GB/T 37365-2019Die casting unit—Performance testing method (English PDF)
压铸单元 性能检测方法
This is a limited preview
Buy now to download the full PDF (21 pages)
Need quotation for your management?
Get a formal quotation for GB/T 37365-2019 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 25, 2019
Implementation date
October 1, 2019
Scope
GB/T 37365-2019 is the English-translated version of 压铸单元 性能检测方法.
GB/T 37365-2019 is the Chinese standard "Die casting unit - Performance testing method". Its scope clause reads: This Standard specifies the performance testing method for die casting unit.
This Standard applies to the performance testing of the die casting unit of cold chamber die casting machine. This Standard does not apply to hot chamber die casting machines and other foundry equipment.
Its clauses include terms and definitions; testing methods. It was issued by the State Administration for Market Regulation on MARCH 25, 2019 and took effect on OCTOBER 01, 2019.
Found what you need?
Document preview — GB/T 37365-2019
National Standard of the People's Republic of China
- ICS
- 25.120.30
- Classification
- J 61
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Normative references4
- 3 Terms and definitions4
- 4 Testing methods5
- 4.1 General requirements5
- 4.2 Testing of dry running cycle time6
- 4.3 Noise testing7
- 4.4 Testing of electrical energy consumption7
- 4.5 Testing of measurement accuracy9
- 4.6 Testing of control accuracy9
- 4.7 Testing of repeatability accuracy10
- 4.8 Testing of capability machine index (CMK)11
- 4.9 Function and performance check of integrated control systems14
- Appendix A (Informative) Related tables for performance tests of die casting unit16
- Appendix B (Informative) Schematic diagram for the distribution of noise testing points of die casting unit21
1 Scope
This Standard specifies the performance testing method for die casting unit.
This Standard applies to the performance testing of the die casting unit of cold chamber die casting machine.
This Standard does not apply to hot chamber die casting machines and other foundry equipment.
2 Normative references
The following documents are indispensable for the application of this document.
For the dated references, only the editions with the dates indicated are applicable to this document. For the undated references, the latest edition (including all the amendments) are applicable to this document.
GB/T 3785.1-2010 Electroacoustics - Sound level meters - Part 1: Specifications
GB/T 9813.4-2017 General specification for computers - Part 4: Industrial application microcomputer
GB/T 15969.1-2007 Programmable controllers - Part 1: General information
GB/T 15969.2-2008 Programmable controllers - Part 2: Equipment requirements and tests
GB 20906 Safety requirements for high pressure metal diecasting units
GB/T 21269 Cold chamber die casting machines
JB/T 10894 Computer control systems for plastics injection moulding machines - General requirements
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 Dry running cycle time
machine;
b) The dimension shall be greater than or equal to 0.8b×0.8b (b is the inner dimension between the pull rods);
c) The thickness shall be set according to the minimum thickness of the die casting mold of GB/T 21269; and shall be the average of the sample thickness of die casting machine;
d) When the parallelism of the two planes matched with the die plate is less than 0.05 mm, it shall ensure that the strain, under the corresponding clamping force, is less than 30 µm/m.
4 Testing methods
4.2 Testing of dry running cycle time
4.2.1 Testing instrument
The testing tool is a stopwatch.
4.2.2 Testing conditions
The main equipment of die casting unit includes a die casting machine and auxiliary equipment, wherein the auxiliary equipment shall include: a pouring device, a pickup device, and a spraying device.
The main action flow of die casting unit includes closing the door, closing the mold, pouring, shot, opening the mold, opening the door, ejection, pushing back, pressing back, picking up, spraying. The parameter settings are shown in Table A.1.
4.2.3 Testing method
4.2.3.1 In the state of continuous operation under a fully-automatic mode and the operational data meeting the requirements of Table A.1, the test shall be carried out. The number of cycles of the die casting unit with a clamping force of less than 10000 kN is 50. The number of cycles of the die casting machine with a clamping force greater than or equal to 10000 kN is 30.
4.2.3.2 During the test, if an alarm occurs which causes the machine to stop, it shall be retested.
4.2.3.3 The average of the measured data is the dry running cycle time of die casting unit.
4.4 Testing of electrical energy consumption
4.4.2.4 It shall test the energy consumption generated by the following actions or components:
a) Main drive actions such as closing the door, closing the mold, pouring, shot, opening the mold, opening the door, ejection (no-load ejection), pushing back, pressing back, picking up (no-load pickup), spraying (no-blowing and no-paint spraying);
b) Electrical control device;
c) Internal maintenance unit (provided by the manufacturer), such as electrical component cooling system, lubrication system, hydraulic oil cooling system.
4.4.2.5 The hydraulic system has an oil temperature of 30 °C~55 °C.
4.4.2.6 The die casting machine does not select the shot piston tracking function.
4.4.3 Testing method
4.4.3.1 Confirm the integrity of the sample machine under test.
4.4.3.2 The three-phase power tester and the centralized power incoming line of die casting unit are reliably connected.
4.4.3.3 According to Table A.1, SET the parameters. COMPLETE the filling of the table.
4.4.3.4 When the die casting unit enters the state of continuous operation in the fully-automatic mode, after confirming that the heat balance is reached, the test is started.
4.4.3.5 The number of dry running cycles shall be in accordance with 4.2.3.1.
4.4.3.6 If any alarms cause a shutdown, retest is carried out.
4.4.4 Data acquisition
After the test is completed, on the human-machine interface of the three-phase power tester and the sample machine under test respectively, the following data shall be collected:
a) Total unit related electrical energy consumption (E), in kilowatt-hours (kW · h);
b) Power factor of die casting unit (phi); provisions of Table A.1.
