Valid

GB/T 35729-2026Technical code for operation, maintenance and testing of digital electro-hydraulic control systems for steam turbines in thermal power plants (English PDF)

火力发电厂汽轮机数字电液控制系统运行维护与试验技术规程

Preview PDF

This is a limited preview

Buy now to download the full PDF

Need quotation for your management?

Get a formal quotation for GB/T 35729-2026 in 30 minutes.

Issued by

State Administration for Market Regulation; Standardization Administration of China

Level / Type

National · Recommended

Issue date

October 30, 2026

Implementation date

May 1, 2027

Scope

GB/T 35729-2026 is the English-translated version of 火力发电厂汽轮机数字电液控制系统运行维护与试验技术规程.

GB/T 35729-2026 is the Chinese national standard "Technical code for operation, maintenance and testing of digital electro-hydraulic control systems for steam turbines in thermal power plants".

It was issued on October 30, 2026 by the State Administration for Market Regulation and the Standardization Administration of China, and takes effect on May 1, 2027. It is a current standard and replaces GB/T 35729-2017.

Found what you need?

Document preview — GB/T 35729-2026

National Standard of the People's Republic of China

Issued by: State Administration for Market Regulation; Standardization Administration of China

Contents

  • Document data
1 Document data

Sector: National standard (Recommended).

Issuing body: State Administration for Market Regulation; Standardization Administration of China.

Date of issue: 2026-10-30.

Date of implementation: 2027-05-01.

Status: valid, replaces GB/T 35729-2017.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — all pages — is available in the English PDF.

Editions of GB/T 35729

EditionTitleRevisionStatus
GB/T 35729-2026Technical code for operation, maintenance and testing of digital electro-hydraulic control systems for steam turbines in thermal power plants—Valid from 2027-05-01
GB/T 35729-2017Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant—Valid until 2027-05-01

This page sells the current edition, GB/T 35729-2026. Earlier editions are listed for reference only.

How to Download GB/T 35729-2026

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 35729-2026

$255.00