GB/T 32878-2016Code of operation for reversible pump-turbine regulating system (English PDF)

可逆式水泵水轮机调节系统运行规程

Preview PDF

This is a limited preview

Buy now to download the full PDF (17 pages)

Need quotation for your management?

Get a formal quotation for GB/T 32878-2016 in 30 minutes.

Issued by

SAMR; SAC

Level / Type

National · Recommended

Issue date

August 29, 2016

Implementation date

March 1, 2017

Scope

GB/T 32878-2016 is the English-translated version of 可逆式水泵水轮机调节系统运行规程.

This standard is the code of operation for the regulating system of a reversible pump-turbine. Clause 1 states that it specifies the basic requirements, the operation mode, the operation itself, inspection, and fault and accident handling for that system, and that it applies to the operation of the reversible pump water turbine regulating system.

The directory runs clause 4 basic requirements, clause 5 running mode, clause 6 run the operation, clause 7 inspection, clause 8 failure and accident handling, and closes with the informative Appendix A on the basic content of the operational procedures for reversible pump turbine regulation systems.

Clause 3 defines six terms, among them non-synchronized guide vanes, controlled separately from the linkage of the control ring so that the unit stays stable at rated speed, and the oil pressure supply system, which feeds operating oil to synchronous and non-synchronized guide vanes.

It also separates three regulating modes: power control, in which the monitoring system sends the governor an active power setpoint in analogue or digital form and the governor closes the loop on active power; opening control, in which the governor closes the loop on guide vane opening; and speed/frequency control, used at no-load generation, on an isolated grid, during line charging, black start and back-to-back start, in which the governor follows frequency feedback to hold the unit frequency inside a range.

The draft breaks off in the middle of the definition of primary frequency control, so none of clauses 4 to 8 is shown. Clause 2 cites GB/T 9652.1-2007, DL/T 293 and DL/T 792-2013.

The foreword warns that some of the content may involve patents, for which the issuer takes no responsibility, and records that the standard was proposed by the China Electricity Council. It was issued on 2016-08-29 and has applied since 2017-03-01.

Found what you need?

Document preview — GB/T 32878-2016

National Standard of the People's Republic of China

ICS
27.140
Classification
F 23

Issued by: State Administration for Market Regulation; Standardization Administration of the PRC

Contents

  • Preface
  • 1 Scope
  • 2 normative reference document
  • 3 Terms and definitions
  • 4 basic requirements
  • 5 running mode
  • 6 Run the operation
  • 7 inspection inspection
  • 8 failure and accident handling
  • Appendix A (informative) The basic content of the operational procedures for reversible pump turbine regulation systems

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009.

1 Scope

This standard specifies the basic requirements for the operation of a reversible pump turbine regulator system, operation mode, operation operation, inspection inspection, fault and Accident handling and other requirements.

This standard is applicable to the operation of the reversible pump water turbine regulating system.

2 Normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this document. For undated references, the latest edition (including all modifications) applies to this document.

Technical condition of hydraulic turbine control system GB/T 9652.1-2007 Code of Practice for DL/T 293 Pumped Storage and Reversible Pump Turbine Technical specification for hydraulic fluid control system and device for hydraulic turbine Code for operation and maintenance of turbine control system and device for DL/T 792-2013

3 Terms and definitions

The following terms and definitions apply to this document.

3.1 Non-synchronized guide vanes

Considering the influence of the hydraulic characteristics of the unit, in order to maintain the stability of the unit when the deadline is fixed at the rated speed, the linkage of the control ring On the realization of a separate control of the guide vane.

3.2 Oil pressure supply system

Means for supplying the synchronous guide vanes and/or non-synchronized guide vanes for operating oil.

3.3 Power control

When the power generation conditions, the monitoring system to the governor to send analog or digital (communication mode) in the form of active power setpoint, the governor from Line to the active power of the closed-loop control of the adjustment mode.

3.4 Opening control

The governor adjusts the vane opening to the closed loop control mode.

3.5 Speed/frequency control

When the unit is in the no-load power generation, isolated power grid, line charging, black start and back to back start running, the governor to a given frequency for the regulation Target, according to the frequency feedback changes automatically adjust the guide vane opening, so that the unit frequency to maintain a certain range of adjustment mode.

3.6 Primary frequency control

Unit in the power generation conditions in the opening adjustment mode and power adjustment mode, when the system frequency changes more than the governor of the frequency/speed dead

......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 17 pages — is available in the English PDF.

Similar standards

How to Download GB/T 32878-2016

  1. 1

    Add to cart

    Click "Download PDF" on this page and choose "Buy this standard". You can add more standards before checkout.

  2. 2

    Checkout

    Enter your email and billing details. Payment is processed securely by Stripe (cards or bank transfer). Prefer bank details? Request a quotation (min. order $300).

  3. 3

    Fast delivery

    After payment you'll receive an email confirmation. The English PDF is sent to the same address, usually within minutes and at the latest within 1 business day.

  4. 4

    Invoice included

    A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.

Related Standards

English PDF
17 pages
Fast delivery
Invoice included
View Cart

Secure payment via Stripe

Payments accepted

VisaMastercardAmerican ExpressApple PayGoogle PayStripe

GB/T 32878-2016

$295.00