GB/T 33301-2016Calculating and evaluation methods of energy saved for coal industrial boilers and furnaces (English PDF)
燃煤工业锅炉及窑炉节能量计算方法
This is a limited preview
Buy now to download the full PDF (20 pages)
Need quotation for your management?
Get a formal quotation for GB/T 33301-2016 in 30 minutes.
Issued by
SAMR; SAC
Level / Type
National · Recommended
Issue date
December 13, 2016
Implementation date
July 1, 2017
Scope
GB/T 33301-2016 is the English-translated version of 燃煤工业锅炉及窑炉节能量计算方法.
GB/T 33301-2016 sets how the energy saved by a coal-fired industrial boiler or kiln is calculated and judged after a technical improvement.
It gives the basic principles of the calculation, the principle by which the saving is attributed to the measure taken, the calculation itself, the parameters to be measured and the test methods that produce them, and the method for assessing the result.
It applies to the calculation and evaluation of energy saving in coal-fired industrial boilers and kilns that have undergone an energy-saving retrofit. Plant operators, energy service companies and the authorities that verify a saving use it. Issued on 13 December 2016, it has applied since 1 July 2017.
Found what you need?
Document preview — GB/T 33301-2016
National Standard of the People's Republic of China
- ICS
- 27.010
- Classification
- F 01
Issued by: State Administration for Market Regulation; Standardization Administration of the PRC
Contents
- Foreword
- 1 Scope
- 2 Normative reference documents
- 3 Terms and definitions The following
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
1 Scope
This standard specifies the basic principles of the energy saving calculation of the boiler and kiln in the coal-fired industry, the principle of the value of the standard value of the energy standard, Sector, energy saving calculation, the relevant parameters of the test method, energy saving assessment method.
This standard is applicable to the calculation and evaluation of energy saving of coal-fired industrial boilers and kiln energy-saving technological transformation projects (hereinafter referred to as "projects"). new Construction projects, management of energy-saving projects can also refer to the use of energy.
2 Normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this document. For undated references, the latest edition (including all modifications) applies to this document.
Method for determination of calorific value of GB/T Test code for thermal performance of GB/T 10180 industrial boilers Calculation method of energy saving in enterprises GB/T 13234 General rules for the preparation and management of energy - carrying units Test and calculation method of thermal balance and thermal efficiency of ceramic kiln GB/T Method for determination of heat balance of cement rotary kiln GB/T 26282
3 Terms and definitions The following
terms and definitions apply to this document.
3.1 Energy saving energizes
Coal-fired industrial boilers and kilns before and after the implementation of energy-saving technical measures to meet the same needs or to achieve the same purpose under the conditions to reduce energy consumption The amount of charge, expressed in tons of standard coal.
3.2 Energy saving rate
Coal-fired industrial boilers and kilns to implement energy-saving technical measures before and after the unit energy consumption reduction rate, expressed as a percentage.
Basic principles Coal-fired industrial boilers and kilns in the technical transformation project energy efficiency calculation and evaluation, should follow the following basic principles.
a) The equipment, installation, verification or calibration of energy metering equipment shall be carried out in accordance with GB 17167.
b) The control device and instrument shall be in good condition and shall be qualified or calibrated in accordance with the relevant regulations.
c) The operating records should be complete and accurate; the technical files are complete.
d) After the energy-saving technological transformation is completed and the continuous and stable operation can be carried out, the energy saving calculation and evaluation can be carried out. The energy statistics period is Before and after the transformation of the year.
e) When calculating the energy consumption in the reporting period using a survey interval energy consumption, the reason and the rationality of the projections should be stated.
f) Energy savings should be calculated using the corresponding benchmark. Industrial boilers should use the actual output unit calorific value of the energy consumption as a ratio
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.
Referenced standards
Similar standards
How to Download GB/T 33301-2016
- 1
Add to cart
Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.
- 2
Checkout
Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).
- 3
Instant delivery (0–9 sec)
Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4
Invoice included
A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 10003-2026 — Biaxially oriented polypropylene (BOPP) film
GB/T 10004-2026 — Plastic/Plastic laminated films and pouches for packaging
GB/T 10007-2026 — Rigid cellular plastics - Determination of shear properties
Secure payment via Stripe
Payments accepted
GB/T 33301-2016
$145.00