4.6 Testing of control accuracy
4.6.2.2 The test shall include at least the main drive actions such as closing the door, closing the mold, pouring, shot, opening the mold, opening the door, ejection (no-load ejection), pushing back, pressing back, picking up (no-load pickup), spraying (no-blowing and no-paint spraying).
4.6.2.3 The hydraulic system has an oil temperature of 30 °C~55 °C.
4.6.2.4 The die casting machine does not select the shot piston tracking function.
4.6.3 Testing method
4.6.3.1 Confirm the integrity of the unit under test. Refer to Table A.2; the unit shall, at the corresponding location, have a sensor interface.
4.6.3.2 Confirm that the sensor signal is reliably and accurately read.
4.6.3.3 When the die casting unit enters the state of continuous operation in the fully-automatic mode, after confirming that the fault-free smooth operation is achieved, data acquisition is started.
4.6.3.4 Each set of parameters shall be tested repeatedly at least 10 times.
4.6.3.5 TRY to rely on a paperless recorder to record all the data.
4.6.4 Calculation method
The control accuracy is calculated according to the method specified in JB/T 10894.
4.7 Testing of repeatability accuracy
4.7.1 Testing items
The testing of repeatability accuracy shall include at least the items listed in Table A.3.
4.7.2 Testing conditions
4.7.2.1 In the state of continuous dry shot operation in the fully-automatic mode, the test shall be carried out. The test parameters shall comply with the provisions of A.1.
4.7.2.2 The test shall include at least the main drive actions such as closing the door, closing the mold, pouring, shot, opening the mold, opening the door, ejection (no-load ejection), pushing back, pressing back, picking up (no-load The testing items shall include at least the items listed in Table A.4.
4.8 Testing of capability machine index (CMK)
4.8.2 Testing conditions
4.8.2.1 In the state of continuous dry shot operation in the fully-automatic mode, the test shall be carried out. The test parameters shall comply with the provisions of Table A.1.
4.8.2.2 The test shall include at least the main drive actions such as closing the door, closing the mold, pouring, shot, opening the mold, opening the door, ejection (no-load ejection), pushing back, pressing back, picking up (no-load pickup), spraying (no-blowing and no-paint spraying).
4.8.2.3 The hydraulic system has an oil temperature of 30 °C~55 °C.
4.8.2.4 The die casting machine does not select the shot piston tracking function.
4.8.3 Testing method
4.8.3.1 Confirm the integrity of the unit under test. Refer to Table A.4; the unit shall, at the corresponding location, have a sensor interface.
4.8.3.2 Confirm that the sensor signal is reliably and accurately accepted by the paperless recorder.
4.8.3.3 The unit motion parameters are set according to Table A.1. The filling of the table is completed.
4.8.3.4 When the die casting unit machine enters the state of continuous operation in the fully-automatic mode, after confirming that the fault-free smooth operation is achieved, data acquisition is started.
4.8.3.5 The number of dry running cycles shall be in accordance with 4.2.3.1.
4.8.3.6 TRY to rely on the records of the paperless recorder to calculate all the data.
4.8.3.7 The method of collecting and calculating single-item data shall meet the standards of die casting machine and auxiliary equipment.
4.8.4 Calculation method
Sampling: Continuous testing 50 times and record.
The upper control limit (USL) and the lower control limit (SLS) of the capability machine index calculation shall be calculated according to formulas (3) and (4), x - Average of the readings; S - Standard deviation. CMK is the smaller of CMU and CML.
4.9 Function and performance check of integrated control systems
4.9.1 Industrial application microcomputer control system
4.9.1.1 Check items and methods
By checking accompanying documents and accompanying operating systems or other monitoring applications, the basic functions and performance of industrial application microcomputer control system are checked. The check items and methods shall be implemented in accordance with 5.3 of GB/T 9813.4-2017.
4.9.1.2 Key check and record items
a) frequency of central processor;
b) bus speed;
c) storage capacity;
d) number of digital I/O interfaces;
e) number of analog I/O interfaces.
4.9.2 PLC control system
Key check and record items are: […]
4.9.2.1 Check items and methods
Through the use of information provided by the PLC manufacturer and programming and debugging tools (PADT), the basic functions and performance of the control system are checked.
The basic functions and performance items of PLC are described in Clause 4 of GB/T 15969.1-2007. The information provided by PLC manufacturer shall meet the requirements of Clause 7 of GB/T 15969.2-2008.
4.9.2.2 Key check and record items
Key check and record items are: […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 21 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 3785.1-2010Electroacoustics - Sound level meters - Part 1: Specifications
- GB/T 9813.4-2017General specification for computers—Part 4: Industrial application microcomputer
- GB/T 15969.1-2007Programmable controllers -- Part 1: General information
- GB/T 15969.2-2008Programmable controllers - Part 2: Equipment requirements and tests
- GB 20906Safety requirements for high pressure metal diecasting units
- GB/T 21269Cold chamber die casting machines
Similar standards
How to Download GB/T 37365-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB 20906-2007 — Safety requirements for high pressure metal diecasting units
GB/T 15969.1-2007 — Programmable controllers -- Part 1: General information
GB/T 21269-2018 — Cold chamber die casting machines
Secure payment via Stripe
Payments accepted
GB/T 37365-2019