Valid

GB/T 34596-2017The technical specifications for remanufacturing of automotive components—Oil pump (English PDF)

汽车零部件再制造产品技术规范 机油泵

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 34596-2017 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

October 14, 2017

Implementation date

May 1, 2018

Scope

GB/T 34596-2017 is the English-translated version of 汽车零部件再制造产品技术规范 机油泵.

GB/T 34596-2017 is the Chinese standard "The technical specification for remanufacturing of automotive components - Oil pumps".

Its scope clause reads: This Standard specifies the terms and definitions, disassembly, classification and cleaning requirements, testing and repair requirements, assembly requirements, performance requirements, inspection requirements, marking and packaging requirements for remanufacturing of oil pumps.

This Standard is applicable to the remanufacturing of oil pumps for automotive engines. Its clauses include terms and definitions; disassembly, classification, and cleaning requirements; testing and repair requirements; assembly requirements; performance requirements; inspection requirements; marking and packaging requirements.

It was issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China on OCTOBER 14, 2017 and took effect on MAY 1, 2018.

Found what you need?

Document preview — GB/T 34596-2017

National Standard of the People's Republic of China

ICS
43.060.30
Classification
T 14

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Foreword3
  • 1 Scope4
  • 2 Normative references4
  • 3 Terms and definitions5
  • 4 Disassembly, classification, and cleaning requirements5
  • 5 Testing and repair requirements5
  • 6 Assembly requirements9
  • 7 Performance requirements10
  • 8 Inspection requirements10
  • 9 Marking and packaging requirements11

1 Scope

This Standard specifies the terms and definitions, disassembly, classification and cleaning requirements, testing and repair requirements, assembly requirements, performance requirements, inspection requirements, marking and packaging requirements for remanufacturing of oil pumps.

This Standard is applicable to the remanufacturing of oil pumps for automotive engines.

2 Normative references

The following documents are essential to the application of this document. For dated references, only the editions with the dates indicated are applicable to this document. For undated references, only the latest editions (including all the amendments) are applicable to this document.

GB/T 6809.6 Reciprocating internal combustion engines -- Vocabulary of components and systems -- Part 6: Lubricating systems

GB/T 26989 Automobile recovery -- Terminology

GB/T 28675 Remanufacturing of automotive components -- Disassembly

GB/T 28676 Remanufacturing of automotive components -- Classification

GB/T 28677 Remanufacturing of automotive components -- Cleaning

GB/T 28678 Remanufacturing of automotive components -- Pre-delivery inspection

GB/T 28679 Remanufacturing of automotive components -- Assembly

JB/T 8413.2-2010 Internal combustion engines -- Oil pumps -- Part 2: Assemblies -- Methods for test

QC/T 289-2001 Technical specifications for oil pump of automotive engine

5 Testing and repair requirements

5.1.2.1 Defective pump bodies that are not affected by oil pressure or mechanical forces may be repaired using stitching, welding repair, special glue to bond the broken and cracked parts of castings, or other methods. After repair, it is required to make a smooth surface by grinding. If it is on the machined surface, APPLY grinding or cutting until it is flush with the reference surface.

5.1.2.2 Defects such as pores, blisters, etc. can be filled with professional repair agents; or metal plugs with the same quality as the castings can be embedded in plugs after the treatment is finished; or USE hot-melt materials for spraying; or USE a variety of other welding process to repair, through the addition of materials, followed by machining and cutting.

5.1.2.3 If the diameter of the pump body's inner cavity (gear chamber, and rotor chamber) is out of tolerance, it shall be repaired by the inner cavity inlaying method. Or USE laser cladding, cold welding, spraying, and other methods to restore the size.

5.1.2.4 Where the size of the shaft bore of the pump body is out of tolerance or worn, the reaming method is used to eliminate wear trace. Then PROVIDE an optional oversized lining. Or PROVIDE an oversized driven shaft after enlargement of the driven shaft hole. Or USE laser cladding, cold welding, spraying, and other methods to restore the inner hole size.

5.1.2.5 For the damages to machining plane, USE metal spraying or other welding repair methods to repair, through the addition of materials, followed by machining and cutting.

5.1.2.6 In the case that the remaining holes are damaged, the damaged mating holes are pretreated and repaired by welding repair. The damages to the threaded holes of non-high-strength bolts can be repaired by expanding the threaded holes and re-inserting the silk sleeve. High-strength bolt holes are not allowed to be repaired. If there is any damage, it shall be discarded.

5.1.2.7 If the above defects cannot be repaired, it shall be discarded.

5.2 Testing and repair of pump cover parts

5.2.1 Pump cover testing

5.2.1.1 Non-destructive testing methods can be used to detect whether the pump cover has cracks, pores, blisters, etc.

5.2.1.2 TEST the dimensional tolerance, geometric tolerance, surface structure, etc. of the pump cover.

5.2.2 Pump cover repair

5.2.2.1 If there are any defects such as cracks, pores, blisters, etc., the repair

7 Performance requirements

7.1 The basic performance requirements for remanufactured oil pumps shall comply with the provisions of Chapter 4 in QC/T 289-2001.

7.2 The reliability test time of remanufactured oil pumps shall not be less than 350h. After the test, the performance shall comply with the provisions of 4.7 in QC/T 289-2001.

8 Inspection requirements

8.1 Type inspection

8.1.1 The type inspection shall be carried out under one of the following circumstances.

a) when finalizing the design for the first time, or the finalized products are transferred to another factory for production;

b) after the formal production, there are major changes in process, etc., which may affect the product performance;

c) after the formal production, PERFORM every two years;

d) when there is a major difference between the exit-factory inspection results and the last type inspection results.

8.1.2 The type inspection items include.

a) oil absorption performance;

b) speed characteristics;

c) pressure characteristics;

d) pressure-limiting valve's operating characteristics;

e) viscosity characteristics;

f) sealing characteristics; g) reliability.

8.1.3 The pedestal performance test for remanufactured oil pumps shall be carried out in accordance with the provisions of Chapter 7 in JB/T 8413.2-2010.

The reliability test shall be carried out in accordance with the provisions of 6.3 in QC/T 289-2001.

8.2 Exit-factory inspection

The remanufactured oil pumps shall be subject to exit-factory inspection in accordance with the technical requirements for remanufactured products. The inspection items include.

a) oil absorption performance; […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

Similar standards

How to Download GB/T 34596-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 34596-2017

$125.00