Valid

GB/T 34657.2-2017Interoperability test specifications of electric vehicle conductive charging—Part 2: Vehicle (English PDF)

电动汽车传导充电互操作性测试规范 第2部分:车辆

Preview PDF

This is a limited preview

Buy now to download the full PDF (22 pages)

Need quotation for your management?

Get a formal quotation for GB/T 34657.2-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 14, 2017

Implementation date

May 1, 2018

Scope

GB/T 34657.2-2017 is the English-translated version of 电动汽车传导充电互操作性测试规范 第2部分:车辆.

GB/T 34657.2-2017 is the Chinese standard "Interoperability test specifications of electric vehicle conductive charging - Part 2: Vehicle".

Its scope clause reads: This Part of GB/T 34657 specifies the inspection rules, test conditions, test items, test methods and conformance assessment for the interoperability test of electric vehicle conductive charging.

Its clauses include terms and definitions; inspection rules; test conditions; test items. It was issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China on OCTOBER 14, 2017 and took effect on MAY 1, 2018.

Found what you need?

Document preview — GB/T 34657.2-2017

National Standard of the People's Republic of China

ICS
43.040.99
Classification
T 35

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative references4
  • 3 Terms and definitions5
  • 4 Inspection rules5
  • 5 Test conditions6
  • 6 Test items7
  • Annex A (Normative) List of test items22

1 Scope

This Part of GB/T 34657 specifies the inspection rules, test conditions, test items, test methods and conformance assessment for the interoperability test of electric vehicle conductive charging.

2 Normative references

The following documents are essential to the application of this document. For dated references, only the editions with the dates indicated are applicable to this document. For undated references, only the latest editions (including all the amendments) are applicable to this document.

GB/T 18384.2-2015 Electrically propelled road vehicles - Safety specifications - Part 2: Vehicle operational safety means and protection against failures

GB/T 18487.1-2015 Electric vehicle conductive charging system - Part 1: General requirements

GB/T 19596 Terminology of electric vehicles

GB/T 20234.1-2015 Connection set for conductive charging of electric vehicles - Part 1: General requirements

GB/T 20234.2-2015 Connection set for conductive charging of electric vehicles - Part 2: AC charging coupler

GB/T 20234.3-2015 Connection set for conductive charging of electric vehicles - Part 3: DC charging coupler

GB/T 27930-2015 Communication protocols between off-board conductive charger and battery management system for electric vehicle

GB/T 34658-2017 Conformance test for communication protocols between off-board conductive charger and battery management system for electric vehicle

3 Terms and definitions

The terms and definitions defined in GB/T 18384.2-2015, GB/T 18487.1-2015,

GB/T 19596 and GB/T 20234.1-2015 as well as the following ones are applicable to this document.

3.1 Charging interoperability

The ability of the same or different models and versions of power supply equipment and electric vehicles to realize charging interconnection through information exchange and process control.

4 Inspection rules

4.1 The vehicles shall meet the test items corresponding to the test objects in Annex A.

4.2 The sequence for the interoperability test of electric vehicle conductive charging is as follows. The schematic diagram is illustrated in Figure 1.

5 Test conditions

5.1 Environmental conditions

The test environmental conditions shall meet the following requirements. […]

5.2 Power conditions

The power supply conditions during the test are as follows. […]

5.3 Instrumentation requirements

Unless otherwise specified, the accuracy of the instrumentation used in the test shall meet the following requirements. […]

5.4 Vehicle requirements

5.4.1 The DC conductive charging communication protocol of the vehicles shall comply with GB/T 27930-2015.

5.4.2 For the test items requiring charging power, prior to test, the state of charge of the vehicle's power storage battery shall be at a relatively low level.

DISCHARGE the power storage battery according to the method specified by the vehicle manufacturer. If the vehicle manufacturer does not provide a specific discharge plan, the discharge operation can be carried out by the vehicle driving (on a road or on a gantry). The reference discharge termination conditions are as follows. […]

5.5 Other requirements

AC charging connection devices used for testing vehicles shall meet GB/T 20234.2-2015.DC charging connection devices shall meet GB/T 20234.3-2015.

6 Test items

6.1 Socket space size check

Test purpose. CHECK the normal operating space of the vehicle socket.

Test method. USE a standard plug that conforms to the maximum external dimensions specified in Annex C of GB/T 20234.2-2015 and / or Annex C of GB/T 20234.3-2015 for plugging and unplugging operations.

Conformance assessment. The vehicle socket and the vehicle plug shall be able to connect properly without producing interference.

6.2 Interoperability test of DC charging

6.2.1 Test system

The circuit and control principle of the interoperability test system of electric vehicle DC charging shall comply with Annex B of GB/T 18487.1-2015. The communication protocol shall comply with GB/T 27930-2015. The low-voltage auxiliary power supply circuit voltage is 12.0V ± 0.6V. The current is 10A. In addition, PE and A- shall be electrically isolated. The test system simulates off-board charger to test the charge control process, connection control timing, and abnormal charge status response of electric vehicles. The test system's structure is illustrated in Figure 2.

