Valid

GB/T 32899-2016Test code of SFC starting device for pumped storage power unit (English PDF)

抽水蓄能机组静止变频启动装置试验规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (16 pages)

Need quotation for your management?

Get a formal quotation for GB/T 32899-2016 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 29, 2016

Implementation date

March 1, 2017

Scope

GB/T 32899-2016 is the English-translated version of 抽水蓄能机组静止变频启动装置试验规程.

GB/T 32899-2016 is the Chinese standard "Test code of SFC starting device for pumped storage power unit". Its scope clause reads: This standard specifies the pilot classification, test items, basic test methods and requirements of the static frequency conversion starting device of the pumped storage unit.

This standard applies to a variety of capacity of the pump storage unit static variable frequency starting device test. Its clauses include normative reference documents.

Found what you need?

Document preview — GB/T 32899-2016

National Standard of the People's Republic of China

ICS
27.140
Classification
P 55

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 normative reference document
  • 3 Terms and definitions
  • 4 test classification
  • 4.1 Type test
  • 4.2 Factory test
  • 4.3 Field test
  • 4.4 Periodic test
  • 5 Test items and related requirements
  • 5.1 General provisions
  • 5.2 Test items
  • 5.3 Test record requirements
  • 5.4 Periodic test period
  • 6 basic test method
  • 6.1 General provisions
  • 6.2 input (output) transformer test
  • 6.3 input/output circuit breaker, filter circuit breaker test
  • 6.4 AC reactor test
  • 6.5 DC reactor test
  • 6.6 disconnector (including bypass switch), ground switch test
  • 6.7 High voltage cable test
  • 6.8 Bus test
  • 6.9 Filter test
  • 6.10 arrester test
  • 6.11 Current Transformer Test
  • 6.12 voltage transformer test
  • 6.13 rectifier bridge, inverter bridge test
  • 6.14 Auxiliary equipment test
  • 6.15 Static frequency converter controller test
  • 6.16 System intermodulation
  • Appendix A (normative) Type test, factory test, field test and periodic test item
  • Appendix B (informative) Regular inspection of the test cycle Table

1 Scope

This standard specifies the pilot classification, test items, basic test methods and requirements of the static frequency conversion starting device of the pumped storage unit.

This standard applies to a variety of capacity of the pump storage unit static variable frequency starting device test.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article

Pieces. For undated references, the latest edition (including all modifications) applies to this document.

GB 1094.1 Power transformers - Part 1. General

GB 1094.2 Power transformers - Part 2. Temperature rise of liquid immersion transformers

GB 1094.3 Power transformers - Part 3. Insulation level, insulation test and external insulation air gap

GB/T 1094.4 Power transformers - Part 4. Lightning shock and operational shock test guidelines for power transformers and reactors

Power transformers - Part 6. Reactors GB/T Power transformers - Part 11. Dry - type transformers

High - voltage AC circuit breakers

High - voltage AC disconnectors and earthing switches

GB/T 4109 Insulation sleeve with AC voltage higher than 1000V

GB/T 7260.3 Uninterruptible power supply (UPS) - Part 3. Methods and test requirements for determining performance

Test method for hydraulic hose assembly GB/T GB/T 11022 high voltage switchgear and control equipment standard common technical requirements

GB 11032 AC gapless metal oxide surge arresters

Technical specification for relay protection and safety automatic device GB/T 14285

GB/T 15153.2 Telecontrol equipment and systems - Part 2. Working conditions - Part 2. Environmental conditions (climate, machinery and other non -

Electric influence factor)

GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test

Transformer transformers - Part 1. Transformers for industrial use

GB 20840.2 Transformers - Part 2. Supplementary technical requirements for current transformers

GB/T 20840.7 Transformers - Part 7. Electronic voltage transformers

Transformers - Part 8. Electronic current transformers GB/T GB 50150 electrical installations installation engineering electrical equipment transfer test standards

Code for fire protection design of thermal power plants and substations GB 50229

Code for construction of industrial metal piping GB 50235

Specification for preventive test of electrical equipment

Overvoltage protection and insulation fit for DL/T 620 AC electrical installations

DL/T 799.3 Technical specification for labor environment monitoring in the power industry - Part 3. Productivity noise monitoring

Code for inspection of DL/T 995 relay protection and grid safety automatic device

Guide for testing and adjusting microcomputer excitation regulators for large and medium - sized hydro - generators […]

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 16 pages — is available in the English PDF.

Similar standards

How to Download GB/T 32899-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Instant delivery (0–9 sec)

    Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
16 pages
Instant delivery (0–9 sec)
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32899-2016

$285.00