GB/T 35707-2017Guide for hydropower plant identification system (English PDF)
水电厂标识系统编码导则
This is a limited preview
Buy now to download the full PDF (45 pages)
Need quotation for your management?
Get a formal quotation for GB/T 35707-2017 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 29, 2017
Implementation date
July 1, 2018
Scope
GB/T 35707-2017 is the English-translated version of 水电厂标识系统编码导则.
GB/T 35707-2017 is the Chinese standard "Guide for hydropower plant identification system".
Its scope clause reads: This standard specifies the basic requirements for the coding of conventional hydropower plant identification systems, and the format of process-related identification, installation identification, and location identification, and value requirements, labeling requirements, and identification of various systems and major equipment in hydropower plants.
This standard applies to conventional hydropower plant engineering design, construction, operation and maintenance. Its clauses include terms and definitions.
Found what you need?
Document preview — GB/T 35707-2017
National Standard of the People's Republic of China
- ICS
- 27.140
- Classification
- F 04
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and Definitions
- 4 Basic requirements
- 5 Process related identification
- 5.1 Identification Structure
- 5.2 Coding Character Type
- 5.3 Prefix
- 5.4 Factory code
- 5.5 System Code
- 5.6 Device Code
- 5.7 Part Number
- 5.8 Identification of each system and major equipment
- 6 Mounting Point Identification
- 6.1 Identification Structure
- 6.2 Coding Character Type
- 6.3 Prefix
- 6.4 Factory code
- 6.5 Installation Unit Number
- 6.6 Separator
- 6.7 Installation Space Code
- 7 Location ID
- 7.1 Identification Structure
- 7.2 Coding Character Type
- 7.3 Prefix
- 7.4 Factory code
- 7.5 Building (structure) building code
- 7.6 Room (District) Code
- 8 Labeling regulations
- 8.1 Label Format
- 8.2 Drawing Dimensions
- 8.3 On-site annotation
- Appendix A (Normative) System Index
- Appendix B (Normative Appendix) Equipment Index
- Appendix C (Normative) Component Index
- Appendix D (Normative Appendix) Identification of various systems and major equipment of hydropower plants
- Appendix E (Normative Appendix) Building Index
- Appendix F (Informative) Signal Status Indicators
1 Scope
This standard specifies the basic requirements for the coding of conventional hydropower plant identification systems, and the format of process-related identification, installation identification, and location identification.
And value requirements, labeling requirements, and identification of various systems and major equipment in hydropower plants.
This standard applies to conventional hydropower plant engineering design, construction, operation and maintenance.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 50549 power plant identification system coding standard
DL/T 5202 Electrical Energy Metering System Design Specification
3 Terms and Definitions
The following terms and definitions, as defined in ISO /IEC 14001, apply to this document. For ease of use, the following is a repeated list of GB/T 50549
Some of the terms and definitions.
3.1 Identification
Unique identifiers are assigned to physical objects to distinguish them from other physical objects.
[GB/T 50549-2010, definition 2.0.1]
3.2 Notation
The process of recording the identification symbol or code on the media.
[GB/T 50549-2010, definition 2.0.2]
3.3 Process-related identification
According to the functions in the mechanical, electrical, civil engineering and other specialties, the code of the process-related systems and equipment is identified.
3.4 Installation point identification
Identifies the code of the installation point of the electrical equipment in the installation unit (such as cabinet, tray, console).
3.5 Location identification
Identify the code for the layout of the rooms, plant grids or fire zones on each floor of the building under construction.
3.6 Unit
The entire set of devices in a power plant that serves as the basic unit of electricity production.
[GB/T 50549-2010, definition 2.0.6] […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 45 pages — is available in the English PDF.
Similar standards
How to Download GB/T 35707-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Fast delivery
After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
GB/T 35707-2017
$710.00