Valid

GB/T 37257-2018Wind turbines -- Measurement of mechanical loads (English PDF)

Also coversGBT37257-2018

Open the GB/T 37257-2018 preview as PDF

Preview — first pages of GB/T 37257-2018

This is a limited preview

Buy now to download the full PDF

Issued by

State Administration for Market Regulation, China National Standardization Administration

Level / Type

National · Recommended

Issue date

December 28, 2018

Implementation date

July 1, 2019

Scope

GB/T 37257-2018 (Wind turbines -- Measurement of mechanical loads) is available as an English-translated PDF.

GB/T 37257-2018 — In order to carry out the load simulation model verification, this standard describes the measurement of the basic structural load of the wind turbine. This standard specifies the field Ground selection, signal screening, data acquisition, calibration, data validation, load measurement conditions, capture matrices, post-processing, uncertainty calculations, and reporting Requirements and recommendations. In addition, informative appendices are provided to increase the level of awareness of test methods. The method described in this standard can also be used for mechanical load measurement for other purposes, such as statistical analysis of measured loads, straight design loads. Measurements, safety and functional tests or component load measurements. If these methods are used for other purposes or for unconventional wind turbines Design, the required signals, measured load conditions, capture matrix and post-processing methods need to be evaluated and adjusted as needed to Reach the corresponding goal. These methods are applicable to land horizontal axis wind turbines (HAWT) with a wind turbine sweeping area greater than.200 m2. However, the method can also It is suitable for other wind turbines (for example, small wind turbines, ducted wind turbines, vertical axis wind turbines).

Document preview — GB/T 37257-2018

National Standard of the People's Republic of China

ICS
27.180
Classification
F 11

Issued by: State Administration for Market Regulation, China National Standardization Administration

Contents

  • Foreword
  • Introduction
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard uses the translation method equivalent to IEC 61400-13.2015 "Wind Generator Section 13. Mechanical Load Measurement".

The documents of our country that have a consistent correspondence with the international documents referenced in this standard are as follows.

---GB/T 2900.53-2001 Electrotechnical terminology wind turbine (idtIEC 60050-415.1999)

---GB/T 18451.1-2012 Wind turbine design requirements (IEC 61400-1.2005, IDT)

---GB/T 18451.2-2012 Wind Turbine Power Characteristics Test (IEC 61400-12-1.2005, IDT)

This standard has made the following editorial changes.

--- Modified the standard name.

This standard was proposed by the China Machinery Industry Federation.

This standard is under the jurisdiction of the National Wind Machinery Standardization Technical Committee (SAC/TC50).

This standard is mainly drafted by. Zhejiang Yunda Wind Power Co., Ltd., China Electric Power Research Institute Co., Ltd., Beijing Jianheng Certification

Center Co., Ltd., China Resources Power Technology Research Institute Co., Ltd., China Classification Society Quality Certification Company, Xinjiang Goldwind Technology Co., Ltd.

China Shipbuilding Industry Group Haizhuang Wind Power Co., Ltd., Gemei Wind Power (Tianjin) Co., Ltd., Shanghai Tianxiang Quality Technology Service Co., Ltd.

Division, Beijing Xinye New Energy Technology Co., Ltd.

Introduction

In the structural design of wind turbines, a comprehensive understanding and accurate quantification of loads is extremely important.

In the design phase, the load can be predicted using aeroelastic models and related standards. However, due to the flaws in this model

Uncertainty usually needs to be verified by measurement.

Mechanical load measurement can be used as the basis for design and certification. The design of the wind turbine is detailed in IEC 61400-1, and the certification procedure is

Described in GB/T 20319. This standard is for test institutions, wind turbine manufacturers and certification bodies, and specifies the mechanical load.

The minimum requirements for the load test are to achieve highly consistent, high quality, repeatable test results.

Wind turbine generator mechanical load measurement

1 Scope

In order to carry out the load simulation model verification, this standard describes the measurement of the basic structural load of the wind turbine. This standard specifies the field

Ground selection, signal screening, data acquisition, calibration, data validation, load measurement conditions, capture matrices, post-processing, uncertainty calculations, and reporting

Requirements and recommendations. In addition, informative appendices are provided to increase the level of awareness of test methods.

The method described in this standard can also be used for mechanical load measurement for other purposes, such as statistical analysis of measured loads, straight design loads.

Measurements, safety and functional tests or component load measurements. If these methods are used for other purposes or for unconventional wind turbines

Design, the required signals, measured load conditions, capture matrix and post-processing methods need to be evaluated and adjusted as needed to

Reach the corresponding goal.

These methods are applicable to land horizontal axis wind turbines (HAWT) with a wind turbine sweeping area greater than.200 m2. However, the method can also

It is suitable for other wind turbines (for example, small wind turbines, ducted wind turbines, vertical axis wind turbines).

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

IEC 60050 (all parts) International Electrotechnical Vocabulary

IEC 61400-1.2005 Wind turbines Part 1. Design requirements (Windturbines-Part 1. Designrequire-

Mess)

IEC 61400-12-1 Wind Turbines Part 12-1. Power Generation Wind Turbine Power Characteristics Test (Windturbines-

Part 12-1. Powerperformancemeasurementsofelectricityproducingwindturbines)

ISO /IEC Guide 98-3 Uncertainty of measurement Part 3. Representation of uncertainty in measurement (Uncertaintyofmeas-

urement-Part 3. Guidetotheexpressionofuncertaintyinmeasurement)

3 Terms and definitions

The following terms and definitions as defined in IEC 60050-415 apply to this document.

3.1

Blade blade

The rotor rotates to produce aerodynamic components.

3.2

Leaf root bladeroot

The part of the blade that is connected to the hub.

3.3

Brake state brakestatus

The state of brake input or not.

3.4

Calibration

Determine the transfer function from the sensor output to the physical quantity and its coefficients.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Referenced standards

How to Buy GB/T 37257-2018

  1. 1Add to cart. Click the "Buy GB/T 37257-2018" button on this page. You can add more standards before checkout.
  2. 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
  3. 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
  4. 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 37257-2018

$1,160.00

$985.00for partners