Valid

GB/T 37961-2019Information technology service—Basic requirements for service (English PDF)

信息技术服务 服务基本要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (34 pages)

Need quotation for your management?

Get a formal quotation for GB/T 37961-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 30, 2019

Implementation date

March 1, 2020

Scope

GB/T 37961-2019 is the English-translated version of 信息技术服务 服务基本要求.

GB/T 37961-2019 is the Chinese standard "Information technology service—Basic requirements for service".

Its scope clause reads: This standard specifies information technology consulting, design and development, information system integration implementation, operation and maintenance, data processing and storage, operation, etc. The basic requirements of the service.

This standard applies to information technology service providers that provide services in related fields to establish specific specifications for the services that can be provided to And to provide a reference for both the supplier and the buyer to draft a service contract for a specific service or service combination.

Its clauses include terms and definitions; abbreviations; general requirements for service process; information technology consulting services; design and development services; information system integration implementation service.

Found what you need?

Document preview — GB/T 37961-2019

National Standard of the People's Republic of China

ICS
35.080
Classification
L 77

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope1
  • 2 Normative references1
  • 3 Terms and definitions1
  • 4 Abbreviations1
  • 5 General requirements for service process2
  • 6 Information Technology Consulting Services2
  • 6.1 Overview2
  • 6.2 Information planning2
  • 6.3 Information System Design3
  • 6.4 Information Technology Management Consulting4
  • 6.5 Information System Engineering Supervision4
  • 6.6 Test evaluation certification5
  • 6.7 Information Technology Training6
  • 7 Design and development services7
  • 7.1 Overview7
  • 7.2 Hardware Design7
  • 7.3 Software design and development8
  • 8 Information system integration implementation service9
  • 8.1 Overview9
  • 8.2 Implementation of basic environment integration9
  • 8.3 Hardware integration implementation10
  • 8.4 Software integration implementation10
  • 8.5 Security Integration Implementation11
  • 8.6 System integration implementation management12
  • 9 Operation and maintenance services12
  • 9.1 Overview12
  • 9.2 Basic environment operation and maintenance13
  • 9.3 Hardware Operation and Maintenance13
  • 9.4 Software Operation and Maintenance14
  • 9.5 Security Operation and Maintenance14
  • 9.6 Operation and maintenance management15
  • 10 Data processing and storage services16
  • 10.1 Overview16
  • 10.2 Data processing and processing16
  • 10.3 Data storage17
  • 11 Operation Service17
  • Appendix A (informative appendix) Example of the directory structure of the technical part of the service contract19

1 Scope

This standard specifies information technology consulting, design and development, information system integration implementation, operation and maintenance, data processing and storage, operation, etc.

The basic requirements of the service.

This standard applies to information technology service providers that provide services in related fields to establish specific specifications for the services that can be provided to

And to provide a reference for both the supplier and the buyer to draft a service contract for a specific service or service combination.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article

Pieces. For undated references, the latest version (including all amendments) applies to this document.

GB/T 29264-2012 Information Technology Service Classification and Code

3 Terms and definitions

The following terms and definitions defined in GB/T 29264-2012 apply to this document.

3.1 Service

A way for the supplier to deliver value to the demander in order to achieve the desired result of the demander.

3.2 Information Technology Service

A series of service processes provided by the supplier in accordance with the demand for the development and application of information technology and the results produced by the process.

3.3 Results

Activity deliverables or final deliverables in the service delivery process.

3.4 supplier

Organizations or individuals that provide information technology services.

3.5 Demand side

Organizations or individuals that need information technology services.

3.6 Owner unit

Units that have the qualifications of the main body of the information system engineering (including operation and maintenance) contract and the ability to pay for the engineering and related services.

4 Abbreviations

The following abbreviations apply to this document.

