Valid

GB/T 37325-2019General requirements of energy consumption synthetic control for shipbuilding enterprises (English PDF)

船舶生产企业能源综合管控通用要求

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 37325-2019 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

March 25, 2019

Implementation date

October 1, 2019

Scope

GB/T 37325-2019 is the English-translated version of 船舶生产企业能源综合管控通用要求.

GB/T 37325-2019 is the Chinese standard "General requirements of energy consumption synthetic control for shipbuilding enterprises".

Its scope clause reads: This standard stipulates the organization and management of energy comprehensive management and control, energy planning and design, and energy mining for shipbuilding enterprises (hereinafter referred to as "enterprises").

Purchase, energy processing conversion, energy distribution and transportation, energy use and consumption, energy metering, energy consumption analysis and promotion and application of energy-saving technologies.

This standard is applicable to the comprehensive control of new energy, renovation and expansion, and energy of existing shipping companies. Its clauses include organization management.

Found what you need?

Document preview — GB/T 37325-2019

National Standard of the People's Republic of China

ICS
47.020.99
Classification
U 01

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • 1 Scope
  • 2 Normative references
  • 3 Organization Management
  • 3.1 Integrated management

1 Scope

This standard stipulates the organization and management of energy comprehensive management and control, energy planning and design, and energy mining for shipbuilding enterprises (hereinafter referred to as "enterprises").

Purchase, energy processing conversion, energy distribution and transportation, energy use and consumption, energy metering, energy consumption analysis and promotion and application of energy-saving technologies.

This standard is applicable to the comprehensive control of new energy, renovation and expansion, and energy of existing shipping companies.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 2589 General rules for comprehensive energy consumption calculation

GB/T 12723 General rules for the preparation of energy consumption per unit of products

GB 17167-2006 General rules for the provision and management of energy metering units

GB/T 36218-2018 Main energy-consuming equipment management requirements for shipbuilding enterprises

GB/T 36219-2018 Energy consumption evaluation method for shipbuilding enterprises

3 Organization Management

3.1 Integrated management

3.1.1

The enterprise shall establish, maintain and improve the energy management and control system with clear scope of duties, authority and reward and punishment system.

3.1.2

The enterprise shall have the corresponding department responsible for the comprehensive management and control of energy, establish a clear and complete energy management system for the division of labor, and implement the management duties.

Responsible for determining a clear energy management and control policy and quantitative indicator system.

3.1.3

The enterprise shall determine the energy consumption and energy saving target value in the quantitative indicator system in written form according to the enterprise's comprehensive energy management and control policy. Enterprise

All relevant personnel in the industry should clarify and implement energy consumption and energy conservation goals. Energy consumption targets should reflect energy consumption, and energy conservation targets should reflect energy

Consumption savings, and annual goals and long-term goals can be set separately.

3.1.4

Enterprise energy comprehensive control usually includes the following main links.

a) energy planning and design;

b) energy procurement (input);

c) energy processing conversion;

d) energy allocation and transmission;

e) energy use and consumption;

f) energy metering;

g) energy consumption analysis;

h) Promotion and application of energy-saving technologies.

3.1.5

The energy management and control department shall implement specific tasks to all relevant departments, personnel and positions at different levels.

3.1.6

While assigning and implementing energy management and control duties, an enterprise shall grant the necessary authority to perform such duties.

3.1.7

Establish an energy management and energy conservation system and corresponding reward and punishment system for all employees.

3.1.8

Establish a training mechanism for management personnel and technical personnel for energy management and control.

3.1.9

Equipped with energy measuring instruments in accordance with the provisions of GB 17167-2006, and establish a corresponding measurement management system.

3.1.10

The enterprise shall conduct a comprehensive inspection of the energy management and control system on a regular basis. When it is found that the energy consumption is abnormal, the relevant links should be divided.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 37325-2019

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 37325-2019

$145.00