Valid

GB/T 35729-2017Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant (English PDF)

火力发电厂汽轮机数字电液控制系统运行维护与试验技术规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 35729-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

December 29, 2017

Implementation date

July 1, 2018

Scope

GB/T 35729-2017 is the English-translated version of 火力发电厂汽轮机数字电液控制系统运行维护与试验技术规程.

GB/T 35729-2017 is the Chinese standard "Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant".

Its scope clause reads: This standard specifies the thermal power plant steam turbine digital electro-hydraulic control system (DEH) overhaul, test and operation of the content, methods and Technical requirements should be met.

This standard applies to thermal power plant in-service units using distributed control system (DCS) consisting of DEH. Other types of steam turbine electricity Hydraulic control system can also refer to the implementation. Its clauses include terms and definitions.

Found what you need?

Document preview — GB/T 35729-2017

National Standard of the People's Republic of China

ICS
27.100
Classification
F 23

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 overhaul
  • 4.1 Preparation before maintenance
  • 4.2 blackout maintenance
  • 4.3 after power overhaul
  • 5 Test
  • 5.1 before starting the static test and technical requirements
  • 5.2 start-up phase of dynamic test and technical requirements
  • 6 operation and maintenance
  • 6.1 Routine Maintenance
  • 6.2 regular maintenance and testing

1 Scope

This standard specifies the thermal power plant steam turbine digital electro-hydraulic control system (DEH) overhaul, test and operation of the content, methods and

Technical requirements should be met.

This standard applies to thermal power plant in-service units using distributed control system (DCS) consisting of DEH. Other types of steam turbine electricity

Hydraulic control system can also refer to the implementation.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this document.

For undated references, the latest edition (including all amendments) applies to this document.

Thermal power station monitoring system terminology

GB/T 30370 thermal power unit primary frequency performance test and acceptance guidelines

DL/T 656 Thermal Power Plant Turbine Control System Acceptance Test Procedures

Test guideline for steam turbine governing system

Thermal power plant thermal industrial automation system maintenance operation and maintenance of technical regulations

DL/T 1270 Thermal Power Generation Project Load Rejection Test Guideline 711

3 Terms and definitions

GB/T 26863-2011 defined and the following terms and definitions apply to this document. For ease of use, the following list is repeated

GB/T 26863-2011 some of the terms and definitions.

3.1 Unequal speed droop

Steam turbine control system static characteristic curve slope. Usually the corresponding empty load and full load speed difference and rated speed ratio

Percentage to indicate.

[GB/T 26863-2011, Definition 6.29.4.15]

3.2 Primary frequency control primarycontrolofthespeedofgeneratingsets; primaryfrequencycontrol; PFC

Each prime mover governor to adjust the speed of each generator, so that the drive torque varies with the system frequency.

[GB/T 26863-2011, Definition 6.29.1.5]

3.3 Intake mode conversion FA/PAtransfer

According to the operating mode (constant pressure, sliding pressure) and load changes in the request, change the steam turbine control valve opening mode, so that the turbine throttle

Section (full steaming) or nozzle adjustment (partial steaming).

[GB/T 26863-2011, Definition 6.29.4.12] […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Similar standards

How to Download GB/T 35729-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 35729-2017

$145.00