5 General requirements for service process

The general requirements of the service process should include at least.

a) Scope confirmation, the supplier should communicate with the demander in advance to confirm the scope and content of the service before launching information technology services;

b) Service preparation, the supplier and the demander jointly discuss and analyze service requirements, and confirm service goals and service standards;

c) Plan formulation, the supplier should conduct current research and feasibility analysis based on the demand of the demander, formulate a suitable service implementation plan, and confirm with the demander;

d) When the service contract is signed, the content of the service contract should clarify the rights and obligations of the supplier and the buyer, and it should include business content and technical content;

Note 1.See Appendix A for an example of the catalog structure of the technical part of the service contract e) Service implementation, the supplier performs the service contract, and monitors the problems in the implementation of the service project, and promotes the service project based on continuous communication with the demander;

f) Result feedback, the supplier feedbacks the service result to the buyer, accepts the buyer's review and assists the buyer in the handover of the service or communicates further cooperation matters;

g) Service settlement, according to the provisions of the service contract and the actual implementation and completion of the project, carry out the financial settlement of the project.

Note 2.The general requirements of the service process are the common requirements that all services should follow. On this basis, each service follows their specific requirements.

6 Information Technology Consulting Services

6.1 Overview

This chapter focuses on information planning, information system design, information technology management consulting, information system engineering supervision, testing, evaluation and certification, information

Technical training and other services are required.

6.2 Information planning

Information planning services mainly cover business system architecture analysis, business process analysis and optimization, business management optimization design, information architecture

The process of blueprint design, informatization investment estimation, formulation of informatization planning and related results. Specific requirements are as follows.

a) Business system architecture analysis and its results should at least include.

1) Activities. Analysis of the demand-side development strategy and definition of business capabilities;

Results. Business capability analysis report.

2) Activities. the development of the demand-side's information capabilities;

Achievement. Analysis report of informatization capability.

3) Activities. determination of informatization goals;

Achievement. Informatization target report.

b) Business process analysis and optimization and its results shall at least include.

Activities. Organizational business process analysis, risk and efficiency assessment;

Results. Business process optimization program.

c) Business management optimization design and its results should at least include.

Activities. Analyze the suitability and compliance assessment of business management;

Results. Business management optimization plan.

d) The blueprint design of the information architecture and its results should at least include.

Activity. Application system component architecture definition;

Achievement. technical architecture program.

e) Informatization investment estimation and its results should at least include.

Activity. Analysis of the benefits of information investment;

Outcome. Informatization investment budget report.

f) The formulation of an informatization plan and its results should at least include.

Activities. overall planning of informatization;

Achievement. Informatization planning program.

6.3 Information system design

6.4 Information Technology Management Consulting

Information technology management consulting services mainly cover management concept introduction, gap analysis, consulting program design, implementation and operation, evaluation and improvement

And other processes and related results. Specific requirements are as follows.

a) The introduction of management concepts and their results shall at least include.

1) Activities. management concept training;

Results. training materials and related records.

2) Activity. Conduct management status interviews with stakeholders;

Results. Interview plan and interview records.

b) The gap analysis and its results should include at least.

1) Activities. survey of current situation;

Achievements. research records and research reports.

2) Activity. problem diagnosis;

Outcome. Problem diagnosis report.

c) The consulting plan design and its results should at least include.

Activities. Analysis and design of consulting solutions;

Results. Consulting solutions.

d) Implementation and operation and their results shall at least include.

1) Activities. Management process and organizational structure optimization and implementation guidance;

Achievement. Optimization plan.

2) Activities. Guidance on the standardization and institutionalization of management processes and organizational structures;

Results. Management system and process design plan.

e) Evaluation and improvement and their results shall at least include.

1) Activities. Evaluation, diagnosis and analysis of the achievement of the consultation goals;

Results. Evaluation and diagnosis, analysis report.

2) Activities. the results and effects of consulting services are improved;

Results. Improved reports.

6.5 Information system engineering supervision

Information system engineering supervision services mainly cover supervision preparation, supervision planning preparation, supervision implementation and operation, supervision work transfer and summary, etc.

Process and related results. Specific requirements are as follows.

a) Supervision preparation and its results shall at least include.

1) Activities. the determination of the chief supervision engineer and the supervision organization;

Achievements. Supervision personnel, supervision organization structure and responsibility and authority scheme.

2) Activities. the basic situation of the owner unit, the contractor and the familiarity and understanding of the content of the contract;

Results. Supervision files.

b) The preparation of supervision planning and its results shall include at least.

1) Process. overall planning of supervision work;

Achievement. Supervision planning plan.

2) Process. detailed planning for the implementation of professional field supervision;

Achievement. Supervision and implementation details plan.

c) Supervision implementation and operation and its results shall at least include.

