GB/T 37400.7-2019Heavy machinery general technical specification - Part 7: Repair welding for steel castings (English PDF)
重型机械通用技术条件 第7部分:铸钢件补焊
Open the GB/T 37400.7-2019 preview as PDF
This is a limited preview
Buy now to download the full PDF (13 pages)
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
August 30, 2019
Implementation date
March 1, 2020
Scope
GB/T 37400.7-2019 is the English-translated version of 重型机械通用技术条件 第7部分:铸钢件补焊.
Part 7 of China's general technical specification for heavy machinery, covering repair welding of steel castings. It specifies the range of defects that may be repair welded, the pre-weld preparation, the repair welding technical requirements and the post-weld stress relief. Almost every large steel casting is repair welded somewhere, and treating that as a normal part of manufacture rather than as a concealed failure is what this standard does. Solidification defects are inevitable in a section that takes days to freeze, and the ones that appear at the surface after machining are the ones that must be dealt with. The pre-weld preparation clause is the substance of it: the defect has to be excavated completely, which means going deeper than it looks and verifying by inspection that nothing remains, because a repair welded over a residual crack has buried it where nobody will find it again. Post-weld stress relief then follows, because the repair has put new stress into a component that had just had its old stress removed.
Document preview — GB/T 37400.7-2019
National Standard of the People's Republic of China
- ICS
- 77.140.80
- Classification
- J 31
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative references
- 3 Repair welding defect range
- 4 Pre-weld preparation technical requirements
- 4.1 Defect cleaning and groove form
Foreword
GB/T 37400 "General Technical Conditions for Heavy Machinery" is divided into 16 parts.
--- Part 1. Product inspection;
--- Part 2. Flame cutting parts;
---Part 3. Welded parts;
---Part 4. Cast iron parts;
---Part 5. Non-ferrous metal castings;
---Part 6. Steel castings;
---Part 7. Repair welding of steel castings;
---Part 8. Forgings;
---Part 9. Machining parts;
--- Part 10. Assembly;
--- Part 11. piping;
--- Part 12. Painting;
--- Part 13. Packaging;
1 Scope
Part 7 of China's general technical specification for heavy machinery, covering repair welding of steel castings. It specifies the range of defects that may be repair welded, the pre-weld preparation, the repair welding technical requirements and the post-weld stress relief. Almost every large steel casting is repair welded somewhere, and treating that as a normal part of manufacture rather than as a concealed failure is what this standard does. Solidification defects are inevitable in a section that takes days to freeze, and the ones that appear at the surface after machining are the ones that must be dealt with. The pre-weld preparation clause is the substance of it: the defect has to be excavated completely, which means going deeper than it looks and verifying by inspection that nothing remains, because a repair welded over a residual crack has buried it where nobody will find it again. Post-weld stress relief then follows, because the repair has put new stress into a component that had just had its old stress removed.
This part of GB/T 37400 stipulates the defect range of repair welding of steel castings, technical requirements for pre-weld preparation, technical requirements for repair welding, and after welding. Stress annealing treatment and inspection. This section applies to the repair welding of carbon steel, low alloy steel and high manganese steel casting steel parts before finishing.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 984 surfacing electrode
GB/T 5117 non-alloy steel and fine-grain steel electrode
GB/T 5118 heat-strength steel electrode
GB/T 5680 austenitic manganese steel casting
GB/T 6417.1 metal fusion welding head defect classification and description
GB/T 8110 carbon steel, low alloy steel welding wire for gas shielded arc welding
GB/T 10045 non-alloy steel and fine grain steel flux cored wire
GB/T 15169 steel fusion welding welder skill assessment
GB/T 17493 heat-strength steel flux cored wire
GB/T 37400.6 General technical requirements for heavy machinery - Part 6. Steel castings
JB/T 3223 Welding Material Quality Management Procedures
JB/T 6404 large high manganese steel casting technical conditions NB/T 47014 Pressure welding equipment welding process evaluation
3 Repair welding defect range
3.1 The scope of defects refers to defects that exceed the dimensional tolerances of the design drawings, exceed the allowable dimensions of the defects, and are not permitted.
3.2 Repairs that meet the following conditions shall not be repaired.
a) sand holes, slag inclusions and looseness that cannot be removed;
b) by machining, it can meet the technical requirements or allowable defects of the pattern;
c) defects found in the process of processing that cannot meet the requirements of the product after repair welding;
d) Defects other than repair welding are allowed after processing and the user does not agree with the defects of repair welding.
4.1 Defect cleaning and groove form
4.1.1 The defects shall be thoroughly removed before repair welding, and the groove surface shall be smooth and smooth, and no sharp corners shall be present.
4.1.2 According to the defects of steel castings, the defects in the repair welding area can be shovel, grinding, carbon arc gouging, gas cutting or machining.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 13 pages — is available in the English PDF.
Referenced standards
Normative references
GB/T 984 · GB/T 5117 · GB/T 5118 · GB/T 5680 · GB/T 6417.1 · GB/T 8110 · GB/T 10045 · GB/T 15169 · GB/T 17493 · JB/T 3223 · JB/T 6404
Cited by
- GB/T 45681-2025General technical specification for repair welding of steel castings
- GB/T 37400.1-2019Heavy machinery general technical specification - Part 1: Product inspection and testing
- GB/T 37400.16-2019Heavy machinery general technical specification - Part 16: Hydraulic systems
- GB/T 37400.6-2019Heavy machinery general technical specification - Part 6: Steel castings
How to Buy GB/T 37400.7-2019
- 1Add to cart. Click the "Buy GB/T 37400.7-2019" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 37400.6-2019 — Heavy machinery general technical specification - Part 6: Steel castings
GB/T 9841-2006 — Feed additive Vitamin B12 powder (cyanocobalamin cobione)
GB/T 9842-2018 — Specification for urea reactor
Secure payment via Stripe
Payments accepted
GB/T 37400.7-2019