Valid

GB/T 37257-2018Wind turbines -- Measurement of mechanical loads (English PDF)

风力发电机组机械载荷测量

Preview PDF

This is a limited preview

Buy now to download the full PDF (145 pages)

Need quotation for your management?

Get a formal quotation for GB/T 37257-2018 in 30 minutes.

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

December 28, 2018

Implementation date

July 1, 2019

Scope

GB/T 37257-2018 is the English-translated version of 风力发电机组机械载荷测量.

GB/T 37257-2018 is the Chinese standard "Wind turbines -- Measurement of mechanical loads". Its scope clause reads: In order to carry out the load simulation model verification, this standard describes the measurement of the basic structural load of the wind turbine.

This standard specifies the field Ground selection, signal screening, data acquisition, calibration, data validation, load measurement conditions, capture matrices, post-processing, uncertainty calculations, and reporting Requirements and recommendations.

In addition, informative appendices are provided to increase the level of awareness of test methods. The method described in this standard can also be used for mechanical load measurement for other purposes, such as statistical analysis of measured loads, straight design loads.

Measurements, safety and functional tests or component load measurements. If these methods are used for other purposes or for unconventional wind turbines Design, the required signals, measured load conditions, capture matrix and post-processing methods need to be evaluated and adjusted as needed to Reach the corresponding goal.

These methods are applicable to land horizontal axis wind turbines (HAWT) with a wind turbine sweeping area greater than.200 m2. However, the method can also It is suitable for other wind turbines (for example, small wind turbines, ducted wind turbines, vertical axis wind turbines). Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 37257-2018

National Standard of the People's Republic of China

ICS
27.180
Classification
F 11

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Foreword
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and Definitions
  • 4 symbols, units and abbreviations
  • 5 Overview
  • 5.1 Document Structure
  • 5.2 Safety during testing
  • 6 Test Requirements
  • 6.1 Overview
  • 6.2 Test site requirements
  • 6.3 Load measurement conditions
  • 6.4 Measurement parameters
  • 6.5 Wind Turbine Configuration Changes
  • 7 test equipment
  • 7.1 Load
  • 7.2 Meteorological parameters
  • 7.3 Wind turbine operating parameters
  • 7.4 Data Acquisition System
  • 8 calibration coefficient determined
  • 8.1 Overview
  • 8.2 Load channel calibration
  • 8.3 Non-load channel calibration
  • 9 Data Verification
  • 9.1 Overview
  • 9.2 Verification check
  • 10 Measurement data processing
  • 10.1 Overview
  • 10.2 Basic load
  • 10.3 Loads of large wind turbines
  • 10.4 Wind speed trend detection
  • 10.5 Statistics
  • 10.6 Rainflow Count
  • 10.7 Cumulative Rainflow Spectrum
  • 10.8 Equivalent fatigue load
  • 10.9 Wind Speed Zone
  • 10.10 Power Spectral Density
  • 11 Uncertainty assessment
  • 12 Report
  • Appendix A (informative) Example coordinate system
  • Appendix B (informative) Wind turbine generator load measurement uncertainty assessment process
  • Appendix C (informative) Sample format for mechanical load measurement and analysis
  • Appendix D (informative) Marine Survey Recommendations
  • Appendix E (informative) Load model verification
  • Appendix F (informative appendix) Wind speed trend identification method
  • Appendix G (informative) Data Collection Precautions
  • Appendix H (informative) Load calibration
  • Appendix I (informative) Temperature drift
  • Appendix J (informative) Mechanical load measurement of vertical axis wind turbines

1 Scope

In order to carry out the load simulation model verification, this standard describes the measurement of the basic structural load of the wind turbine. This standard specifies the field

Ground selection, signal screening, data acquisition, calibration, data validation, load measurement conditions, capture matrices, post-processing, uncertainty calculations, and reporting

Requirements and recommendations. In addition, informative appendices are provided to increase the level of awareness of test methods.

The method described in this standard can also be used for mechanical load measurement for other purposes, such as statistical analysis of measured loads, straight design loads.

Measurements, safety and functional tests or component load measurements. If these methods are used for other purposes or for unconventional wind turbines

Design, the required signals, measured load conditions, capture matrix and post-processing methods need to be evaluated and adjusted as needed to

Reach the corresponding goal.

These methods are applicable to land horizontal axis wind turbines (HAWT) with a wind turbine sweeping area greater than.200 m2. However, the method can also

It is suitable for other wind turbines (for example, small wind turbines, ducted wind turbines, vertical axis wind turbines).

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

IEC 60050 (all parts) International Electrotechnical Vocabulary

IEC 61400-1.2005 Wind turbines Part 1. Design requirements (Windturbines-Part 1. Designrequire-

Mess)

IEC 61400-12-1 Wind Turbines Part 12-1. Power Generation Wind Turbine Power Characteristics Test (Windturbines-

Part 12-1. Powerperformancemeasurementsofelectricityproducingwindturbines)

ISO /IEC Guide 98-3 Uncertainty of measurement Part 3. Representation of uncertainty in measurement (Uncertaintyofmeas- urement-Part 3. Guidetotheexpressionofuncertaintyinmeasurement)

3 Terms and definitions

The following terms and definitions as defined in IEC 60050-415 apply to this document.

3.1 Blade

The rotor rotates to produce aerodynamic components.

3.2 Leaf root bladeroot

The part of the blade that is connected to the hub.

3.3 Brake state brakestatus

The state of brake input or not.

3.4 Calibration

Determine the transfer function from the sensor output to the physical quantity and its coefficients.

GB/T 25387.1 | GB/T 25388.1 | GB/T 25389.1 | GB/T 47557 | GB/T 47555 | […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 145 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 37257-2018

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
145 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 37257-2018

$1,070.00