1) Activities. Witness the legitimacy and compliance of the bidding process of informatization projects;

Achievement. Bidding supervision report.

2) Activity. review of the implementation plan of the informatization project;

Achievement. Implementation plan supervision opinion report.

3) Activities. supervision and review of the implementation process of informatization projects;

Achievement. Implementation process supervision opinion report.

4) Activities. supervision and review of project payment;

Achievements. reporting procedures and supervision opinions report.

5) Activity. Review of the acceptance plan of the information technology project;

Achievement. Supervisory opinion report of the acceptance plan.

6) Activities. review of acceptance conditions of informatization projects and acceptance assistance;

Achievements. Acceptance of supervision records and supervision opinion reports.

7) Activities. assistance in bidding supervision for information operation and maintenance projects;

Achievement. O&M bidding supervision opinion report.

8) Activity. Supervision and review of the implementation of information operation and maintenance project supervision;

Results. Operation and maintenance supervision report.

9) Activity. Evaluation and confirmation of the implementation effect of information operation and maintenance projects;

Results. Evaluation report and supervision report.

d) The transfer and summary of supervision work and its results shall at least include.

1) Activity. Submit the supervision file information to the owner unit;

Achievements. change materials, supervision guidance documents, supervision activity record documents.

2) Activity. Summary of supervision work;

Outcome. Summary report.

6.6 Test evaluation certification

Testing, evaluation and certification services mainly cover the needs analysis, planning and design, implementation and other processes and related results. Specific requirements are as follows.

a) Testing service

1) The test requirement analysis and its results should at least include.

Activities. analysis and preparation of test content, test standards, methods, tools, equipment, and use cases;

Outcome. Test requirement analysis report.

2) Test planning and design and its results should at least include.

Activities. determination of test objectives, test methods, test progress, and personnel capabilities;

Outcome. Test plan.

3) Test implementation and its results should at least include.

Activities. product or system function and performance testing;

Results. Test report.

b) Evaluation service

1) The assessment needs analysis and its results should at least include.

Activities. determination and analysis of evaluation scope, evaluation type, and evaluation time;

Outcome. Evaluation needs analysis report.

2) Evaluation planning and design and its results should at least include.

Activities. determination of evaluation goals, evaluation methods, evaluation progress, and appraisers' capabilities;

Outcome. Evaluation plan.

3) Evaluation implementation and its results should at least include.

Activities. document review and on-site evaluation;

Outcome. Evaluation report.

c) Certification service

1) The certification requirements analysis and its results shall at least include.

Activities. determination and analysis of certification scope, certification type, and certification time;

Outcome. Certification demand analysis report.

2) Certification planning and design and its results shall at least include.

Activities. determination of certification goals, certification methods, certification progress, and certifier capabilities;

Results. Certification scheme.

3) Certification implementation and its results shall include at least.

Activities. document review and on-site certification;

Achievement. certification report, certification certificate.

6.7 Information Technology Training

Information technology training services mainly cover the processes and related results of demand determination, training development, training implementation, and training effect evaluation.

Specific requirements are as follows.

a) The determination of needs and its results shall at least include.

Process. survey and analysis of training needs;

Results. Demand analysis report.

b) Course development and its results should at least include.

Process. Confirmation of course theme, course content, teachers, teaching materials and reference materials;

Outcome. course plan.

c) The development of the training program and its results should at least include.

Process. training plan formulation;

Outcome. Training program.

d) The admission announcement and its results should at least include.

Process. release of enrollment information;

Results. Admissions Guide.

e) Training implementation and its results should at least include.

1) Activities. course teaching;

Achievements. courseware, course materials.

2) Activity. Evaluation of the learning achievement of the training object;

Results. Exam records.

3) Activities. issuance of training certificates;

Outcome. Training certificate.

f) The training effect evaluation and its results should at least include.

1) Activities. training quality monitoring;

Outcome. Satisfaction survey report.

2) Activities. overall evaluation of the training process;

Outcome. Evaluation report.

7 Design and development services

7.1 Overview

This chapter puts forward requirements for services such as hardware design, software design and development.