6.2.2 Charge control process test
6.2.2.1 Vehicle charging and driving interlock test

Test purpose. DETERMINE the non-driving state of the vehicle after the vehicle plug is engaged with the vehicle socket. Test method and procedures.

6.2.2.2 Connection validation test

Test purpose. DETERMINE whether the vehicle interface is able to be fully connected.

6.2.2.3 Self-test phase test

Test purpose. CHECK whether the correct charging process can be entered after the vehicle is fully connected.

6.2.2.4 Charge ready test

Test purpose. CHECK the charge ready state of the vehicle.

6.2.2.5 Charging stage test

Test purpose. CHECK the communication state of the vehicle in the charging initiation stage and charging process.

6.2.2.6 Normal charging termination test

Test purpose. CHECK the vehicle's response under normal charging

6.2.3 Charging connection control timing test

Test purpose. CHECK whether the vehicle's charging connection control timing is normal.

6.2.4 Charging abnormal state test
6.2.4.1 Insulation fault test

Test purpose. CHECK the vehicle's insulation fault monitoring function. Test method and procedures.

6.2.4.2 Communication interruption test

Test purpose. CHECK the vehicle's response when the communication is interrupted.

6.2.4.3 PE needle breakage test

Test purpose. When the vehicle's pull-up voltage U2 is greater than 15.2V and less than 31V, with an accuracy of not greater than 1%, or when U2 is greater than 22V and less than 30V, with an accuracy of not greater than 5%, CHECK the vehicle's response during PE needle breakage. Test method and procedures.

6.2.5 Test of control pilot voltage boundary value

Test purpose. CHECK whether the vehicle is charging normally in case of the boundary voltage value at test point 2.

6.2.5.1 Test of boundary voltage value at test point 2

6.2.5.2 Test of auxiliary power supply boundary voltage value

Test purpose. CHECK whether the vehicle is charging normally in case of the auxiliary power supply boundary voltage value.

6.3 Interoperability test of AC charging

6.3.1 Test system

The circuit and control principle of the interoperability test system of electric vehicle AC charging shall comply with Annex A of GB/T 18487.1-2015. The test system simulates an AC charging pile to test the charging control process, connection control timing, and abnormal charging state response of the electric vehicles. The test system's structure is illustrated in Figure 3.

The interoperability test system of electric vehicle AC charging shall be able to test the following contents. […]

6.3.2 Charge control process test
6.3.2.1 Vehicle charging and driving interlock test

Test purpose. DETERMINE the non-driving state of the vehicle after the vehicle plug is engaged with the vehicle socket. Test method and procedures.

6.3.2.2 Connection validation test

Test purpose. DETERMINE whether the vehicle interface is able to be fully connected.

6.3.2.3 Charge ready test

Test purpose. CHECK the charge ready state of the vehicle.

Test method and procedures. After the vehicle interface is fully connected, the test system sends a PWM signal to check the test point 1's voltage value and charging state.

6.3.2.4 Startup and charging stage test

Test purpose. CHECK the charging control function of the vehicle. Test method and procedures.

6.3.2.5 Normal charging termination test

Test purpose. CHECK the vehicle's response under normal charging termination conditions.

6.3.3 Charging connection control timing test

Test purpose. CHECK whether the vehicle's charging connection control timing is normal.

6.3.4 Charging abnormal state test
6.3.4.1 Switch S3 disconnection test

Test purpose. CHECK the vehicle's response when the switch S3 is disconnected.

Test method and procedures. In the normal charging process, SIMULATE to disconnect the switch S3 from close state. CHECK the vehicle's charging state, and voltage value at test point 1.

Conformance assessment. The vehicle shall reduce the charging current to the minimum (< 1A) within 1s. Then, DISCONNECT the switch S2 (if the vehicle is configured with S2).

6.3.4.2 CC disconnection test

Test purpose. CHECK the vehicle's response during CC disconnection.

Test method and procedures. In the charge preparation stage and normal charging process, SIMULATE to disconnect the vehicle interface's CC connection, respectively. CHECK the test point 1's voltage value and charging state.

6.3.4.3 CP interrupt test

Test purpose. CHECK the vehicle's response during CP signal interrupt.

Test method and procedures. In the normal charging process, SIMULATE to disconnect the CP signal. CHECK the test point 1's voltage value and charging state.

6.3.5 Charge control output test
6.3.5.1 PWM duty ratio variation test

Test purpose. CHECK the vehicle's response during PWM duty ratio variation. Test method and procedures.

6.3.5.2 PWM duty ratio over-limit test

Test purpose. CHECK the vehicle's response during PWM duty ratio over-limit.

6.3.5.3 PWM frequency boundary value test

Test purpose. CHECK whether the vehicle is charging normally at the PWM frequency boundary value.

6.3.6 Control loop test
6.3.6.1 CP loop boundary voltage value test

Test purpose. CHECK whether the vehicle is charging normally at the CP loop boundary voltage value.

6.3.6.2 CP loop boundary resistance value test

Test purpose. CHECK whether the vehicle is charging normally at the CP loop boundary resistance value. […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 22 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 34657.2-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
22 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 34657.2-2017

$125.00