GB/T 32715-2016Integrated micro hydro generating units (English PDF)
整装微型水轮发电机组
Open the GB/T 32715-2016 preview as PDF
This is a limited preview
Buy now to download the full PDF (20 pages)
Issued by
General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC
Level / Type
National · Recommended
Issue date
August 29, 2016
Implementation date
March 1, 2017
Scope
GB/T 32715-2016 is the English-translated version of 整装微型水轮发电机组.
China's national standard for integrated micro hydro generating units. It specifies the terms and definitions, the basic parameters, the model designation, the technical requirements and test methods, the factory inspection, the nameplate, packaging, transport and storage, the installation, and the operation, maintenance and repair of these units, with an informative annex giving the performance parameters of complete micro hydro turbine generator sets. It applies to units of rated power 100 kW and below. An integrated unit is one in which the turbine, the generator and the control equipment are assembled and supplied as a single package rather than being specified, procured and matched on site. That distinction is what the standard exists for. A conventional hydro installation is engineered: the head and flow of the site are surveyed, a turbine is selected and its runner designed for those conditions, a generator is matched to it, and the civil works are built around the result. That process is entirely appropriate for a megawatt station and entirely disproportionate for a stream turning a machine the size of a motorcycle engine. Micro hydro at this scale is installed in villages, on farms and at remote facilities, by people who are not hydraulic engineers, at sites that will never see a specialist survey. Supplying the unit as a matched package moves the engineering into the factory and leaves the installer with a machine that has a stated head and flow range and a stated output. That is why the standard covers installation and operation as well as manufacture: for this product they are part of what is being standardised, because the person doing them has only the manual. Issued on 29 August 2016 and in force since 1 March 2017.
Document preview — GB/T 32715-2016
National Standard of the People's Republic of China
- ICS
- 29.160.40
- Classification
- K 52
Issued by: General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the PRC
Contents
- 1 Scope
- 2 Normative reference documents
- 3 Terms and definitions
- 4 Basic parameters
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by the Ministry of Water Resources of the People's Republic of China. This standard is under the jurisdiction of the Ministry of Water Resources Rural Hydropower and Electrification Development Bureau. The drafting unit. the Ministry of Water Resources Product Quality Standards Institute, Hangzhou Jianghe Electrical and Mechanical Equipment Engineering Co., Ltd. The main drafters of this standard. Xie Yaqin, Jie Jianan, Liang Zhenhua, Liu Xian, Wu Yanming, Xu Hongquan, Zheng Yuan, Gu Rong. Complete miniature hydroelectric generating units
1 Scope
China's national standard for integrated micro hydro generating units. It specifies the terms and definitions, the basic parameters, the model designation, the technical requirements and test methods, the factory inspection, the nameplate, packaging, transport and storage, the installation, and the operation, maintenance and repair of these units, with an informative annex giving the performance parameters of complete micro hydro turbine generator sets. It applies to units of rated power 100 kW and below. An integrated unit is one in which the turbine, the generator and the control equipment are assembled and supplied as a single package rather than being specified, procured and matched on site. That distinction is what the standard exists for. A conventional hydro installation is engineered: the head and flow of the site are surveyed, a turbine is selected and its runner designed for those conditions, a generator is matched to it, and the civil works are built around the result. That process is entirely appropriate for a megawatt station and entirely disproportionate for a stream turning a machine the size of a motorcycle engine. Micro hydro at this scale is installed in villages, on farms and at remote facilities, by people who are not hydraulic engineers, at sites that will never see a specialist survey. Supplying the unit as a matched package moves the engineering into the factory and leaves the installer with a machine that has a stated head and flow range and a stated output. That is why the standard covers installation and operation as well as manufacture: for this product they are part of what is being standardised, because the person doing them has only the manual. Issued on 29 August 2016 and in force since 1 March 2017.
This standard specifies the terms and definitions of the complete micro-hydro-generator (hereinafter referred to as the unit). The basic parameters, type and technology Summarize the test method, and the factory inspection, nameplate, packaging, transportation and storage, installation, operation, maintenance and maintenance requirements. This standard applies to the rated power of 100kW and below the unit.
2 Normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB 755 Rotating motor quota and performance
GB/T 1029 three - phase synchronous motor test method
GB/T 2900.45 Electrotechnical terminology Hydrographic equipment for hydropower stations
GB/T 3323 metal fusion welding joint radiography
GB/T 4942.1 Protection class of the overall structure of the rotating electrical machine (IP code) classification
GB/T 10585 basic technical requirements for small and medium synchronous motor excitation system Technical requirements for flow - through components of hydraulic turbine, pump and pump Technical specification for installation of
GB/T 17525 micro hydroelectric power equipment Guide for Electromechanical Equipment for Small Hydropower Stations GB/T
GB/T 21718 basic technical conditions for small turbines
GB/T 22140 small water turbine on-site acceptance test procedures Specification for Static Balance of Small and Medium - sized Turbine Runners in
JB/T 6752 Specification for packaging, transport and storage of
JB/T 8660 hydroelectric units Safety operation rules for
NY/T 666 micro hydroelectric power equipment
3 Terms and definitions
GB/T 2900.45 The definitions and definitions of the following terms and definitions apply to this document.
3.1 The turbines and generators are integrated into one and include integrated devices for the controller.
3.2 Controller controler Set speed, excitation, control, protection and other functions in one integrated device.
4 Basic parameters
4.1 The basic parameters of the unit The basic parameters of the unit are as follows: * * *
......
This preview omits tables, figures, formulas and parts of the technical clauses. The complete document — 20 pages — is available in the English PDF.
Referenced standards
Normative references
- GB/T 1029Test procedures for three-phase synchronous machines
- GB/T 21718Fundamental technical requirements for small hydraulic turbines
GB 755 · GB/T 2900.45 · GB/T 3323 · GB/T 4942.1 · GB/T 10585 · GB/T 17525 · GB/T 22140 · JB/T 6752 · JB/T 8660 · NY/T 666
Similar standards
GB/T 17525-1998|GB/T 2900.45-2006|GB 755-2008|GB/T 10585-2006|GB/T 21426-2008
How to Buy GB/T 32715-2016
- 1Add to cart. Click the "Buy GB/T 32715-2016" button on this page. You can add more standards before checkout.
- 2Checkout. Enter your email and billing details. Payment is processed securely by Stripe (cards, Apple Pay, Google Pay supported).
- 3Instant delivery (0–9 sec). Delivery is automatic: within seconds of payment you'll receive an email with a secure download link. The link stays valid for 72 hours.
- 4Invoice included. A tax invoice is attached to the confirmation email. Need a custom invoice? Contact us.
Related Standards
GB/T 1029-2021 — Test procedures for three-phase synchronous machines
GB/T 10297-2015 — Test method for thermal conductivity of nonmetal solid materials - hot-wire method
GB/T 10299-2011 — Test method for hydrophobic nature of thermal insulation