Valid

GB/T 34910.4-2017Guidelines for marine renewable energy resources survey and assessment—Part 4: Marine current (English PDF)

海洋可再生能源资源调查与评估指南 第4部分: 海流能

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 34910.4-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

November 1, 2017

Implementation date

February 1, 2018

Scope

GB/T 34910.4-2017 is the English-translated version of 海洋可再生能源资源调查与评估指南 第4部分: 海流能.

GB/T 34910.4-2017 is the Chinese standard "Guidelines for marine renewable energy resources survey and assessment—Part 4: Marine current". Its scope clause reads: GB/T 34910 provisions of this part of the current energy resources survey, marine resources assessment and current resources survey and assessment report write.

This section applies to the survey and assessment of current energy resources. Its clauses include terms and definitions; current energy resources survey.

Found what you need?

Document preview — GB/T 34910.4-2017

National Standard of the People's Republic of China

ICS
07.060
Classification
F 14

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 current energy resources survey
  • 4.1 Survey Plan
  • 4.2 Specifications
  • 5 Assessment of current energy resources
  • 5.1 Evaluation Contents
  • 5.2 Evaluation Methods
  • 5.3 Current technology resources can be developed by the level of classification
  • 6 Current Survey and Assessment Report on Current Resources

1 Scope

GB/T 34910 provisions of this part of the current energy resources survey, marine resources assessment and current resources survey and assessment report write.

This section applies to the survey and assessment of current energy resources.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article

Pieces. For undated references, the latest edition (including all amendments) applies to this document.

GB/T 12763.2 Specifications for marine surveys Part 2. Marine hydrological observations

GB/T 12763.7 Marine survey code - Part 7. Oceanographic data exchange

GB/T 34910.1-2017 Marine Renewable Energy Resources Survey and Assessment Guide Part 1. General

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Current

Large-scale relatively stable flow of sea water. Including cyclical and aperiodic currents.

3.2 Current energy

The kinetic energy of seawater flow.

3.3 Current density power density of sea current energy

Unit of time through the unit of the seawater flow direction perpendicular to the kinetic energy.

3.4 The average current cross-section power

The average current through a section perpendicular to the direction of the ocean current over a period of time.

4 current energy resources survey

4.1 Survey program development

4.1.1 determine the survey sea area
4.1.1.1

According to the purpose and requirements of the sea current survey, collect relevant historical information, access to relevant documents and reports. Collected historical data

And literature reports include.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 34910.4-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 34910.4-2017

$145.00