GB/T 35709-2017Maintenance regulation for bulb hydro-turbine generating units (English PDF)
灯泡贯流式水轮发电机组检修规程
This is a limited preview
Buy now to download the full PDF (45 pages)
Need quotation for your management?
Get a formal quotation for GB/T 35709-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 29, 2017
Implementation date
July 1, 2018
Scope
GB/T 35709-2017 is the English-translated version of 灯泡贯流式水轮发电机组检修规程.
GB/T 35709-2017 is the Chinese standard "Maintenance regulation for bulb hydro-turbine generating units". Its scope clause reads: This standard stipulates the maintenance level, maintenance cycle, maintenance items, inspection and repair procedures, acceptance and testing of bulb-type turbine-generator sets, etc. Claim.
This standard applies to bulb turbine tuner units with rated power of 5MW and above or runner diameter of 2.5m and above. repair. Other bulb tune turbine unit maintenance can refer to the implementation. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 35709-2017
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- F 23
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Basic regulations
- 4.1 Service Interval and Deactivation Time
- 4.2 Inspection Projects and Quality Checkpoints
- 4.3 Overhaul Engineering Planning and Planning
- 4.4 Maintenance Preparation
- 4.5 Maintenance and Safety Ring Management
- 4.6 Maintenance and Repair Phase Organization and Management
- 4.7 General requirements for inspection process quality
- 4.8 Overhaul General Process
- 5 Turbine Overhaul
- 5.1 Wheel and Spindle Inspection
- 5.2 Overhaul of water guides
- 5.3 Expansion joint and runner room inspection
- 5.4 Duct Inspection
- 5.5 Tubular seat and baffle plate inspection
- 5.6 Oil Receiver and Operation Oil Tubing Inspection
- 5.7 Turbine Bearings Inspection and Repair
- 5.8 Spindle Seal Overhaul
- 5.9 Unit Center Check Processing
- 6 Generator Overhaul
- 6.1 Stator Inspection
- 6.2 Rotor Overhaul
- 6.3 Combined Bearing Repair
- 6.4 Lamp Head Assembly Repair
- 6.5 Braking Device Overhaul
- 6.6 Generator Ventilation and Cooling System Overhaul
- 6.7 Generator Neutral Point Equipment Overhaul
- 7 Bearing Oil System Overhaul
- 7.1 Bearing Tank Service
- 7.2 Bearing Oil Cooler Overhaul
- 8 Unit Inspection Acceptance and Test
- 8.1 Inspection and Acceptance
- 8.2 Starting the test project
- 8.3 Overall Inspection and Requirements after Overhaul
- 9 Inspection Summary and Evaluation
- 9.1 Maintenance Information Requirements
- 9.2 Post-Maintenance Assessment
- Appendix D (Informative) Reference Flow Chart for Preparation of Class A Overhaul of Bulb Tubular Turbine Generators
- Appendix E (Informative Appendix) General Disassembly Process Flow of Bulb Tubular Turbine Generators
- Appendix F (Informative Appendix) Flowchart for General Installation of Bulb Tubular Turbine Generating Units
- Appendix G (Informative) Maintenance Critical Data Records
1 Scope
This standard stipulates the maintenance level, maintenance cycle, maintenance items, inspection and repair procedures, acceptance and testing of bulb-type turbine-generator sets, etc.
Claim.
This standard applies to bulb turbine tuner units with rated power of 5MW and above or runner diameter of 2.5m and above.
repair. Other bulb tune turbine unit maintenance can refer to the implementation.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 8564 Installation Specifications for Hydrogenerator Units
General specification of GB/T 16938 fastener bolts, screws, studs and nuts
GB/T 24001 Environmental Management System Requirements and Usage Guidelines
GB 26164.1 Code of Practice for Electrical Safety Part 1. Thermal and Mechanical
GB/T 28001 occupational health and safety management system requirements
DL/T 596 Preventive Test Procedures for Electrical Equipment
DL/T 827 Bulb Turbine Generator Startup Test Procedure
DL/T 1318 Specification for Technical Supervision of Hydroelectric Power Plants
DL/T 5070 on-site manufacturing installation and welding process guide for hydro turbine metal volute
DL/T 5113.11 Standard for the Quality Assessment of Single Projects of Hydropower and Water Conservancy Capital Construction Project Part 11. Bulb Tubular Water
Wheel generator installation engineering
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1 Maintenance level
Based on the principle of maintenance and decommissioning time of bulb-type turbine-generator units, the maintenance of the unit is divided into four grades. A, B, C, and D.
3.2 Class A overhaul Aclassmaintenance
Complete disassembling inspections and repairs of turbines and generators on the unit or alone to maintain, restore, or improve equipment performance.
3.3 Class B overhaul Bclassmaintenance
For some problems with the unit's equipment, disassemble the unit's equipment and repair. Class B maintenance can be based on unit equipment
According to the results of the state assessment, some A-level maintenance projects or periodic rolling maintenance projects are targeted.
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 45 pages — is available in the English PDF.
Similar standards
How to Download GB/T 35709-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 35709-2017
$720.00