GB/T 37335-2019Design guidelines for structural full penetration weld of self-elevating drilling units (English PDF)
自升式钻井平台结构全焊透区域设计指南
This is a limited preview
Buy now to download the full PDF (15 pages)
Need quotation for your management?
Get a formal quotation for GB/T 37335-2019 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
March 25, 2019
Implementation date
October 1, 2019
Scope
GB/T 37335-2019 is the English-translated version of 自升式钻井平台结构全焊透区域设计指南.
GB/T 37335-2019 is the Chinese standard "Design guidelines for structural full penetration weld of self-elevating drilling units". Its scope clause reads: This Standard specifies the design bases, design contents and methods, design requirements and design check of structural full penetration weld of self-elevating drilling units.
This Standard is applicable to the design of structural full penetration weld of self-elevating drilling units. The design of structural full penetration weld of other types of self-elevating units may also refer to this Standard.
Its clauses include design bases; design contents and methods; design requirements; design check. It was issued by the State Administration of Market Regulation on MARCH 25, 2019 and took effect on OCTOBER 01, 2019.
Found what you need?
Document preview — GB/T 37335-2019
National Standard of the People's Republic of China
- ICS
- 47.020.99
- Classification
- U 17
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword3
- 1 Scope4
- 2 Design bases4
- 3 Design contents and methods4
- 4 Design requirements10
- 5 Design check10
- Bibliography11
1 Scope
This Standard specifies the design bases, design contents and methods, design requirements and design check of structural full penetration weld of self-elevating drilling units.
This Standard is applicable to the design of structural full penetration weld of self-elevating drilling units. The design of structural full penetration weld of other types of self-elevating units may also refer to this Standard.
2 Design bases
The drawings and technical documents on which the design is based include:
a) contract technical instructions;
b) specifications for the classification by classification society;
c) general layout diagram;
d) basic design drawings of the main structures of the unit;
e) equipment base structure diagram.
3 Design contents and methods
3.1 General requirements
The self-elevating drilling unit structure consists of main body, leg, spudcan, jacking unit, cantilever, derrick floor, superstructure and helideck. High stress areas subject to concentrated loads generally require full penetration weld.
3.2 Structural full penetration weld of main body
The division of structural full penetration weld of main body is as follows:
a) The connection of the main bulkhead in the leg trunk range to the main deck and the outer bottom panel (as shown in Figure 1); the vertical
a) The connection of the jacking unit's peripheral wall to the main deck and the outer bottom panel (as shown in Figure 1); the vertical connection of the ends of the jacking unit's peripheral wall (as shown in Figure 2);
b) The connection of the main partitions inside the jacking unit to the peripheral wall;
c) The connection of the ends of the main support structure on the back of the upper and lower guides;
d) The connection of the jacking gear flange sleeve to the jacking unit's peripheral wall;
e) The connection of the ends of the main support structure on the back of the locking anti-rack support buttress.
3.6 Structural full penetration weld of cantilever
The division of the structural full penetration weld of cantilever is as follows:
a) The connection of the longitudinal I-beam web to the upper and lower panels (as shown in Figure 5);
b) The connection of the
c) The connection of the main components of cantilever's sliding base.
3.9 Structural full penetration weld of helideck
Helideck structures generally do not require full penetration weld. If the unit uses the truss-type tube support structure, the connection at the support tube end requires full penetration weld.
NOTE: When considering the division of full penetration weld, it is also necessary to refer to the opinion of the on-site surveyor of classification society.
4 Design requirements
4.1 The full penetration weld diagram shall clearly show the joints and range of full penetration welds and use clear markings.
4.2 If the structure (such as main body, spudcan and jacking unit) has more full penetration welds, or the full penetration weld is not clearly indicated in the corresponding structure drawings, the full penetration weld diagram of the structure shall be drawn separately.
4.3 The full penetration weld of other structures (such as leg, cantilever, derrick floor, superstructure and helideck) is mainly concentrated on the key nodes of the structure and is generally indicated in the node detail of the corresponding structure drawings.
5 Design check
5.2 Whether it complies with the specifications for the classification by classification society.
5.4 Whether it complies with the stress conditions and stress levels of the various structures of the self-elevating drilling unit.
5.5 Whether it has a comprehensive assessment of suitability, processability and economy of the structural system.
5.1 Whether it meets the relevant requirements in the contract technical
instructions.
5.3 Whether it correctly implements the design drawings and technical
documents. […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Similar standards
How to Download GB/T 37335-2019
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 37335-2019
$105.00