Valid

GB/T 37349-2019Design guidelines for cantilever structure of self-elevating drilling units (English PDF)

自升式钻井平台悬臂梁结构设计指南

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 37349-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 25, 2019

Implementation date

October 1, 2019

Scope

GB/T 37349-2019 is the English-translated version of 自升式钻井平台悬臂梁结构设计指南.

GB/T 37349-2019 is the Chinese standard "Design guidelines for cantilever structure of self-elevating drilling units". Its scope clause reads: This standard specifies the design basis, design content, design method and design check of the cantilever beam structure of the jack-up drilling platform.

This standard is applicable to the design of non-lateral sliding cantilever beam structure of jack-up drilling platform. Other types of self-lifting platform can be used as reference. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 37349-2019

National Standard of the People's Republic of China

ICS
47.020.99
Classification
U 17

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 3.1 Cantilever structure

1 Scope

This standard specifies the design basis, design content, design method and design check of the cantilever beam structure of the jack-up drilling platform.

This standard is applicable to the design of non-lateral sliding cantilever beam structure of jack-up drilling platform. Other types of self-lifting platform can be used as reference.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 37335 Self-elevating drilling platform structure full penetration area design guide

GB/T 37347 jack-up rig node structure

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Cantilever structure

Arranged at the end of the main deck of the jack-up rig, consisting of two parallel I-beams and a platform and truss connecting them.

The load-bearing structure of the frame, drill floor and drill floor base can be slid along the track to a certain distance outside the deck of the jack-up rig.

As shown in Figure 1.

Figure 1 Cantilever beam structure […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 37349-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 37349-2019

$205.00