7.2 Hardware design

Hardware design services mainly cover requirements analysis, feasibility analysis, program demonstration, detailed design, test verification and other processes and related costs.

fruit. Specific requirements are as follows.

a) The needs analysis and its results should at least include.

1) Activities. communication and collection of technical requirements;

Achievement. technical agreement, technical requirement report.

2) Activity. needs review;

Achievements. review records, issue tracking verification records.

b) The feasibility analysis and its results should at least include.

Activities. feasibility research;

Results. Feasibility analysis report or project demonstration report.

c) The project demonstration and its results should at least include.

1) Activities. design of technical solutions;

Results. technical solutions.

2) Activity. analysis of the design plan;

Outcome. Design plan.

3) Activity. plan review;

Achievements. review records, issue tracking verification records.

d) The detailed design and its results shall at least include.

1) Activities. internal and external interface design;

Outcome. System specification program.

2) Activities. logic design, application design, electrical design, structural design, embedded software design, etc., integrated circuit design should also

Including system-level design, front-end design, back-end design, packaging design, etc.;

Achievements. schematic diagram, structure diagram, PCB design diagram.

3) Activities. product functional performance design;

Results. Technical report, user manual.

4) Activities. process design;

Achievements. process documents, production drawings.

5) Activity. determination of product acceptance criteria;

Achievements. product specifications, ATE test specifications, sample test specifications, compliance test specifications, software test specifications.

e) Test verification and its results shall at least include.

1) Activity. design verification;

Outcome. verification calculation or verification review report.

2) Activity. test verification;

Results. Test report.

3) Activities. acceptance of design results;

Achievements. scientific calculation and simulation report; reliability, maintainability, supportability, safety report; new technology, new equipment, new

Process report; environmental test report; acceptance report; verification report at each design stage of integrated circuit.

7.3 Software design and development

Software design and development services mainly cover software requirements analysis, software design, software development, software item integration, software testing, software installation

The process of installation, software acceptance support and other related results. Specific requirements are as follows.

a) Software requirements analysis and its results shall at least include.

1) Activities. software functional requirements, external interfaces, non-functional requirements analysis;

Results. Software requirement analysis report, software requirement priority management table.

2) Activities. establishment and change of software requirements baseline;

Results. Software requirements baseline report.

b) The software design and its results shall at least include.

1) Activities. software architecture design and baseline establishment;

Results. software architecture design report, software architecture design baseline report.

2) Activities. design of internal and external interfaces of software components;

Outcome. Software component design report.

3) Activities. detailed design of software functions;

Achievement. Detailed design report of software functions.

c) Software development and its results shall at least include.

1) Activity. software unit code development;

Results. software code.

2) Activities. verification of software units;

Results. Unit test cases, unit test reports.

d) Software item integration and its results shall at least include.

1) Activity. Development of software item integration strategy;

Achievement. Software item integration scheme.

2) Activity. development of verification criteria for software items;

Results. Software item integration test cases.

3) Activities. software item integration;

Achievement. software item integrated components.

4) Activity. software item integration test;

Results. Software item integration test report.

e) Software testing and its results shall include at least.

1) Activity. test plan formulation;

Outcome. Test plan.

2) Activity. test case design;

Outcome. Test case.

3) Activity. Preparation of test environment;

Outcome. Test environment.

4) Activity. test implementation;

Results. Test report.

f) The software installation and its results shall at least include.

1) Activities. software installation strategy and standard formulation;

Results. Software installation program.

2) Activity. software installation;

Results. Software product package.

3) Activity. Software installation evaluation;

Achievement. Software installation test evaluation report.

g) Software acceptance support and its results shall at least include.

1) Activities. software product acceptance review and test support;

Achievement. software acceptance report, test report.

2) Activities. software product training;

Results. training materials, training records.

8 Information system integration implementation service

8.1 Overview

This chapter focuses on services such as basic environment integration implementation, hardware integration implementation, software integration implementation, security integration implementation, and system integration implementation management.

Service requests.

8.2 Basic environment integration implementation

Basic environment integration implementation services mainly cover requirements analysis, planning and design, integration deployment, testing/online acceptance and other processes and related costs.

fruit. Specific requirements are as follows.

a) The needs analysis and its results should at least include.

1) Activi...

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 34 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 37961-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
34 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 37961-2019

$510.00