correction of formula (8) in the original standard 13.2.2;

--- Correction of formula (10), formula (11), formula (12) in the original standard 13.2.3;

--- MMI errata in the instrument data sheet as HMI;

--- Added informative appendix NA.

--- Combine the original standard data sheet into this standard as an informative appendix NB.

Introduction

This standard is used to purchase gas turbines and auxiliary systems for power generation, and to provide technical support.

This standard provides basic specifications for tendering, which are applicable to different environmental and safety requirements, and also regulates the conditions for meeting the requirements.

This standard gives basic information for buyers and sellers, such as fuel and other matters. This standard does not cover all of the gas turbine procurement contracts Information, but should include necessary installation information. Especially in the case where the responsibilities of the buyer and the seller can be distinguished, this standard is a technical agreement between the buyer and the seller.

The manufacturer has given attention to ensure the applicability of the equipment provided.

Due to the different actual operation modes of gas turbines, the performance under the corresponding "standard" operating conditions is also different. Performance in this standard is based on Environmental reference conditions under ISO standards.

1 Scope

This standard specifies the minimum technical and data requirements for the evaluation and procurement of gas turbines for power generation.

This standard applies to land and sea simple cycle and combined cycle gas turbines, as well as cogeneration gas turbines (see ISO 11086:1996, Appendix B). The test for gas turbine generator sets is also applicable.

This standard does not apply to all gas turbines as power propulsion, including aviation aircraft, mobile barges, floating ships and ship propulsion. Into the gas turbines and micro gas turbines used.

This standard specifies the requirements for gas turbine generator sets based on the existing ISO, IEC standards and actual conditions. But does not exclude industry With other regulations and standards, some of them are also included in this standard. As long as the use requirements, functional design and security meet the needs of the buyer and the seller Requirements to allow the use of other similar regulations and standards documented.

Attention should be paid to applying or using standards in the following order. international standards; regional standards; national standards; local standards.

This standard specifies requirements for buyers and sellers when designing and purchasing gas turbine generator sets.

The scope of supply of a gas turbine generator set, unless it is indicated that it is not included in the scope of supply, includes at least the following equipment and related options (See 3.14), the list is as follows.

--- Gas turbine unit;

--- load couplings and clutches, if applicable;

--- Intake system;

--- Exhaust system;

--- Fuel equipment;

---controlling device;

---Electrical Equipment;

--- Auxiliary systems, including starting, lubricating oil, cranking, water washing, interconnected pipes and sewage drainage systems;

--- Fire and flammable gas detection systems;

--- Cooling water equipment.

Considering the integrity of the gas turbine unit, the interfaces of the equipment, utilities and gas turbine units and their design requirements should also be included.

The following equipment is not included in the scope of supply, but can be used for interface and performance testing.

--- Generator and its auxiliary system, without control module;

--- Steam turbines and their auxiliary systems;

--- External equipment for gas turbine units.

The data sheet in Appendix A of this standard determines the requirements and information of the buyer and the seller.

The buyer completes the data form in the bidding documents and forwards it to the supplier. Suppliers need to respond to data sheets when bidding.

Appendix A identifies the different types of data sheets and how they are used.

If the supplier fails to meet the requirements specified in this standard, the referenced standard terms and differences and their alternatives need to be listed in the document.

If the supplier cannot provide the procedures and operation, maintenance and commissioning information or equipment required by this standard due to patent confidentiality, the supplier shall list Out, and prepare personnel and equipment to undertake the resulting tasks.

The mark "·" at the beginning of this paragraph indicates optional items (see A.3).

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 162 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 38179-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
162 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 38179-2019

$2,370.00