Valid

GB/T 34572-2017Railway applications -- Current collection system -- Pantographs, testing methods for carbon contact strips (English PDF)

轨道交通 受流系统 受电弓碳滑板试验方法

Preview PDF

This is a limited preview

Buy now to download the full PDF (15 pages)

Need quotation for your management?

Get a formal quotation for GB/T 34572-2017 in 30 minutes.

Issued by

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Level / Type

National · Recommended

Issue date

September 29, 2017

Implementation date

April 1, 2018

Scope

GB/T 34572-2017 is the English-translated version of 轨道交通 受流系统 受电弓碳滑板试验方法.

GB/T 34572-2017 — This standard specifies the method of carbon skateboard test. This standard applies to the performance and structure of carbon skateboard (excluding installation bolts) inspection.

Found what you need?

Document preview — GB/T 34572-2017

National Standard of the People's Republic of China

ICS
45.060
Classification
S 04

Issued by: General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

Contents

  • Preface
  • 1 Scope
  • 2 Normative references
  • 3 Terms and definitions
  • 4 Symbol
  • 5 Test
  • 5.1 Test classification
  • 5.2 Test Procedure
  • Appendix A (informative) This standard and IEC 62499:2008 subsection number contrast list
  • Appendix B (Normative) Test Project Summary Table
  • Appendix C (Informative) User-specified parameters
  • References

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009.

This standard uses redrafted law revision adopted IEC 62499:2008 "rail transit flow system pantograph carbon skateboard test side law".

This standard compared with IEC 62499:2008 in the structure of more adjustment, the specific chapter number control see Appendix A.

This standard compared with IEC 62499:2008 there are technical differences, the provisions of these differences have been passed in the outer margin of the page margin Set the vertical single line (-) were marked, the technical differences and the reasons are as follows.

--- Increasing the normative references, due to the text changes cited (see 5.2.2);

--- Modify and add the relevant symbols (see Chapter 4, Chapter 4 of IEC 62499:2008);

--- Increased the size of the inspection, with reference to TB/T 1842.3-2008 improve the pilot project (see 5.2.1);

--- Increase the carbon performance test, with reference to TB/T 1842.3-2008 improve the pilot project (see 5.2.2);

--- Increased carbon skateboard at the maximum operating temperature of the current-carrying capacity test to improve the stability of carbon skateboard requirements (see 5.2.3.3);

--- Modify the original air tightness test and temperature test, the two combined test revised to check the air pressure through the inspection of a Test, because the original leak of gas leak detection inconvenience, learn from GB/T 21561.1-2008 application experience and pantograph gas-tight Sexual testing methods to change the test protocol (see 5.2.7.2.1, 5.2.5.2.1, 5.2.5.2.2 of IEC 62499-2008);

--- Increase the wear test, with reference to TB/T 1842.3-2008 improve the pilot project (see 5.2.10);

--- Remove the acceptance criteria of the test methods, the relevant content is the product standard range (see IEC 62499:2008 5.2.1.2, 5.2.2.2.2, 5.2.4.2.1, 5.2.4.2.3, 5.2.5.2.1, 5.2.5.2.2, 5.2.5.2.3, 5.2.5.2.4.2, 5.2.6.2, 5.2.7.2) .

This standard also made the following editorial changes.

--- Modify 5.2.3, 5.2.3.2 title and 5.2.3.1 Overview;

--- Modify some references in the literature.

This standard proposed by the National Railway Administration.

This standard by the National Traction Electrical Equipment and Systems Standardization Technical Committee (SAC/TC278) centralized.

1 Scope

This standard specifies the method of carbon skateboard test.

This standard applies to the performance and structure of carbon skateboard (excluding installation bolts) inspection.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document.

JB/T 8133.1 Charcoal products physical and chemical properties of test methods - Part 1. Specimen processing technology requirements JB/T 8133.2 Charcoal products physical and chemical properties of test methods - Part 2. Resistivity JB/T 8133.3 Charcoal products physical and chemical properties of test methods - Part 3 Rockwell hardness JB/T 8133.7 Charcoal products physical and chemical properties of test methods - Part 7. Bending strength JB/T 8133.8 Charcoal products physical and chemical properties test methods Part 8. Compressive strength JB/T 8133.14 Charcoal products physical and chemical properties of test methods - Part 14. Bulk density

3 Terms and definitions

The following terms and definitions apply to this document.

Carbon skateboard carboncontactstrip the strip of carbon material permanently bonded to the support structure (bracket) formed by the whole, excluding the mounting bolts.

Shearstrength

The stress that causes failure of the bond between the carbon and the support structure.

Automatic bow down sensing device autodropdetectionsensor Mechanics that signal the pantograph automatic bow down (ADD) in a carbon skateboard.

Flow Continuity

Uninterrupted flow of air or other fluids.

Rated current load ratedcurrentloading Under specified operating conditions, carbon skateboards designed by the supplier can sustain the current without degrading the performance.

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 15 pages — is available in the English PDF.

Referenced standards

How to Download GB/T 34572-2017

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
15 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 34572-2017

$235.00