Scope
GB/T 35413-2017 is the English-translated version of 应急导向系统 评价指南.
GB/T 35413-2017 is the Chinese standard "Safety way guidance systems—Evaluation guidelines". Its scope clause reads: This standard gives the guidelines for the evaluation of emergency guidance systems in buildings, evaluation procedures and application of evaluation results.
This standard applies to the emergency guidance system of construction units, management units and third-party agencies for emergency guidance systems in the building Design, setup and operation management.
Its clauses include terms and definitions; evaluation principles; evaluation process.
Found what you need?
Document preview — GB/T 35413-2017
National Standard of the People's Republic of China
- ICS
- 01.080.01
- Classification
- A 22
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Preface
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Evaluation principles
- 5 Evaluation Procedure
- 5.1 Basic Procedure
- 5.2 Evaluation Planning
- 5.3 Evaluation Implementation
- 5.4 Evaluation documentation
- 6 Evaluation Results Application
- Appendix A (informative) emergency guidance system evaluation key points
- Appendix B (Informative) Emergency Guidance System Evaluation Importance Strategic Matrix Analysis Example
- Appendix C (Informative) Emergency Guide System Evaluation Documents Common Elements
1 Scope
This standard gives the guidelines for the evaluation of emergency guidance systems in buildings, evaluation procedures and application of evaluation results.
This standard applies to the emergency guidance system of construction units, management units and third-party agencies for emergency guidance systems in the building
Design, setup and operation management.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 15565 (all parts) graphic symbol terminology
GB/T 19038 customer satisfaction evaluation model and method guide
GB/T 23809 emergency guide system setting principles and requirements
3 Terms and definitions
GB/T 15565 (all parts), GB/T 19038 and GB/T 23809 defined terms and definitions apply to this document.
4 evaluation principles
Emergency guidance system to carry out the evaluation should follow the following principles.
a) Objectivity principle. The evaluation of emergency guidance system needs to objectively reflect the actual level of emergency guidance system design, setup and operation management,
Ensure adequate and appropriate evidence support for evaluation results and evaluation conclusions, provide guidance for emergency response system construction and management decision making
Scientific basis b) Targeted principles. Select the evaluation method, the establishment of index system need to consider the type of site, population density, emergency guidance system knot
Structure and other factors to ensure the final determination of the evaluation method, the index system can accurately reflect the characteristics of the object of evaluation;
c) The principle of independence. Emergency guidance system evaluation should be conducted by a third party alone, or by the independent guidance system
The rest of the department in charge of construction and management shall be responsible for evaluating the implementation of the project and should not be interrupted by the stakeholders.
5 evaluation process
5.1 basic procedures
The emergency guidance system evaluation program mainly consists of three stages of evaluation planning, evaluation implementation and evaluation document preparation, and can be used for evaluation purposes
Way, the parties concerned requirements and other factors to delete or repeat some aspects of the work until a comprehensive and reasonable conclusion.
5.2 Evaluation Planning
5.2.1 determine the evaluation needs
Before evaluation, we first make a clear assessment of the demand according to the purpose and purpose of the evaluation, as the method of selecting the evaluation method and establishing the index system […]
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 35413-2017
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 35413-2017
$205.00